Volunteer Paving, LLC: TDOT bid record
Volunteer Paving, LLC submitted 114 bids on Tennessee DOT contracts in the data, from 09 FEB 2018 to 26 JUN 2026, and was the low bidder on 26 of them (23%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $72,928,146
- Latest bid
- 26 JUN 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 11 | 1 | 9% |
| 2020 | 18 | 6 | 33% |
| 2023 | 2 | 2 | 100% |
| 2024 | 26 | 5 | 19% |
| 2025 | 37 | 9 | 24% |
| 2026 | 20 | 3 | 15% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Williamson County | 9 | 2 | 22% |
| Maury County | 7 | 3 | 43% |
| Davidson County | 6 | 4 | 67% |
| Lincoln County | 5 | 0 | 0% |
| Rutherford County | 5 | 0 | 0% |
| Lewis County | 4 | 0 | 0% |
| Coffee County | 4 | 3 | 75% |
| Lawrence County | 4 | 1 | 25% |
| Henderson County | 4 | 0 | 0% |
| Counties Bedford, Cheatham, Davidson, Dickson, Giles, Hickman, Houston, Humphreys, Lawrence, Lewis, Lincoln, Macon, Marshall, Maury, Montgomery, Moore, Perry, Robertson, Rutherford, Smith, Stewart, Sumner, Trousdale, Wayne, Williamson, And Wilson | 3 | 1 | 33% |
| Decatur County | 3 | 0 | 0% |
| Bedford County | 3 | 1 | 33% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Enhanced flatline thermo PVMT MRKNG (6IN line) | 716-12.02 | LM | 101 | 50 (50%) | $7,000.00 | $7,425.00 |
| Plastic pavement marking(channelization striping) | 716-02.04 | SY | 79 | 45 (57%) | $35.00 | $29.75 |
| Removal of snowplowable reflective marker | 716-01.30 | EACH | 73 | 45 (62%) | $10.00 | $12.00 |
| Plastic pavement marking (stop line) | 716-02.05 | LF | 103 | 44 (43%) | $20.00 | $17.30 |
| Painted pavement marking (6" line) | 716-05.20 | LM | 68 | 37 (54%) | $1,200.00 | $1,400.00 |
| Brooming & degrassing shoulders | 208-01.05 | LM | 75 | 30 (40%) | $1,223.72 | $1,500.00 |
| Signs (construction) | 712-06 | SF | 97 | 27 (28%) | $7.61 | $8.00 |
| Plastic pavement marking (turn lane arrow) | 716-02.06 | EACH | 77 | 26 (34%) | $225.00 | $200.68 |
| Cold planing bituminous pavement | 415-01.01 | TON | 83 | 23 (28%) | $23.99 | $34.00 |
| Plastic pavement marking (8IN line) | 716-02.12 | LM | 38 | 23 (61%) | $10,000 | $11,825 |
| Snowplowable raised pavement markers (BI-dir) (1 color) | 716-01.21 | EACH | 76 | 22 (29%) | $42.00 | $40.48 |
| Plastic pavement marking (8" dotted line) | 716-02.08 | LF | 42 | 20 (48%) | $4.00 | $3.10 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Rogers Group, Inc. | 56 | 32 of 56 |
| Jones Bros. Contractors, LLC | 36 | 16 of 36 |
| Vulcan Construction Materials, LLC | 34 | 12 of 34 |
| Lincoln Paving, LLC | 15 | 13 of 15 |
| Delta Contracting Company, LLC | 15 | 13 of 15 |
| Eubank Asphalt Paving & Sealing, LLC | 14 | 13 of 14 |
| Wiregrass Construction Company, Inc | 12 | 5 of 12 |
| Superior Traffic Control, LLC | 12 | 7 of 12 |
| Hawkins Asphalt Paving, LLC | 10 | 8 of 10 |
| Tennessee Valley Paving Co., Inc. | 7 | 3 of 7 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 JUN 2026 | CN263048 | Bedford County | The resurfacing on s.r. 269 from s.r. 82 (l.m. 4.45) to s.r. 64 (l.m. 9.54) | 2 of 4 | $1,105,296 | +3.0% |
| 26 JUN 2026 | CN263049 | Lincoln County | The resurfacing on s.r. 121 from u.s. 64 (s.r. 15) (l.m. 6.85) to the franklin county line (l.m. 11.32) | 2 of 2 | $1,010,837 | +3.0% |
| 26 JUN 2026 | CN263050 | Macon County | The resurfacing on s.r. 141 from s.r. 52 (l.m. 0.00) to the trousdale county line (l.m. 5.57) | 2 of 4 | $1,502,373 | +10% |
| 26 JUN 2026 | CN263054 | Williamson County | The resurfacing on i-65 from south of concord road (l.m. 17.50) to the davidson county line (l.m. 21.38) | 1 of 4 | $4,718,657 | Low, 3.0% under the second |
| 08 MAY 2026 | CN263044 | Sumner County | The resurfacing on u.s. 31e (s.r. 6) from near saundersville road (l.m. 6.60) to near greensboro drive (l.m. 11.00) | 2 of 3 | $3,039,840 | +9.0% |
| 20 MAR 2026 | CN262035 | Coffee County | The resurfacing on s.r. 55 from near south washington street (l.m. 2.80) to north of h.p womack road (l.m. 7.35) | 1 of 2 | $2,655,674 | Low, 7.0% under the second |
| 20 MAR 2026 | CN263030 | Lincoln County | The resurfacing on u.s. 231 (s.r. 10) from the alabama state line (l.m. 0.00) to king drive south (l.m. 8.40) | 2 of 3 | $7,160,031 | +6.0% |
| 20 MAR 2026 | CN263031 | Rutherford County | The resurfacing on s.r. 266 from u.s. 231 (s.r. 10) (l.m. 13.30) to near s.r. 96 (l.m. 18.66) | 4 of 4 | $1,550,000 | +37% |
| 20 MAR 2026 | CN263034 | Sumner County | The resurfacing on s.r. 109 from near old state highway 109 (l.m. 7.20) to academy road (l.m. 16.51) | 1 of 2 | $6,304,033 | Low, 2.0% under the second |
| 20 MAR 2026 | CN263033 | Sumner County | The resurfacing on s.r. 41 from near u.s. 41 (dickerson pike) (l.m. 0.00) to south of s.r. 257 (l.m. 5.00) | 2 of 3 | $2,257,774 | +4.0% |
| 20 MAR 2026 | CN263024 | Williamson County | The resurfacing on s.r. 397 (mack hatcher parkway) from u.s. 31 (s.r. 6) (l.m. 0.00) to s.r. 96 (l.m. 3.20) | 2 of 2 | $2,202,309 | +19% |
| 20 MAR 2026 | CN263036 | Williamson County | The resurfacing on i-65 from near i-840 (l.m. 7.27) to near the bridge over liberty pike (l.m. 13.37) | 3 of 3 | $13,996,731 | +24% |
| 06 FEB 2026 | CN263011 | Bedford County | The resurfacing on s.r. 82 from west of couch lane (l.m. 16.70) to s.r. 64 (l.m. 22.16) | 2 of 3 | $1,318,523 | +4.0% |
| 06 FEB 2026 | CN263004 | Counties Bedford, Cheatham, Davidson, Dickson, Giles, Hickman, Houston, Humphreys, Lawrence, Lewis, Lincoln, Macon, Marshall, Maury, Montgomery, Moore, Perry, Robertson, Rutherford, Smith, Stewart, Sumner, Trousdale, Wayne, Williamson, And Wilson | The retracing of pavement markings with spray thermoplastic and random on-call pavement marking on various interstate and state routes | 2 of 2 | $2,693,435 | +6.0% |
| 06 FEB 2026 | CN263008 | Lawrence County | The resurfacing on s.r. 227 from the wayne county line (l.m. 0.00) to u.s. 43 (s.r. 6) (l.m. 6.70) | 2 of 2 | $1,491,814 | +9.0% |
| 06 FEB 2026 | CN263023 | Lawrence County | The resurfacing on s.r. 242 from west gaines street (l.m. 22.90) to near flatwoods road (l.m. 28.20), including repair work on bridges | 2 of 2 | $1,836,325 | +29% |
| 06 FEB 2026 | CN263014 | Marshall County | The resurfacing on s.r. 270 from u.s. 31a (s.r. 11) (l.m. 0.00) to the bedford county line (l.m. 3.08) | 2 of 4 | $800,948 | +2.0% |
| 06 FEB 2026 | CN263007 | Maury County | The resurfacing on s.r. 166 from the giles county line (l.m. 0.00) to s.r. 243 (l.m. 7.60) | 3 of 4 | $1,359,744 | +11% |
| 06 FEB 2026 | CN263006 | Maury County | The resurfacing on s.r. 50 from park plus drive (l.m. 16.57) to near seavy hight road (l.m. 24.05) | 4 of 4 | $3,048,124 | +14% |
| 06 FEB 2026 | CN263005 | Maury County | The resurfacing on s.r. 7 from near the bridge over snow creek (l.m. 23.11) to the bridge over leipers creek (l.m. 29.30) | 2 of 5 | $2,323,628 | +6.0% |
| 05 DEC 2025 | CNZ296 | Davidson County | The resurfacing on i-40 from near the jefferson street underpass (l.m. 16.44) to the bridge over u.s. 31 (s.r. 6, 8th avenue south) (l.m. 18 | 3 of 4 | $5,637,162 | +4.0% |
| 05 DEC 2025 | CNZ294 | Davidson County | The resurfacing on u.s. 70s (s.r. 1) from 15th avenue north (l.m. 17.00) to near transit avenue (l.m. 20.30) | 1 of 4 | $2,256,458 | Low, 2.0% under the second |
| 05 DEC 2025 | CNZ295 | Davidson County | The resurfacing on s.r. 254 from blue hole road (l.m. 13.97) to u.s. 41 (u.s. 70s, s.r. 1, murfreesboro pike) (l.m. 17.28), including thin e | 1 of 3 | $2,168,993 | Low, 10% under the second |
| 05 DEC 2025 | CNZ297 | Giles County | The resurfacing (either microsurface or thin mix overlay) on u.s. 64 (s.r. 15) from west college street (l.m. 9.32) to near five points road | 4 of 5 | $4,394,047 | +18% |
| 05 DEC 2025 | CNZ302 | Maury County | The resurfacing on i-65 from s.r. 99 (bear creek pike) (l.m. 11.04) to the williamson county line (l.m. 17.68) | 1 of 3 | $5,668,763 | Low, 18% under the second |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.