TDOT contract CN263033 bid tabulation

The resurfacing on s.r. 41 from near u.s. 41 (dickerson pike) (l.m. 0.00) to south of s.r. 257 (l.m. 5.00). Let by Tennessee DOT on March 20, 2026, Sumner County. 3 bids received; low bid $2,181,292 by Rogers Group, Inc..

Owner
Tennessee DOT
Letting
20 MAR 2026
Pay items
31
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rogers Group, Inc.$2,181,292Low
2Volunteer Paving, LLC$2,257,774+4.0%
3Jones Bros. Contractors, LLC$2,355,369+8.0%
TDOT contract CN263033: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rogers Group, Inc.2. Volunteer Paving, LLC3. Jones Bros. Contractors, LLC
1Brooming & degrassing shoulders (208-01.05)LM10$1,550.00$960.22$3,000.00
2Mineral aggregate, type A base, grading D (303-01)TON702$46.00$51.49$50.00
3Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON1,080$115.00$160.66$115.00
4Bituminous material for tack coat (TC) (403-01)TON66$900.00$846.60$860.00
5Acs mix(PG64-22) grading D (411-01.10)TON9,741$118.50$123.39$120.00
6Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03)LM10$600.00$656.50$1,255.00
7Cold planing bituminous pavement (415-01.01)TON10,595$27.75$22.32$32.00
8Guardrail transition 27IN to 31IN (705-02.10)EACH10$82.10$75.75$75.00
9Earth pad for guard rail end treatment (705-04.10)EACH2$875.00$808.00$800.00
10GR terminal (energy absorbing) MASH TL-2 (705-06.30)EACH14$3,260.00$3,004.75$2,975.00
11Guardrail removed (706-01)LF25$0.85$0.76$0.75
12Radius rail (706-06.03)LF12.50$41.25$37.88$37.50
13Traffic control (712-01)LS1$65,000$97,061$100,000
14Flexible drums (channelizing) (712-04.01)EACH150$31.00$29.29$29.00
15Signs (construction) (712-06)SF2,100$8.00$6.92$6.85
16Signs (construction)(reduced speed warning) (712-06.16)EACH4$325.00$303.00$300.00
17Arrow board (type C) (712-08.03)EACH4$1,075.00$1,010.00$1,000.00
18Changeable message sign unit (713-16.01)EACH4$5,300.00$5,024.75$4,975.00
19Sign adjustments (713-20.30)EACH6$80.00$75.75$75.00
20Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH470$39.50$45.00$35.00
21Removal of snowplowable reflective marker (716-01.30)EACH470$12.50$10.00$15.00
22Plastic pavement marking(channelization striping) (716-02.04)SY1,300$5.25$35.00$35.00
23Plastic pavement marking (stop line) (716-02.05)LF275$21.00$25.00$18.00
24Plastic pavement marking (turn lane arrow) (716-02.06)EACH18$215.00$225.00$165.00
25Plastic word pavement marking (school) (716-03.04)EACH4$625.00$500.00$600.00
26Plastic pavement marking (yield line) (716-04.12)SF12$41.75$30.00$30.00
27Painted pavement marking (6" line) (716-05.20)LM46.18$1,500.00$1,200.00$1,100.00
28Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM23.09$7,500.00$7,100.00$6,400.00
29Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05)LF915$2.10$2.50$1.50
30Enhanced flat line thermo (12IN line) (716-12.09)LF1,300$5.25$4.00$3.00
31Mobilization (717-01)LS1$38,000$39,448$116,500
TDOT contract CN263033: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of March 20, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy