TDOT contract CNZ296 bid tabulation

The resurfacing on i-40 from near the jefferson street underpass (l.m. 16.44) to the bridge over u.s. 31 (s.r. 6, 8th avenue south) (l.m. 18.40). Let by Tennessee DOT on December 5, 2025, Davidson County. 4 bids received; low bid $5,429,594 by Vulcan Construction Materials, LLC.

Owner
Tennessee DOT
Letting
05 DEC 2025
Pay items
39
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Vulcan Construction Materials, LLC$5,429,594Low
2Rogers Group, Inc.$5,528,869+2.0%
3Volunteer Paving, LLC$5,637,162+4.0%
4Jones Bros. Contractors, LLC$7,230,383+33%
TDOT contract CNZ296: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Vulcan Construction Materials, LLC2. Rogers Group, Inc.3. Volunteer Paving, LLC4. Jones Bros. Contractors, LLC
1Brooming & degrassing shoulders (208-01.05)LM8$5,000.00$8,500.00$2,245.80$2,700.00
2Mineral aggregate, type A base, grading D (303-01)TON404$46.50$30.00$57.71$70.00
3Asphalt concrete mix (PG76-22) (BPMB-HM) grading B-M2 (307-03.08)TON19,711$101.00$107.75$110.58$145.00
4Bituminous material for tack coat (TC) (403-01)TON131$1,000.00$900.00$969.62$850.00
5Void reducing asphalt membrane (vram) full-width (411-01.50)LF89,760$2.30$2.68$2.63$2.70
6Acs mix(PG76-22) grading D (411-03.10)TON11,700$128.00$125.00$123.25$165.00
7Scoring shoulders (continuous) (16IN width) (411-12.01)LM5.60$1,450.00$1,060.00$1,019.70$1,450.00
8Cold planing bituminous pavement (415-01.01)TON28,510$26.00$21.45$21.83$40.00
9Gray iron castings (catchbasin) (611-03.04)LB2,000$8.75$6.75$5.15$6.00
10Traffic control (712-01)LS1$200,000$185,000$248,745$230,000
11Flexible drums (channelizing) (712-04.01)EACH310$55.00$32.00$30.90$30.00
12Warning lights (type C) (712-05.03)EACH52$5.00$16.00$15.45$15.00
13Signs (construction) (712-06)SF2,592$8.50$8.00$7.21$7.00
14Signs (construction)(reduced speed warning) (712-06.16)EACH6$650.00$350.00$334.75$325.00
15Temporary barricades (type III) (712-07.03)LF48$25.00$26.75$25.75$25.00
16Arrow board (type C) (712-08.03)EACH4$950.00$1,200.00$1,133.00$1,100.00
17Digital speed limit sign assembly (712-08.09)EACH6$3,000.00$4,300.00$4,120.00$4,000.00
18Queue protection truck (712-08.12)DAY120$1,250.00$1,350.00$1,184.50$1,150.00
19Changeable message sign unit (713-16.01)EACH4$3,500.00$5,500.00$5,253.00$5,100.00
20Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23)EACH1,130$38.00$40.00$45.00$36.00
21Removal of snowplowable reflective marker (716-01.30)EACH1,130$12.00$12.50$10.00$18.00
22Plastic pavement marking (stop line) (716-02.05)LF46$20.00$21.00$30.00$20.00
23Plastic pavement marking (turn lane arrow) (716-02.06)EACH9$200.00$210.50$225.00$165.00
24Plastic pavement marking (24" barrier line) (716-02.07)LF2,595$12.00$12.50$8.00$18.00
25Plastic pavement marking (6" dotted line) (716-02.11)LF6,028$2.00$2.10$2.00$1.50
26Plastic pavement marking (straight-turn arrow) (716-04.01)EACH5$250.00$265.00$400.00$300.00
27Plastic pavement marking (lane reduction arrow) (716-04.14)EACH2$650.00$685.00$550.00$600.00
28Painted pavement marking (8" barrier line) (716-05.02)LF9,825$0.70$0.75$0.75$1.00
29Painted pavement marking (6" line) (716-05.20)LM20.20$1,700.00$1,785.00$1,200.00$1,350.00
30Preformed plastic pavement marking (interstate shield) (716-10.50)EACH16$1,600.00$1,685.00$1,500.00$2,000.00
31Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM10.10$7,500.00$7,900.00$7,200.00$7,500.00
32Enhanced flatline thermo PVMT MRKNG (8IN barrier line) (716-12.03)LF9,825$1.50$1.60$2.50$2.00
33Enhanced flat line thermo (12IN line) (716-12.09)LF1,348$4.00$4.25$4.00$2.50
34Enhanced flat line thermo (12IN dotted) (716-12.10)LF3,596$4.00$4.25$4.00$2.50
35Mobilization (717-01)LS1$55,000$130,000$214,028$120,000
36Install pull box (type A) (730-03.20)EACH2$1,200.00$1,275.00$1,236.00$1,200.00
37Conduit 2" diameter (PVC schedule 40) (730-12.02)LF40$22.00$23.75$22.66$22.00
38Saw slot (730-14.02)LF750$5.00$5.40$5.15$5.00
39Loop wire (730-14.03)LF3,000$1.25$1.35$1.29$1.25
TDOT contract CNZ296: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of December 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy