TDOT contract CN263034 bid tabulation
The resurfacing on s.r. 109 from near old state highway 109 (l.m. 7.20) to academy road (l.m. 16.51). Let by Tennessee DOT on March 20, 2026, Sumner County. 2 bids received; low bid $6,304,033 by Volunteer Paving, LLC.
- Owner
- Tennessee DOT
- Letting
- 20 MAR 2026
- Pay items
- 45
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Volunteer Paving, LLC | $6,304,033 | Low |
| 2 | Rogers Group, Inc. | $6,435,699 | +2.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Volunteer Paving, LLC | 2. Rogers Group, Inc. |
|---|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 37 | $1,168.27 | $1,600.00 |
| 2 | Mineral aggregate, type A base, grading D (303-01) | TON | 4,928 | $33.23 | $35.00 |
| 3 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08) | TON | 6,224 | $125.28 | $110.00 |
| 4 | Bituminous material for tack coat (TC) (403-01) | TON | 200 | $950.79 | $900.00 |
| 5 | Acs mix(PG70-22) grading D (411-02.10) | TON | 30,709 | $117.46 | $120.50 |
| 6 | Scoring shoulders (non-continuous) (16IN width) (411-12.02) | LM | 15 | $570.65 | $475.00 |
| 7 | Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03) | LM | 18 | $570.65 | $475.00 |
| 8 | Cold planing bituminous pavement (415-01.01) | TON | 36,202 | $16.86 | $22.00 |
| 9 | Guardrail transition 27IN to 31IN (705-02.10) | EACH | 2 | $151.50 | $158.66 |
| 10 | Earth pad for type 38 GR end treatment (705-04.09) | EACH | 4 | $1,010.00 | $1,060.00 |
| 11 | GR terminaltrailing end (type 13) MASH TL-3 (705-06.10) | EACH | 1 | $1,767.50 | $1,450.00 |
| 12 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 4 | $4,949.00 | $3,500.00 |
| 13 | Guardrail removed (706-01) | LF | 275 | $1.01 | $1.10 |
| 14 | Traffic control (712-01) | LS | 1 | $168,569 | $148,000 |
| 15 | Flexible drums (channelizing) (712-04.01) | EACH | 100 | $0.51 | $32.00 |
| 16 | Warning lights (type C) (712-05.03) | EACH | 25 | $21.21 | $16.00 |
| 17 | Signs (construction) (712-06) | SF | 4,893 | $7.07 | $7.50 |
| 18 | Arrow board (type C) (712-08.03) | EACH | 2 | $1,313.00 | $1,200.00 |
| 19 | Flexible delineator (white) (713-02.14) | EACH | 60 | $22.22 | $55.00 |
| 20 | Sign post delineation enhancement (713-02.21) | LF | 216 | $5.05 | $5.50 |
| 21 | Remove and replace sign (R1-2, yield, 48"X48"X48") (713-16.50) | EACH | 1 | $353.50 | $135.00 |
| 22 | Remove and replace sign (R3-4, no U-turn, 36"X36") (713-16.51) | EACH | 4 | $277.75 | $135.00 |
| 23 | Remove and replace sign (R3-7, left turn must turn left, 36"X36") (713-16.52) | EACH | 1 | $277.75 | $135.00 |
| 24 | Remove and replace sign (R5-1, DO not enter, 36"X36") (713-16.53) | EACH | 6 | $277.75 | $135.00 |
| 25 | Remove and replace sign (R5-1A, wrong way, 42"X30") (713-16.54) | EACH | 2 | $303.00 | $135.00 |
| 26 | Remove and replace sign (R8-3A, no parking, 24"X30") (713-16.55) | EACH | 1 | $227.25 | $135.00 |
| 27 | Remove and replace sign (TN-6D, SR 109, 30"X24") (713-16.56) | EACH | 1 | $252.50 | $135.00 |
| 28 | Remove and replace sign (R1-1, stop, 36"X36") (713-16.57) | EACH | 2 | $277.75 | $135.00 |
| 29 | Sign adjustments (713-20.30) | EACH | 10 | $55.55 | $200.00 |
| 30 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 40 | $45.00 | $38.50 |
| 31 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 548 | $45.00 | $37.25 |
| 32 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 1,190 | $45.00 | $38.50 |
| 33 | Removal of snowplowable reflective marker (716-01.30) | EACH | 1,778 | $10.00 | $10.60 |
| 34 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 1,163 | $35.00 | $37.00 |
| 35 | Plastic pavement marking (stop line) (716-02.05) | LF | 430 | $25.00 | $19.00 |
| 36 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 58 | $225.00 | $175.00 |
| 37 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 3,319 | $4.00 | $2.15 |
| 38 | Plastic pavement marking (6" dotted line) (716-02.11) | LF | 251 | $3.00 | $1.25 |
| 39 | Plastic pavement marking (8IN line) (716-02.12) | LM | 0.50 | $15,000 | $8,000.00 |
| 40 | Plastic pavement marking (U turn arrow) (716-02.15) | EACH | 4 | $450.00 | $650.00 |
| 41 | Plastic pavement marking (straight arrow) (716-04.05) | EACH | 8 | $225.00 | $175.00 |
| 42 | Plastic pavement marking (yield line) (716-04.12) | SF | 30 | $30.00 | $32.00 |
| 43 | Painted pavement marking (6" line) (716-05.20) | LM | 43 | $1,200.00 | $1,200.00 |
| 44 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 43.10 | $7,100.00 | $6,750.00 |
| 45 | Mobilization (717-01) | LS | 1 | $104,355 | $100,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of March 20, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.