Wiregrass Construction Company, Inc submitted 51 bids on Tennessee DOT contracts in the data, from 08 DEC 2023 to 06 FEB 2026, and was the low bidder on 8 of them (16%). When it was not low, its total sat a median +23% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $33,717,231
- Latest bid
- 06 FEB 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2023 | 1 | 0 | 0% |
| 2024 | 19 | 1 | 5% |
| 2025 | 27 | 6 | 22% |
| 2026 | 4 | 1 | 25% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Rutherford County | 12 | 4 | 33% |
| Davidson County | 5 | 0 | 0% |
| Williamson County | 4 | 0 | 0% |
| Wilson County | 3 | 2 | 67% |
| Marion County | 2 | 0 | 0% |
| Marshall County | 2 | 0 | 0% |
| Perry County | 2 | 0 | 0% |
| Cannon County | 2 | 0 | 0% |
| Cumberland And White Counties | 1 | 0 | 0% |
| Macon And Sumner Counties | 1 | 0 | 0% |
| Counties Loudon, Monroe, And Roane | 1 | 0 | 0% |
| Hawkins County | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Signs (construction) | 712-06 | SF | 51 | 23 (45%) | $7.36 | $8.00 |
| Cold planing bituminous pavement | 415-01.01 | TON | 33 | 19 (58%) | $26.25 | $34.00 |
| Enhanced flatline thermo PVMT MRKNG (6IN dotted line) | 716-12.05 | LF | 21 | 16 (76%) | $2.00 | $2.10 |
| Emulsified asphalt for micro-surfacing | 414-03.01 | TON | 18 | 15 (83%) | $1,082.53 | $1,216.82 |
| Enhanced flatline thermo PVMT MRKNG (6IN line) | 716-12.02 | LM | 48 | 12 (25%) | $7,510.36 | $7,425.00 |
| Plastic pavement marking (stop line) | 716-02.05 | LF | 47 | 12 (26%) | $20.03 | $17.30 |
| Plastic pavement marking (turn lane arrow) | 716-02.06 | EACH | 38 | 12 (32%) | $200.30 | $200.68 |
| Snowplowable raised pavement markers (BI-dir) (1 color) | 716-01.21 | EACH | 37 | 11 (30%) | $38.95 | $40.48 |
| Bituminous material for tack coat (TC) | 403-01 | TON | 29 | 11 (38%) | $900.00 | $969.62 |
| Flexible drums (channelizing) | 712-04.01 | EACH | 32 | 10 (31%) | $30.55 | $34.50 |
| Changeable message sign unit | 713-16.01 | EACH | 30 | 10 (33%) | $5,407.14 | $6,095.00 |
| Loop wire | 730-14.03 | LF | 13 | 10 (77%) | $0.80 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Vulcan Construction Materials, LLC | 25 | 16 of 25 |
| Rogers Group, Inc. | 21 | 14 of 21 |
| Jones Bros. Contractors, LLC | 21 | 10 of 21 |
| Asphalt Paving Systems, Inc. | 20 | 18 of 20 |
| Hawkins Asphalt Paving, LLC | 15 | 10 of 15 |
| Volunteer Paving, LLC | 12 | 7 of 12 |
| Tinsley Asphalt, LLC | 6 | 5 of 6 |
| Eubank Asphalt Paving & Sealing, LLC | 4 | 4 of 4 |
| Civil Constructors, LLC | 4 | 4 of 4 |
| Sessions Paving Company | 2 | 2 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 06 FEB 2026 | CN262016 | Cannon County | The resurfacing (microsurface or thin mix overlay) on s.r. 64 from the coffee county line to south of u.s. 70s (s.r. 1) and on s.r. 99 from | 5 of 5 | $2,073,699 | +49% |
| 06 FEB 2026 | CN263019 | Rutherford County | The resurfacing on s.r. 102 from near brackin court (l.m. 11.62) to s.r. 266 (l.m. 13.04) | 4 of 4 | $1,126,745 | +5.0% |
| 06 FEB 2026 | CN263020 | Rutherford County | The resurfacing (microsurface or thin mix overlay) on s.r. 99 from west of mt. herman road (l.m. 24.50) to the cannon county line (l.m. 33.1 | 4 of 6 | $1,698,792 | +23% |
| 06 FEB 2026 | CN263021 | Wilson County | The resurfacing on s.r. 265 (central pike) from s.r. 109 (l.m. 10.47) to s.r. 266 (l.m. 20.20) | 1 of 3 | $2,575,169 | Low, 7.0% under the second |
| 05 DEC 2025 | CNZ297 | Giles County | The resurfacing (either microsurface or thin mix overlay) on u.s. 64 (s.r. 15) from west college street (l.m. 9.32) to near five points road | 1 of 5 | $3,718,268 | Low, 3.0% under the second |
| 05 DEC 2025 | CNZ301 | Lawrence County | The resurfacing (either microsurface or thin mix overlay) on u.s. 64 (s.r. 15) from near west gaines street (l.m. 12.64) to near eagle facto | 2 of 3 | $2,360,401 | +13% |
| 05 DEC 2025 | CNZ304 | Rutherford County | The resurfacing on i-24 from the davidson county line (l.m. 0.00) to the baker road underpass (l.m. 7.75), including bridge expansion joint | 1 of 3 | $9,924,138 | Low, 8.0% under the second |
| 05 DEC 2025 | CNZ316 | Williamson County | The resurfacing on i-840 from near u.s. 31 (s.r. 6) (l.m. 21.68) to east of arno road (l.m. 31.68), including bridge deck repairs | 4 of 5 | $11,840,923 | +24% |
| 05 DEC 2025 | CNZ315 | Williamson County | The resurfacing (either microsurface or thin mix overlay) on s.r. 96 from near cox road (l.m. 20.62) to the rutherford county line (l.m. 26. | 4 of 6 | $1,812,469 | +21% |
| 05 DEC 2025 | CNZ317 | Wilson County | The resurfacing on i-840 from the rutherford county line (l.m. 0.00) to near stewarts ferry pike (l.m. 4.80) | 1 of 3 | $5,682,854 | Low, 3.0% under the second |
| 03 OCT 2025 | CNZ263 | Williamson County | The resurfacing on s.r. 252 (wilson pike) from s.r. 96 (l.m. 0.00) to north of clovercroft road (l.m. 5.71) | 3 of 7 | $1,398,277 | +14% |
| 27 JUN 2025 | CNZ166 | Trousdale County | The resurfacing on s.r. 25 from s.r. 10 (l.m. 0.53) to the smith county line (l.m. 3.63) | 2 of 3 | $1,091,360 | +2.0% |
| 27 JUN 2025 | CNZ177 | Van Buren County | The microsurfacing on s.r. 111 from near sparta street (l.m. 14.87) to the white county line (l.m. 19.54), including thin epoxy overlay on t | 2 of 2 | $1,639,415 | +16% |
| 09 MAY 2025 | CNZ147 | Bedford County | The construction of turn lanes on u.s. 231 (s.r. 10) at the intersection of s.r. 82 (sawney webb memorial highway) (l.m. 17.52), including s | 6 of 6 | $2,581,088 | +38% |
| 09 MAY 2025 | CNZ158 | Davidson County | The resurfacing on s.r. 254 (old hickory boulevard) from cloverland drive (l.m. 8.24) to blue hole road (l.m. 13.97) | 3 of 4 | $7,432,600 | +18% |
| 09 MAY 2025 | CNZ136 | Dekalb County | The resurfacing on u.s. 70 (s.r. 26) from near east main street (l.m. 10.88) to trapp lane (l.m. 13.25) | 4 of 4 | $2,322,592 | +67% |
| 09 MAY 2025 | CNZ161 | Smith County | The resurfacing on s.r. 141 from the wilson county line (l.m. 0.00) to east of the nerr crossing (l.m. 7.00) | 3 of 3 | $2,092,184 | +6.0% |
| 21 MAR 2025 | CNZ098 | Davidson County | The resurfacing on i-24 from haywood lane (l.m. 21.10) to the rutherford county line (l.m. 27.62), including bridge expansion joint repairs | 4 of 4 | $9,227,763 | +30% |
| 21 MAR 2025 | CNZ091 | Marshall County | The microsurfacing on s.r. 373 from near i-65 (l.m. 3.40) to s.r. 417 (l.m. 7.09) | 2 of 2 | $1,573,957 | +18% |
| 21 MAR 2025 | CNZ101 | Rutherford County | The grading, drainage, signals, and paving on u.s. 41 (s.r. 1) from near jefferson pike (l.m. 3.38) to near s.r. 266 (sam ridley parkway) (l | 5 of 5 | $6,775,300 | +11% |
| 21 MAR 2025 | CNZ087 | Wilson County | The resurfacing on i-40 from the davidson county line (l.m. 0.00) to west of golden bear parkway (l.m. 4.87) | 3 of 3 | $6,234,303 | +18% |
| 07 FEB 2025 | CNZ021 | Bradley County | The microsurfacing on s.r. 306 from s.r. 60 (l.m. 0.00) to s.r. 308 (l.m. 5.55) | 2 of 2 | $1,206,074 | +37% |
| 07 FEB 2025 | CNZ022 | Bradley And Hamilton Counties | F3-007,06s002-f8-007 microsurfacing on u.s. 11 (u.s. 64, s.r. 2) in bradley county from the hamilton county line to near boss road, plus in | 2 of 2 | $1,994,887 | +23% |
| 07 FEB 2025 | CNZ066 | Cannon County | The resurfacing on s.r. 281 from s.r. 53 (l.m. 0.00) to west of todd road (l.m. 4.51) | 3 of 5 | $1,144,479 | +6.0% |
| 07 FEB 2025 | CNZ032 | Franklin And Marion Counties | F8-003,stp-156(25),58s156-f8-006 the microsurfacing on s.r. 156 from u.s. 64 (s.r. 15) (l.m. 0.00) in franklin county to near thunder ridge | 2 of 2 | $1,730,529 | +39% |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.