TDOT contract CNZ032 bid tabulation
F8-003,stp-156(25),58s156-f8-006 the microsurfacing on s.r. 156 from u.s. 64 (s.r. 15) (l.m. 0.00) in franklin county to near thunder ridge road (l.m. 3.05) in marion county, crossing over county lines. Let by Tennessee DOT on February 7, 2025, Franklin And Marion Counties. 2 bids received; low bid $1,242,235 by Asphalt Paving Systems, Inc..
- Owner
- Tennessee DOT
- Letting
- 07 FEB 2025
- Pay items
- 22
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Asphalt Paving Systems, Inc. | $1,242,235 | Low |
| 2 | Wiregrass Construction Company, Inc | $1,730,529 | +39% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Asphalt Paving Systems, Inc. | 2. Wiregrass Construction Company, Inc |
|---|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 25.60 | $1,000.00 | $2,826.51 |
| 2 | Bituminous material for tack coat (micro-surfacing) (403-01.01) | TON | 25 | $1,024.23 | $1,751.11 |
| 3 | High performance fog seals (403-01.10) | SY | 24,114 | $2.53 | $1.34 |
| 4 | Emulsified asphalt for micro-surfacing (414-03.01) | TON | 227 | $1,409.06 | $1,187.19 |
| 5 | Aggregate for micro surfacing (414-03.02) | TON | 1,880 | $109.86 | $219.62 |
| 6 | Guardrail delineation enhancement (BI-directional) (705-04.22) | EACH | 211 | $5.11 | $6.99 |
| 7 | Traffic control (712-01) | LS | 1 | $33,790 | $54,353 |
| 8 | Flexible drums (channelizing) (712-04.01) | EACH | 20 | $1.05 | $1.44 |
| 9 | Signs (construction) (712-06) | SF | 353 | $8.47 | $11.61 |
| 10 | Changeable message sign unit (713-16.01) | EACH | 3 | $7,157.89 | $9,803.81 |
| 11 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 845 | $42.11 | $57.67 |
| 12 | Removal of snowplowable reflective marker (716-01.30) | EACH | 845 | $10.53 | $84.70 |
| 13 | Plastic pavement marking (stop line) (716-02.05) | LF | 232 | $15.79 | $17.30 |
| 14 | Plastic pavement marking (longitudinal cross-walk) (716-02.09) | LF | 27 | $26.32 | $36.04 |
| 15 | Plastic word pavement marking (stop ahead) (716-03.03) | EACH | 1 | $684.21 | $360.43 |
| 16 | Plastic pavement marking (bike/xing) (716-04.18) | EACH | 2 | $631.58 | $648.78 |
| 17 | Painted pavement marking (4" line) (716-05.01) | LM | 9.40 | $1,047.37 | $2,162.61 |
| 18 | Removal of word pavement marking (bike/xing) (716-08.11) | EACH | 2 | $315.79 | $720.87 |
| 19 | Removal of pavement marking (line) (716-08.20) | LM | 19.30 | $2,947.37 | $4,685.64 |
| 20 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 44.80 | $7,126.32 | $9,371.29 |
| 21 | Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05) | LF | 417 | $2.11 | $3.24 |
| 22 | Mobilization (717-01) | LS | 1 | $105,972 | $150,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of February 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.