TDOT contract CNZ101 bid tabulation

The grading, drainage, signals, and paving on u.s. 41 (s.r. 1) from near jefferson pike (l.m. 3.38) to near s.r. 266 (sam ridley parkway) (l.m. 4.10) in smyrna. Let by Tennessee DOT on March 21, 2025, Rutherford County. 5 bids received; low bid $6,095,040 by Capital City Construction Services, LLC.

Owner
Tennessee DOT
Letting
21 MAR 2025
Pay items
136
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Capital City Construction Services, LLC$6,095,040Low
2Cleary Construction, Inc.$6,325,075+4.0%
3Civil Constructors, LLC$6,509,521+7.0%
4Vulcan Construction Materials, LLC$6,747,921+11%
5Wiregrass Construction Company, Inc$6,775,300+11%
TDOT contract CNZ101: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Capital City Construction Services, LLC2. Cleary Construction, Inc.3. Civil Constructors, LLC4. Vulcan Construction Materials, LLC5. Wiregrass Construction Company, Inc
1Construction stakes, lines and grades (105-01)LS1$50,000$125,000$35,330$135,000$35,047
2Trainee (109-10.01)HR1,180$0.80$0.80$0.80$0.80$0.80
3Clearing and grubbing (201-01)LS1$8,148.57$108,000$8,880.00$48,200$7,510.14
4Removal of structures and obstructions (202-01.50)EACH2$16,297$11,250$5,010.00$4,300.00$10,014
5Removal of asphalt pavement (202-03.01)SY5,862$13.42$17.15$8.70$18.90$4.53
6Road & drainage excavation (unclassified) (203-01)CY15,761$43.66$24.65$42.00$54.10$38.81
7Placing and spreading topsoil (203-04)CY2,063$38.12$27.00$25.20$22.80$30.29
8Water (203-06)MG153$28.57$50.00$23.90$5.00$19.06
9Sediment removal (209-05)CY1,430$23.91$32.00$27.90$5.00$20.78
10Temporary silt fence (with backing) (209-08.02)LF752$6.21$6.60$6.90$6.05$3.05
11Temporary silt fence (without backing) (209-08.03)LF14,600$2.63$2.80$2.90$2.55$1.22
12Rock check dam (209-08.07)EACH7$926.32$1,000.00$1,030.00$900.00$265.36
13Enhanced rock check dam (209-08.08)EACH11$926.32$1,000.00$1,030.00$900.00$315.43
14Sandbags (209-09.01)BAG500$7.14$5.60$11.40$7.15$3.15
15Catch basin filter assembly(type 1) (209-40.41)EACH2$768.42$820.00$851.00$747.00$225.81
16Catch basin filter assembly(type 4) (209-40.44)EACH2$1,031.58$1,100.00$1,140.00$1,000.00$285.39
17Temporary diversion channel (209-65.03)LF450$24.97$21.00$8.90$19.70$50.07
18Mineral aggregate, type A base, grading D (303-01)TON10,350$42.59$31.00$40.00$33.70$49.92
19Mineral aggregate (size 57) (303-10.01)TON30$47.82$50.00$90.50$57.60$660.23
20Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON220$266.32$287.00$204.00$175.00$200.00
21Asp. conc. mix(PG70-22) (BPMB-HM) GR. A-S (307-01.21)TON212$313.68$338.00$204.00$175.00$205.00
22Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01)TON360$252.63$270.00$204.00$175.00$162.00
23Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08)TON652$205.26$221.00$204.00$175.00$168.00
24Asphalt concrete mix (PG82-22) (BPMB-HM) grading A (307-04.01)TON401$273.68$295.00$204.00$175.00$215.00
25Treated permeable base (313-03)SY5,047$40.16$43.00$35.00$30.00$34.00
26Bituminous material for prime coat (PC) (402-01)TON9$1,578.95$1,700.00$1,170.00$1,000.00$1,000.00
27Aggregate for cover material (PC) (402-02)TON35$157.89$170.00$35.00$30.00$170.00
28Bituminous material for tack coat (TC) (403-01)TON18$1,263.16$1,350.00$1,170.00$1,000.00$970.00
29Saw cutting asphalt pavement (407-20.05)LF2,464$11.56$6.75$7.90$7.15$10.01
30Acs mix (PG64-22) grading E shoulder (411-01.07)TON296$200.00$215.00$204.00$175.00$260.00
31Acs mix(PG64-22) grading D (411-01.10)TON128$331.58$357.00$204.00$175.00$290.00
32Acs mix(PG70-22) grading D (411-02.10)TON2,215$144.21$155.00$204.00$175.00$195.00
33Cold planing bituminous pavement (415-01.01)TON2,109$25.79$27.80$52.50$45.00$32.00
34Portland cement concrete pavement (plain) 9" (501-01.02)SY4,588$142.94$145.00$170.00$173.00$197.27
35Class A concrete (island - 6") (604-09.10)CY34$964.28$795.00$699.00$614.00$600.81
3618" concrete pipe culvert (class III) (607-03.02)LF139$151.72$150.00$216.00$238.00$222.22
3730" concrete pipe culvert (class III) (607-06.02)LF11$319.96$361.00$1,120.00$530.00$289.62
38Reinforced concrete pipe arch (36" X 23") (607-57.03)LF78$258.14$361.00$228.00$300.00$194.26
3918IN endwall (cross drain) 6:1 (611-07.56)EACH3$6,040.89$4,300.00$6,240.00$2,300.00$7,905.81
4030IN endwall (cross drain) 6:1 (611-07.62)EACH1$11,283$8,500.00$13,040$5,870.00$13,009
4136IN endwall (cross drain) 6:1 (611-07.65)EACH2$14,145$10,000$14,450$7,600.00$14,354
42Catch basins, type 31, > 4' - 8' depth (611-31.02)EACH2$26,110$19,900$20,130$19,400$15,452
43Catch basins, type 42, 0' - 4' depth (611-42.01)EACH1$26,110$6,100.00$7,020.00$5,730.00$5,559.24
44Concrete curb (702-01)CY12$866.31$1,070.00$874.00$823.00$1,001.35
45Metal beam guard fence (705-01.04)LF40$125.34$124.00$139.00$133.00$150.20
46Portable barrier rail delineator (705-04.50)EACH257$10.53$17.00$17.50$13.20$14.52
47GR terminaltrailing end (type 13) MASH TL-3 (705-06.10)EACH1$1,827.37$2,000.00$2,020.00$1,840.00$1,802.43
48Tangent energy absorbing term MASH TL-3 (705-06.20)EACH1$5,110.53$4,000.00$5,660.00$4,090.00$3,504.73
49Self restoring crash cushn wide (MASH TL-3) (705-20.72)EACH4$47,368$58,150$52,440$46,000$51,330
50Machined rip-rap (class A-3) (709-05.05)TON550$88.76$60.00$67.50$47.90$77.48
51Machined rip-rap (class A-1) (709-05.06)TON191$105.38$60.00$70.50$47.90$83.03
52Machined rip-rap (class B) (709-05.08)TON7$199.47$60.00$126.00$100.00$245.76
53Aggregate underdrains (with pipe) (710-02)LF3,665$11.68$12.60$12.90$11.40$60.31
54Lateral underdrain (710-05)LF860$11.16$12.00$12.40$10.80$103.49
55Lateral underdrain endwall (4:1) (710-06.13)EACH4$1,052.63$1,375.00$1,280.00$1,240.00$2,995.55
56Lateral underdrain endwall (6:1) (710-06.15)EACH22$1,052.63$1,550.00$1,280.00$1,400.00$851.47
5751IN single slope concrete barrier wall (711-05.71)LF628$251.85$230.00$251.00$232.00$205.28
58Traffic control (712-01)LS1$157,737$225,000$80,580$212,000$197,567
59Interconnected portable barrier rail (712-02.02)LF5,140$51.87$52.30$96.50$110.00$38.46
60Temporary work zone crash cushion (MASH TL-3) (712-02.60)EACH13$9,165.26$17,400$8,740.00$31,100$8,761.82
61Flexible drums (channelizing) (712-04.01)EACH339$32.63$34.85$36.00$50.00$37.55
62Barrier rail delineator (712-04.50)EACH257$10.53$11.25$11.70$15.00$14.02
63Signs (construction) (712-06)SF1,142$7.89$8.50$8.70$10.50$7.66
64Temporary barricades (type III) (712-07.03)LF19$31.58$34.00$35.00$25.00$21.03
65Arrow board (type C) (712-08.03)EACH2$1,157.89$1,230.00$1,280.00$1,250.00$2,202.98
66Removable pavement marking (8" barrier line) (712-09.02)LF5,583$4.21$5.00$5.80$5.10$5.01
67Removable pavement marking (6" line) (712-09.08)LF5,560$3.68$3.00$4.65$4.10$4.01
68Class A concrete (foundation for sign supports) (713-01.01)CY7$593.68$340.00$787.00$675.00$300.41
69Steel bar reinforcement(foundation for sign supports) (713-01.02)LB1,320$3.88$1.15$4.10$3.50$1.00
70Square tube sign support (713-11.05)LB2,590$8.23$7.40$6.40$5.50$6.51
71P post slip base (713-11.21)EACH53$525.26$400.00$524.00$450.00$350.47
72Flat sheet aluminum signs (0.100" thick) (713-13.03)SF494$13.93$27.00$20.10$17.25$24.03
73Removal of signs, posts and footings (713-15)LS1$2,256.84$2,250.00$2,040.00$1,750.00$2,002.70
74Removal & relocation of sign & support (713-15.02)EACH1$1,870.53$900.00$1,280.00$1,100.00$801.08
75Suspended flat sheet aluminum sign (0.080" thick) (713-15.07)EACH9$631.58$675.00$1,110.00$575.00$120.16
76Changeable message sign unit (713-16.01)EACH2$6,263.16$6,700.00$6,930.00$6,000.00$8,461.42
77Pull boxes (type C) (714-05.04)EACH9$1,157.89$1,260.00$1,340.00$1,180.00$1,151.55
78Cable (2/C #6 AWG) (714-06.08)LF1,200$3.68$4.00$5.00$4.40$4.31
79Luminaires (250 watt) (714-09.03)EACH5$1,768.42$1,925.00$1,950.00$1,710.00$1,677.26
80Raised PVMT markers (BI-directional) (2 color lens) (716-01.13)EACH75$42.11$5.90$23.30$20.50$20.03
81Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH4$52.63$41.00$58.50$51.10$50.07
82Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH150$52.63$40.00$58.50$51.10$50.07
83Removal of snowplowable reflective marker (716-01.30)EACH150$10.53$21.00$17.50$15.30$15.02
84Plastic pavement marking(channelization striping) (716-02.04)SY425$36.84$41.00$41.00$35.80$35.05
85Plastic pavement marking (stop line) (716-02.05)LF290$21.05$23.50$23.30$20.50$20.03
86Plastic pavement marking (turn lane arrow) (716-02.06)EACH13$236.84$235.00$233.00$205.00$200.27
87Plastic pavement marking (24" barrier line) (716-02.07)LF79$21.05$21.00$16.30$14.30$14.02
88Plastic pavement marking (8" dotted line) (716-02.08)LF510$3.16$3.00$4.65$4.10$4.01
89Plastic pavement marking (6" dotted line) (716-02.11)LF465$3.16$1.75$3.50$3.05$3.00
90Plastic pavement marking (8IN line) (716-02.12)LM1$10,526$9,400.00$17,480$15,300$15,020
91Plastic word pavement marking (only) (716-03.01)EACH4$394.74$470.00$524.00$460.00$450.61
92Plastic pavement marking (wrong way arrow) (716-04.06)EACH2$315.79$120.00$466.00$409.00$400.54
93Plastic pavement marking (exit only arrow) (716-04.07)EACH1$473.68$410.00$466.00$409.00$400.54
94Plastic pavement marking (yield line) (716-04.12)SF45$31.58$53.00$41.00$35.80$35.05
95Plastic pavement marking (lane reduction arrow) (716-04.14)EACH2$578.95$705.00$757.00$665.00$650.88
96Painted pavement markings(8" line) (716-05.50)LF160$0.79$4.50$2.35$2.05$2.00
97Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM4$10,526$8,800.00$9,320.00$8,180.00$8,010.81
98Mobilization (717-01)LS1$149,530$315,000$258,610$175,000$650,000
99Signal head assembly (130 A3 with backplate) (730-02.03)EACH4$1,326.32$1,445.00$1,700.00$1,490.00$1,461.97
100Signal head assembly (130 with backplate) (730-02.09)EACH13$1,326.32$1,445.00$1,640.00$1,440.00$1,411.91
101Signal head assembly (130 A2 with backplate) (730-02.11)EACH3$1,326.32$1,445.00$1,700.00$1,490.00$1,461.97
102Signal head assembly (150 A2H with backplate) (730-02.17)EACH1$2,273.68$2,475.00$2,630.00$2,310.00$2,258.05
103Install pull box (type B) (730-03.21)EACH9$1,157.89$1,260.00$1,400.00$1,230.00$1,206.63
104Install pull box (fiber optic-type B) (730-03.24)EACH3$3,010.53$3,275.00$5,150.00$4,520.00$4,425.97
105Fiber optic splice fusion (730-03.33)EACH12$526.32$575.00$146.00$128.00$125.17
106Fiber splice enclosure (N lowery ST (SR 1) (730-03.36)EACH3$2,378.95$2,590.00$1,450.00$1,270.00$1,241.68
107Network switch (type A) (730-03.40)EACH3$10,789$11,740$11,220$9,850.00$9,643.01
108Fiber optic drop cable (12F) (730-03.54)LF150$2.37$2.60$3.60$3.15$3.10
109Fiber optic drop panel (N lowery ST (SR 1) (730-03.57)EACH3$1,578.95$1,720.00$2,180.00$1,910.00$1,872.53
110Electrical service connection (730-05.01)EACH3$9,473.68$10,300$9,490.00$8,330.00$8,151.00
111Signal cable - 5 conductor (730-08.02)LF800$2.37$2.60$2.70$2.35$2.30
112Signal cable - 7 conductor (730-08.03)LF3,400$2.63$2.85$2.80$2.45$2.40
113Conduit 2" diameter (PVC schedule 40) (730-12.02)LF300$29.47$32.00$46.50$40.90$40.05
114Conduit 3" diameter (PVC schedule 40) (730-12.03)LF300$31.58$34.30$50.00$44.00$43.06
115Conduit 2" diameter (directional bore) (730-12.23)LF640$86.32$94.00$99.00$86.90$85.11
116Conduit 3" diameter (directional bore) (730-12.24)LF640$89.47$97.00$104.00$91.00$89.12
117Vehicle detector (radar - stopline) (730-13.08)EACH9$15,000$16,320$11,940$10,500$10,264
118Vehicle detector (radar - advance) (730-13.09)EACH6$12,895$14,030$13,050$11,500$11,215
119Cabinet (atc) (730-15.07)EACH3$7,368.42$8,015.00$29,020$25,500$24,934
120Controller (econolite cobalt C) (730-16.14)EACH3$25,537$27,800$6,980.00$6,130.00$5,998.09
121Cantilever signal support (2 @ 55' & 60') (730-25.09)EACH2$54,905$59,730$64,620$56,700$55,525
122Cantilever signal support (2 @ 55' & 65') (730-25.10)EACH1$62,779$68,300$72,190$63,400$62,034
123Cantilever signal support (1 arm @ 65') (730-25.13)EACH1$42,779$46,540$50,980$44,700$43,809
124Cantilever signal support (1 arm @ 70') (730-25.14)EACH2$43,432$47,250$51,920$45,600$44,610
125Battery back-UP system (730-35.06)EACH3$10,789$11,740$11,290$9,910.00$9,698.09
126Geotextile (type III)(erosion control) (740-10.03)SY1,347$3.43$5.00$3.75$3.35$1.70
127Temporary sediment tube 18IN (740-11.03)LF1,278$4.53$4.90$5.00$4.40$5.27
128Seeding (with mulch) (801-01)UNIT57$64.21$56.00$71.00$51.10$69.09
129Crown vetch mixture (with mulch) (801-01.02)UNIT2$168.42$170.00$186.00$153.00$173.59
130Seeding (without mulch) (801-02)UNIT2$126.32$113.50$140.00$102.00$35.05
131Water (seeding & sodding) (801-03)MG78$168.42$57.00$186.00$51.10$98.13
132Sodding (new sod) (803-01)SY6,394$6.32$6.00$7.00$5.35$5.96
133Turf reinforcement mat (class I) (805-01.01)SY1,416$4.79$5.15$5.30$4.60$4.66
1348IN dip slip joint water line (795-01.06)LF57$197.09$330.00$461.00$340.00$125.00
135Connect to 8IN water line (795-06.05)EACH2$5,617.14$5,520.00$7,300.00$3,170.00$3,800.00
136DI fittings (795-13.01)LB480$23.40$14.00$8.30$28.70$15.00
TDOT contract CNZ101: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of March 21, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy