Cleary Construction, Inc.: TDOT bid record
Cleary Construction, Inc. submitted 26 bids on Tennessee DOT contracts in the data, from 08 NOV 2019 to 14 AUG 2026, and was the low bidder on 5 of them (19%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $24,350,612
- Latest bid
- 14 AUG 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2019 | 1 | 1 | 100% |
| 2023 | 2 | 1 | 50% |
| 2024 | 10 | 2 | 20% |
| 2025 | 9 | 1 | 11% |
| 2026 | 4 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Rutherford County | 3 | 0 | 0% |
| Sumner County | 3 | 0 | 0% |
| Cocke County | 1 | 1 | 100% |
| Montgomery County | 1 | 1 | 100% |
| Campbell County | 1 | 0 | 0% |
| Robertson County | 1 | 0 | 0% |
| Putnam And Smith Counties | 1 | 0 | 0% |
| Hamblen County | 1 | 0 | 0% |
| Benton And Decatur Counties | 1 | 0 | 0% |
| Williamson County | 1 | 0 | 0% |
| Wilson County | 1 | 0 | 0% |
| Roane County | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trainee | 109-10.01 | HR | 12 | 12 (100%) | $0.80 | $0.80 |
| Mineral aggregate (size 57) | 303-10.01 | TON | 24 | 9 (38%) | $55.50 | $65.00 |
| Mineral aggregate, type A base, grading D | 303-01 | TON | 24 | 7 (29%) | $38.75 | $45.00 |
| 18" concrete pipe culvert (class III) | 607-03.02 | LF | 16 | 7 (44%) | $116.50 | $120.00 |
| Road & drainage excavation (unclassified) | 203-01 | CY | 24 | 6 (25%) | $22.68 | $35.00 |
| Enhanced rock check dam | 209-08.08 | EACH | 21 | 6 (29%) | $1,000.00 | $1,000.00 |
| Geotextile (type IV)(stabilization) | 740-10.04 | SY | 16 | 6 (38%) | $4.00 | $5.00 |
| Class A concrete (pipe endwalls) | 611-07.01 | CY | 11 | 6 (55%) | $2,000.00 | $2,291.67 |
| Catch basins, type 12, > 4' - 8' depth | 611-12.02 | EACH | 10 | 6 (60%) | $6,397.83 | $6,743.24 |
| Geotextile (type III)(erosion control) | 740-10.03 | SY | 24 | 5 (21%) | $3.80 | $4.84 |
| Machined rip-rap (class A-3) | 709-05.05 | TON | 24 | 5 (21%) | $62.50 | $67.50 |
| Machined rip-rap (class A-1) | 709-05.06 | TON | 21 | 5 (24%) | $60.00 | $70.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Jones Bros. Contractors, LLC | 10 | 6 of 10 |
| Rogers Group, Inc. | 10 | 4 of 10 |
| Charles Blalock & Sons, Inc. | 8 | 4 of 8 |
| Civil Constructors, LLC | 8 | 4 of 8 |
| MasTec Civil, LLC | 6 | 0 of 6 |
| Summers-Taylor, Inc. | 5 | 3 of 5 |
| Bell & Associates Construction, LLC | 4 | 1 of 4 |
| Mack Construction, LLC | 4 | 2 of 4 |
| Vulcan Construction Materials, LLC | 3 | 1 of 3 |
| Whaley Construction, LLC | 3 | 1 of 3 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 14 AUG 2026 | CN262058 | Cumberland County | The grading, drainage, construction of concrete bulb-tee bridges, and paving on u.s. 127 (s.r. 28) from near potato farm road to near lowe r | 3 of 6 | $76,566,329 | +9.0% |
| 14 AUG 2026 | CN261061 | Knox County | The intersection improvements on s.r. 131 (emory road) at harrell road/carpenter road (l.m. 9.5), including grading, drainage, signals, and | 2 of 4 | $9,179,203 | +16% |
| 26 JUN 2026 | CN261044 | Monroe County | The grading, drainage, signals and paving on s.r. 322 from sheppard road (l.m. 13.34) to s.r. 72 (l.m. 15.53) | 3 of 6 | $24,634,446 | +17% |
| 26 JUN 2026 | CN263057 | Rutherford County | The widening on s.r. 268 from u.s. 41 (u.s. 70s, s.r. 1, nw broad street) (l.m. 0.00) to u.s. 231 (s.r. 10, memorial boulevard) (l.m. 4.39), | 2 of 4 | $126,995,936 | +3.0% |
| 03 OCT 2025 | CNZ902 | White County | The construction of a small drainage structure on s.r. 111 at l.m. 15.76 | 3 of 5 | $3,181,651 | +32% |
| 03 OCT 2025 | CNZ250 | Jackson County | The construction of a precast concrete box bridge on s.r. 53 near l.m. 17.56 | 1 of 7 | $2,745,400 | Low, 6.0% under the second |
| 03 OCT 2025 | CNZ111 | Putnam County | The grading, drainage, construction of a concrete box beam bridge, and paving on a s.i.a. route serving project sim (portobello america, inc | 3 of 7 | $4,740,588 | +19% |
| 15 AUG 2025 | CNZ221 | Sumner County | The grading, drainage, bridges, signals, and paving on s.r. 109 (portland bypass) from s.r. 52 west of portland to existing s.r. 109 north o | 3 of 6 | $92,911,605 | +4.0% |
| 25 JUL 2025 | CNZ233 | Smith County | The emergency slope stabilization on s.r. 141 from near l.m. 14.68 to l.m. 14.77 | 2 of 3 | $3,326,633 | +14% |
| 27 JUN 2025 | CNZ178 | Roane County | The construction of a concrete bulb-tee beam bridge on u.s. 27 (s.r. 29) over u.s. 27 (s.r. 29)/s.r. 61 (l.m. 12.10), including grading, dra | 6 of 7 | $5,943,298 | +33% |
| 09 MAY 2025 | CNZ164 | Williamson County | The construction of pedestrian facilities on s.r. 100 from the fairview community center (l.m. 3.08) to bowie lake road (l.m. 5.19), includi | 4 of 4 | $9,940,621 | +42% |
| 09 MAY 2025 | CNZ153 | Wilson County | The grading, drainage, signals, and paving on u.s. 70 (s.r. 24) from terrace hill road (l.m. 5.90) to adeles garden road (l.m. 6.49) | 3 of 5 | $2,165,942 | +32% |
| 21 MAR 2025 | CNZ101 | Rutherford County | The grading, drainage, signals, and paving on u.s. 41 (s.r. 1) from near jefferson pike (l.m. 3.38) to near s.r. 266 (sam ridley parkway) (l | 2 of 5 | $6,325,075 | +4.0% |
| 06 DEC 2024 | CNY270 | Benton And Decatur Counties | The grading, drainage, and paving on i-40 at the u.s. 641 (s.r. 69) interchange (l.m. 5.62) (exit 126), including lighting and signals | 2 of 3 | $13,984,926 | +26% |
| 06 DEC 2024 | CNY292 | Sumner County | The grading, drainage, signals, and paving on a s.i.a. route serving project woolhawk (facebook data center), including u.s. 31e (s.r. 6) an | 6 of 6 | $3,823,631 | +38% |
| 18 OCT 2024 | CNY205 | Hamblen County | The grading, drainage, construction of a concrete box bridge, signals, and paving on u.s. 11e (s.r. 34) from u.s. 25e (s.r. 32) (l.m. 11.14) | 3 of 4 | $68,967,941 | +8.0% |
| 04 OCT 2024 | CNY234 | Rutherford County | The grading, drainage, construction of concrete box bridges, signals, and paving on s.r. 99 (new salem highway) from west of veterans parkwa | 2 of 5 | $54,107,565 | +2.0% |
| 04 OCT 2024 | CNY161 | Sumner County | The grading, drainage, construction of a concrete box bridge, paving, and signals on walton ferry road/old shackle island road from nokes dr | 2 of 4 | $21,285,836 | +3.0% |
| 16 AUG 2024 | CNY184 | Putnam And Smith Counties | The construction of a concrete box beam bridge on webster road over little indian creek (l.m. 0.86), including grading, drainage, and paving | 4 of 4 | $2,581,290 | +53% |
| 21 JUN 2024 | CNY172 | Campbell County | The improvement of the intersection on s.r. 63 at s.r. 297, and construction of a truck climbing lane from west of old s.r. 63 to west of st | 3 of 4 | $12,157,177 | +38% |
| 21 JUN 2024 | CNY171 | Robertson County | The i-65 weigh station improvements near the kentucky state line (l.m. 15.10 - l.m. 16.01) | 2 of 3 | $30,856,745 | +4.0% |
| 09 FEB 2024 | CNY069 | Cocke County | The slide mitigation on u.s. 25e (s.r. 32) near l.m. 28.27, including grading, drainage, retaining wall, and paving | 1 of 4 | $7,326,567 | Low, 9.0% under the second |
| 09 FEB 2024 | CNY032 | Montgomery County | The construction of a concrete box culvert on u.s. 41a bypass (s.r. 12) near s.r. 13/s.r. 48 (l.m. 12.85), including grading, drainage, and | 1 of 2 | $8,684,912 | Low, 3.0% under the second |
| 08 DEC 2023 | CNX350 | Hamblen | The grading, drainage, signals and paving on u.s. 25e (s.r. 32) at the intersection of progress parkway/thoroughbred run road in morristown | 1 of 5 | $4,994,580 | Low, 10% under the second |
| 08 DEC 2023 | CNX406 | Jackson | The rockfall mitigation on s.r. 135 north of daniel hill lane (l.m. 7.1) | 2 of 4 | $3,058,772 | +12% |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.