Cleary Construction, Inc.: TDOT bid record

Cleary Construction, Inc. submitted 26 bids on Tennessee DOT contracts in the data, from 08 NOV 2019 to 14 AUG 2026, and was the low bidder on 5 of them (19%). When it was not low, its total sat a median +16% above the low bid.

Owner
Tennessee DOT
Low bid volume
$24,350,612
Latest bid
14 AUG 2026
Data through
02 OCT 2026
26Bids
5Low bids
19Win rate, percent
+16%Median gap to the low bid when not low, 21 bids

By year

YearBidsLow bidsWin rate
201911100%
20232150%
202410220%
20259111%
2026400%
Cleary Construction, Inc., TDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Rutherford County300%
Sumner County300%
Cocke County11100%
Montgomery County11100%
Campbell County100%
Robertson County100%
Putnam And Smith Counties100%
Hamblen County100%
Benton And Decatur Counties100%
Williamson County100%
Wilson County100%
Roane County100%
Cleary Construction, Inc., TDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainee109-10.01HR1212 (100%)$0.80$0.80
Mineral aggregate (size 57)303-10.01TON249 (38%)$55.50$65.00
Mineral aggregate, type A base, grading D303-01TON247 (29%)$38.75$45.00
18" concrete pipe culvert (class III)607-03.02LF167 (44%)$116.50$120.00
Road & drainage excavation (unclassified)203-01CY246 (25%)$22.68$35.00
Enhanced rock check dam209-08.08EACH216 (29%)$1,000.00$1,000.00
Geotextile (type IV)(stabilization)740-10.04SY166 (38%)$4.00$5.00
Class A concrete (pipe endwalls)611-07.01CY116 (55%)$2,000.00$2,291.67
Catch basins, type 12, > 4' - 8' depth611-12.02EACH106 (60%)$6,397.83$6,743.24
Geotextile (type III)(erosion control)740-10.03SY245 (21%)$3.80$4.84
Machined rip-rap (class A-3)709-05.05TON245 (21%)$62.50$67.50
Machined rip-rap (class A-1)709-05.06TON215 (24%)$60.00$70.00
Cleary Construction, Inc., TDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Jones Bros. Contractors, LLC106 of 10
Rogers Group, Inc.104 of 10
Charles Blalock & Sons, Inc.84 of 8
Civil Constructors, LLC84 of 8
MasTec Civil, LLC60 of 6
Summers-Taylor, Inc.53 of 5
Bell & Associates Construction, LLC41 of 4
Mack Construction, LLC42 of 4
Vulcan Construction Materials, LLC31 of 3
Whaley Construction, LLC31 of 3
Cleary Construction, Inc., TDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
14 AUG 2026CN262058Cumberland CountyThe grading, drainage, construction of concrete bulb-tee bridges, and paving on u.s. 127 (s.r. 28) from near potato farm road to near lowe r3 of 6$76,566,329+9.0%
14 AUG 2026CN261061Knox CountyThe intersection improvements on s.r. 131 (emory road) at harrell road/carpenter road (l.m. 9.5), including grading, drainage, signals, and 2 of 4$9,179,203+16%
26 JUN 2026CN261044Monroe CountyThe grading, drainage, signals and paving on s.r. 322 from sheppard road (l.m. 13.34) to s.r. 72 (l.m. 15.53)3 of 6$24,634,446+17%
26 JUN 2026CN263057Rutherford CountyThe widening on s.r. 268 from u.s. 41 (u.s. 70s, s.r. 1, nw broad street) (l.m. 0.00) to u.s. 231 (s.r. 10, memorial boulevard) (l.m. 4.39),2 of 4$126,995,936+3.0%
03 OCT 2025CNZ902White CountyThe construction of a small drainage structure on s.r. 111 at l.m. 15.763 of 5$3,181,651+32%
03 OCT 2025CNZ250Jackson CountyThe construction of a precast concrete box bridge on s.r. 53 near l.m. 17.561 of 7$2,745,400Low, 6.0% under the second
03 OCT 2025CNZ111Putnam CountyThe grading, drainage, construction of a concrete box beam bridge, and paving on a s.i.a. route serving project sim (portobello america, inc3 of 7$4,740,588+19%
15 AUG 2025CNZ221Sumner CountyThe grading, drainage, bridges, signals, and paving on s.r. 109 (portland bypass) from s.r. 52 west of portland to existing s.r. 109 north o3 of 6$92,911,605+4.0%
25 JUL 2025CNZ233Smith CountyThe emergency slope stabilization on s.r. 141 from near l.m. 14.68 to l.m. 14.772 of 3$3,326,633+14%
27 JUN 2025CNZ178Roane CountyThe construction of a concrete bulb-tee beam bridge on u.s. 27 (s.r. 29) over u.s. 27 (s.r. 29)/s.r. 61 (l.m. 12.10), including grading, dra6 of 7$5,943,298+33%
09 MAY 2025CNZ164Williamson CountyThe construction of pedestrian facilities on s.r. 100 from the fairview community center (l.m. 3.08) to bowie lake road (l.m. 5.19), includi4 of 4$9,940,621+42%
09 MAY 2025CNZ153Wilson CountyThe grading, drainage, signals, and paving on u.s. 70 (s.r. 24) from terrace hill road (l.m. 5.90) to adeles garden road (l.m. 6.49)3 of 5$2,165,942+32%
21 MAR 2025CNZ101Rutherford CountyThe grading, drainage, signals, and paving on u.s. 41 (s.r. 1) from near jefferson pike (l.m. 3.38) to near s.r. 266 (sam ridley parkway) (l2 of 5$6,325,075+4.0%
06 DEC 2024CNY270Benton And Decatur CountiesThe grading, drainage, and paving on i-40 at the u.s. 641 (s.r. 69) interchange (l.m. 5.62) (exit 126), including lighting and signals2 of 3$13,984,926+26%
06 DEC 2024CNY292Sumner CountyThe grading, drainage, signals, and paving on a s.i.a. route serving project woolhawk (facebook data center), including u.s. 31e (s.r. 6) an6 of 6$3,823,631+38%
18 OCT 2024CNY205Hamblen CountyThe grading, drainage, construction of a concrete box bridge, signals, and paving on u.s. 11e (s.r. 34) from u.s. 25e (s.r. 32) (l.m. 11.14)3 of 4$68,967,941+8.0%
04 OCT 2024CNY234Rutherford CountyThe grading, drainage, construction of concrete box bridges, signals, and paving on s.r. 99 (new salem highway) from west of veterans parkwa2 of 5$54,107,565+2.0%
04 OCT 2024CNY161Sumner CountyThe grading, drainage, construction of a concrete box bridge, paving, and signals on walton ferry road/old shackle island road from nokes dr2 of 4$21,285,836+3.0%
16 AUG 2024CNY184Putnam And Smith CountiesThe construction of a concrete box beam bridge on webster road over little indian creek (l.m. 0.86), including grading, drainage, and paving4 of 4$2,581,290+53%
21 JUN 2024CNY172Campbell CountyThe improvement of the intersection on s.r. 63 at s.r. 297, and construction of a truck climbing lane from west of old s.r. 63 to west of st3 of 4$12,157,177+38%
21 JUN 2024CNY171Robertson CountyThe i-65 weigh station improvements near the kentucky state line (l.m. 15.10 - l.m. 16.01)2 of 3$30,856,745+4.0%
09 FEB 2024CNY069Cocke CountyThe slide mitigation on u.s. 25e (s.r. 32) near l.m. 28.27, including grading, drainage, retaining wall, and paving1 of 4$7,326,567Low, 9.0% under the second
09 FEB 2024CNY032Montgomery CountyThe construction of a concrete box culvert on u.s. 41a bypass (s.r. 12) near s.r. 13/s.r. 48 (l.m. 12.85), including grading, drainage, and 1 of 2$8,684,912Low, 3.0% under the second
08 DEC 2023CNX350HamblenThe grading, drainage, signals and paving on u.s. 25e (s.r. 32) at the intersection of progress parkway/thoroughbred run road in morristown 1 of 5$4,994,580Low, 10% under the second
08 DEC 2023CNX406JacksonThe rockfall mitigation on s.r. 135 north of daniel hill lane (l.m. 7.1)2 of 4$3,058,772+12%
Cleary Construction, Inc.: latest TDOT bids in the data

How this record was read

TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

  • Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy