TDOT contract CNZ221 bid tabulation
The grading, drainage, bridges, signals, and paving on s.r. 109 (portland bypass) from s.r. 52 west of portland to existing s.r. 109 north of portland. Let by Tennessee DOT on August 15, 2025, Sumner County. 6 bids received; low bid $88,968,066 by Scotty's Contracting & Stone, LLC.
- Owner
- Tennessee DOT
- Letting
- 15 AUG 2025
- Pay items
- 512
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Scotty's Contracting & Stone, LLC | $88,968,066 | Low |
| 2 | Jones Bros. Contractors, LLC | $90,027,068 | +1.0% |
| 3 | Cleary Construction, Inc. | $92,911,605 | +4.0% |
| 4 | MasTec Civil, LLC | $102,508,943 | +15% |
| 5 | Rogers Group, Inc. | $106,746,287 | +20% |
| 6 | Bell & Associates Construction, LLC | $112,115,669 | +26% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Scotty's Contracting & Stone, LLC | 2. Jones Bros. Contractors, LLC | 3. Cleary Construction, Inc. | 4. MasTec Civil, LLC | 5. Rogers Group, Inc. | 6. Bell & Associates Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $458,380 | $600,000 | $573,000 | $1,200,000 | $640,408 | $585,001 |
| 2 | 3D design model (105-01.01) | LS | 1 | $25,000 | $25,000 | $25,000 | $25,000 | $25,000 | $25,000 |
| 3 | CPM project schedule (108-03) | LS | 1 | $165,003 | $250,000 | $174,800 | $45,000 | $310,847 | $102,359 |
| 4 | Trainee (109-10.01) | HR | 6,640 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
| 5 | Clearing and grubbing (201-01) | LS | 1 | $326,233 | $2,850,000 | $926,000 | $4,500,000 | $381,733 | $515,813 |
| 6 | Removal of structures and obstructions (202-01) | LS | 1 | $96,000 | $100,000 | $435,000 | $1,250,000 | $112,331 | $135,692 |
| 7 | Removal of buildings (tract no. 225) (202-06.01) | LS | 1 | $34,572 | $100.00 | $7,714.16 | $23,000 | $40,454 | $25,357 |
| 8 | Removal of buildings (tract no. 234) (202-06.02) | LS | 1 | $28,136 | $100.00 | $5,142.77 | $32,000 | $32,923 | $29,637 |
| 9 | Removal of buildings (tract no. 235) (202-06.03) | LS | 1 | $31,464 | $100.00 | $5,142.77 | $25,000 | $36,817 | $25,357 |
| 10 | Removal of buildings (tract no. 236) (202-06.04) | LS | 1 | $31,464 | $100.00 | $5,142.77 | $16,000 | $36,817 | $25,357 |
| 11 | Removal of buildings (tract no. 244) (202-06.05) | LS | 1 | $28,136 | $100.00 | $5,142.77 | $21,000 | $32,923 | $25,357 |
| 12 | Removal of buildings (tract no. 254) (202-06.06) | LS | 1 | $30,256 | $100.00 | $5,142.77 | $30,000 | $35,403 | $27,497 |
| 13 | Removal of buildings (tract no. 255) (202-06.07) | LS | 1 | $8,768.03 | $100.00 | $5,142.77 | $6,500.00 | $10,260 | $25,357 |
| 14 | Removal of buildings (tract no. 261) (202-06.08) | LS | 1 | $70,768 | $100.00 | $10,286 | $70,000 | $106,210 | $33,917 |
| 15 | Removal of buildings (tract no. 277) (202-06.09) | LS | 1 | $33,000 | $100.00 | $7,714.16 | $35,000 | $47,975 | $29,637 |
| 16 | Removal of buildings (tract no. 281) (202-06.10) | LS | 1 | $28,136 | $100.00 | $5,142.77 | $35,000 | $32,923 | $29,637 |
| 17 | Removal of buildings (tract no. 294) (202-06.11) | LS | 1 | $32,376 | $100.00 | $5,142.77 | $24,000 | $37,884 | $25,357 |
| 18 | Removal of buildings (tract no. 297) (202-06.12) | LS | 1 | $22,412 | $100.00 | $5,142.77 | $30,000 | $26,225 | $29,637 |
| 19 | Removal of buildings (tract no. 309) (202-06.13) | LS | 1 | $30,256 | $100.00 | $5,142.77 | $28,000 | $35,403 | $25,357 |
| 20 | Removal of buildings (tract no. 310) (202-06.14) | LS | 1 | $30,256 | $100.00 | $5,142.77 | $17,000 | $35,403 | $25,357 |
| 21 | Road & drainage excavation (unclassified) (203-01) | CY | 562,022 | $10.56 | $5.40 | $5.40 | $6.00 | $12.86 | $11.28 |
| 22 | Road & drainage excavation (stream mitigation) (203-01.13) | CY | 10,750 | $24.27 | $20.00 | $12.00 | $10.00 | $53.43 | $58.78 |
| 23 | Borrow excavation (graded solid rock) (203-02.01) | TON | 279,600 | $17.94 | $16.00 | $25.75 | $24.00 | $21.00 | $35.51 |
| 24 | Borrow excavation (unclassified) (203-03) | CY | 563,814 | $13.49 | $13.50 | $14.00 | $6.75 | $20.59 | $22.40 |
| 25 | Placing and spreading topsoil (203-04) | CY | 31,000 | $11.10 | $8.00 | $11.80 | $23.00 | $12.99 | $13.36 |
| 26 | Undercutting (203-05) | CY | 113,000 | $18.30 | $7.00 | $6.00 | $7.30 | $23.38 | $40.46 |
| 27 | Water (203-06) | MG | 5,000 | $10.75 | $1.00 | $5.50 | $30.00 | $12.58 | $15.35 |
| 28 | Settlement plate / monitoring device (203-10.05) | EACH | 4 | $6,000.00 | $3,500.00 | $1,650.00 | $2,500.00 | $6,411.40 | $4,137.19 |
| 29 | Channel substrate (203-20.01) | CY | 2,355 | $53.74 | $40.00 | $9.00 | $64.00 | $11.75 | $111.29 |
| 30 | Foundation fill material (204-08) | CY | 1,902 | $105.00 | $40.00 | $116.04 | $91.00 | $138.91 | $90.85 |
| 31 | Backfill material (flowable fill) (204-08.01) | CY | 150 | $289.65 | $300.00 | $325.00 | $485.00 | $454.14 | $473.12 |
| 32 | Filter sock (12 inch) (209-03.21) | LF | 53,050 | $3.55 | $3.50 | $3.75 | $3.60 | $3.63 | $3.41 |
| 33 | Stream mitigation - live brush layering (209-03.42) | LF | 380 | $139.04 | $175.00 | $236.81 | $324.00 | $133.57 | $302.80 |
| 34 | Placing native stone in new channel (209-03.66) | SY | 1,200 | $69.67 | $8.00 | $109.31 | $20.00 | $106.86 | $111.32 |
| 35 | Stream mitigation – wood toe W/reinforced earth (209-03.67) | LF | 380 | $194.61 | $250.00 | $234.81 | $108.00 | $416.74 | $244.91 |
| 36 | Protected area marker (white with decal) (209-03.99) | EACH | 290 | $73.62 | $180.00 | $66.31 | $84.00 | $80.14 | $200.38 |
| 37 | Sediment removal (209-05) | CY | 21,734 | $9.35 | $6.00 | $3.34 | $14.00 | $19.23 | $22.53 |
| 38 | 16" dia coir log (for streams) (209-06.03) | LF | 500 | $4.26 | $40.00 | $116.24 | $33.50 | $34.19 | $35.62 |
| 39 | Temporary silt fence (with backing) (209-08.02) | LF | 228,555 | $4.01 | $5.00 | $4.41 | $3.75 | $4.26 | $4.05 |
| 40 | Temporary silt fence (without backing) (209-08.03) | LF | 192,010 | $1.89 | $2.00 | $2.76 | $2.35 | $2.67 | $2.78 |
| 41 | Rock check dam (209-08.07) | EACH | 492 | $649.93 | $725.00 | $928.29 | $878.00 | $897.60 | $935.11 |
| 42 | Enhanced rock check dam (209-08.08) | EACH | 295 | $698.31 | $840.00 | $972.49 | $921.00 | $940.34 | $979.64 |
| 43 | Filter sock check dam (209-08.09) | EACH | 58 | $188.53 | $175.00 | $326.01 | $308.00 | $315.23 | $328.40 |
| 44 | Sandbags (209-09.01) | BAG | 600 | $4.76 | $12.00 | $5.57 | $10.80 | $10.81 | $6.68 |
| 45 | Sediment filter bag (15' X 15') (209-09.03) | EACH | 20 | $607.47 | $700.00 | $882.44 | $272.00 | $277.83 | $289.44 |
| 46 | Curb inlet protection (type 4) (209-09.43) | EACH | 39 | $279.41 | $125.00 | $198.92 | $188.00 | $192.34 | $200.38 |
| 47 | Temporary sediment trap (209-10.20) | CY | 3,060 | $13.82 | $14.00 | $16.58 | $80.00 | $34.19 | $16.01 |
| 48 | Sediment basin baffles (209-11.20) | LF | 310 | $3.45 | $25.00 | $13.26 | $20.00 | $37.40 | $16.70 |
| 49 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 35 | $19.44 | $9.00 | $4.42 | $10.50 | $10.69 | $64.06 |
| 50 | Catch basin protection (type A) (209-40.30) | EACH | 2 | $363.57 | $500.00 | $768.05 | $726.00 | $742.65 | $8,510.63 |
| 51 | Catch basin protection (type D) (209-40.33) | EACH | 28 | $201.20 | $500.00 | $303.90 | $288.00 | $293.86 | $306.14 |
| 52 | Catch basin filter assembly(type 1) (209-40.41) | EACH | 3 | $588.08 | $150.00 | $718.32 | $680.00 | $694.57 | $723.60 |
| 53 | Catch basin filter assembly(type 2) (209-40.42) | EACH | 27 | $543.82 | $525.00 | $718.32 | $679.00 | $694.57 | $723.60 |
| 54 | Catch basin filter assembly(type 4) (209-40.44) | EACH | 1 | $610.20 | $525.00 | $1,989.18 | $1,882.00 | $1,923.42 | $2,003.81 |
| 55 | Catch basin filter assembly(type 6) (209-40.46) | EACH | 39 | $581.26 | $525.00 | $718.32 | $680.00 | $694.57 | $723.60 |
| 56 | Catch basin filter assembly(type 8) (209-40.48) | EACH | 6 | $1,927.62 | $1,950.00 | $1,989.19 | $1,882.00 | $1,923.42 | $2,003.81 |
| 57 | Temporary diversion channel (209-65.03) | LF | 8,400 | $17.63 | $25.00 | $6.12 | $21.00 | $24.58 | $24.90 |
| 58 | Temporary in stream diversion (209-65.04) | LF | 1,580 | $93.85 | $60.00 | $55.26 | $42.00 | $57.70 | $87.39 |
| 59 | Granular backfill (roadway) (303-01.01) | TON | 16,477 | $58.30 | $40.00 | $43.02 | $46.00 | $29.92 | $32.17 |
| 60 | Mineral aggregate (size 57) (303-10.01) | TON | 3,062 | $47.36 | $63.00 | $39.90 | $57.00 | $72.13 | $52.69 |
| 61 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 1,234 | $110.00 | $136.00 | $121.56 | $116.00 | $110.00 | $122.45 |
| 62 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 2,343 | $120.00 | $155.00 | $132.61 | $125.00 | $120.00 | $133.59 |
| 63 | Asp. conc. mix(PG70-22) (BPMB-HM) GR. A-S (307-01.21) | TON | 33,335 | $98.50 | $120.00 | $108.85 | $104.00 | $98.50 | $103.68 |
| 64 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01) | TON | 44,615 | $89.75 | $105.00 | $99.18 | $94.00 | $89.75 | $95.48 |
| 65 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08) | TON | 28,653 | $95.50 | $110.00 | $105.54 | $103.00 | $95.50 | $101.28 |
| 66 | Treated permeable base (313-03) | SY | 12,860 | $23.75 | $27.00 | $26.25 | $26.00 | $23.75 | $26.44 |
| 67 | Bituminous material for tack coat (TC) (403-01) | TON | 175 | $1,000.00 | $850.00 | $1,105.11 | $1,080.00 | $1,000.00 | $1,113.23 |
| 68 | Saw cutting asphalt pavement (407-20.05) | LF | 10,000 | $1.21 | $2.00 | $4.42 | $6.50 | $2.94 | $3.73 |
| 69 | Acs mix (PG64-22) grading E shoulder (411-01.07) | TON | 4,843 | $118.00 | $112.00 | $130.40 | $128.00 | $118.00 | $131.36 |
| 70 | Acs mix(PG64-22) grading D (411-01.10) | TON | 2,086 | $155.00 | $190.00 | $171.29 | $167.00 | $155.00 | $172.55 |
| 71 | Acs mix(PG70-22) grading D (411-02.10) | TON | 14,615 | $118.00 | $133.00 | $130.40 | $125.00 | $118.00 | $120.98 |
| 72 | Scoring shoulders (continuous) (16IN width) (411-12.01) | LM | 12 | $975.00 | $1,205.00 | $925.53 | $1,445.00 | $747.67 | $751.43 |
| 73 | Cold planing bituminous pavement (415-01.01) | TON | 2,100 | $39.50 | $44.40 | $43.65 | $42.00 | $39.50 | $43.97 |
| 74 | Portland cement concrete pavement (plain) 10" (501-01.03) | SY | 12,860 | $133.50 | $135.00 | $137.03 | $163.00 | $134.52 | $166.98 |
| 75 | Class A concrete (roadway) (604-01.01) | CY | 1,774 | $810.00 | $820.00 | $895.14 | $1,215.00 | $1,175.42 | $1,250.78 |
| 76 | Steel bar reinforcement (roadway) (604-01.02) | LB | 272,452 | $1.67 | $1.25 | $1.85 | $1.50 | $1.82 | $1.08 |
| 77 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 6,803 | $97.94 | $63.00 | $79.33 | $82.00 | $114.61 | $68.83 |
| 78 | 24" concrete pipe culvert (class III) (607-05.02) | LF | 2,835 | $113.83 | $82.00 | $103.95 | $120.00 | $133.20 | $91.19 |
| 79 | 30" concrete pipe culvert (class III) (607-06.02) | LF | 1,649 | $184.72 | $110.00 | $129.33 | $160.00 | $216.15 | $122.22 |
| 80 | 36" concrete pipe culvert (class III) (607-07.02) | LF | 444 | $213.61 | $140.00 | $164.04 | $195.00 | $249.95 | $168.46 |
| 81 | 42" concrete pipe culvert (class III) (607-08.02) | LF | 456 | $227.94 | $175.00 | $215.92 | $253.00 | $266.72 | $229.83 |
| 82 | 48" concrete pipe culvert (class III) (607-09.02) | LF | 80 | $273.28 | $250.00 | $267.12 | $250.00 | $319.77 | $283.78 |
| 83 | 23"X 14" horizontal oval concrete pipe culvert (607-16.01) | LF | 103 | $120.61 | $110.00 | $106.59 | $148.00 | $141.13 | $97.23 |
| 84 | 30"X 19" horizontal oval concrete pipe culvert (607-16.02) | LF | 437 | $146.67 | $127.00 | $137.98 | $136.00 | $171.62 | $134.53 |
| 85 | 45"X 29" horizontal oval concrete pipe culvert (607-16.06) | LF | 178 | $214.22 | $250.00 | $212.87 | $240.00 | $250.67 | $233.44 |
| 86 | 18" pipe culvert (side drain) (607-39.02) | LF | 895 | $67.79 | $82.00 | $88.68 | $66.00 | $79.32 | $104.94 |
| 87 | 24" pipe culvert (side drain) (607-39.03) | LF | 76 | $102.12 | $108.00 | $107.41 | $73.00 | $119.49 | $136.98 |
| 88 | 42" pipe culvert (side drain) (607-39.06) | LF | 84 | $219.35 | $180.00 | $239.75 | $114.00 | $256.67 | $258.17 |
| 89 | Class A concrete (pipe endwalls) (611-07.01) | CY | 26 | $1,763.99 | $2,400.00 | $1,397.52 | $2,800.00 | $2,708.81 | $1,593.32 |
| 90 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 961 | $4.70 | $2.00 | $2.86 | $2.70 | $9.83 | $1.72 |
| 91 | 18IN endwall (side drain) (611-07.31) | EACH | 8 | $2,497.23 | $4,000.00 | $3,295.93 | $5,800.00 | $2,922.07 | $5,001.18 |
| 92 | 24IN endwall (side drain) (611-07.32) | EACH | 4 | $3,554.59 | $5,200.00 | $4,277.21 | $7,400.00 | $4,159.31 | $6,459.13 |
| 93 | 30IN endwall (side drain) (611-07.33) | EACH | 4 | $4,887.89 | $13,100 | $5,860.62 | $7,400.00 | $5,719.43 | $13,411 |
| 94 | 42IN endwall (side drain) (611-07.35) | EACH | 2 | $7,779.09 | $16,000 | $8,679.41 | $9,020.00 | $9,102.49 | $24,600 |
| 95 | 18IN endwall (cross drain) 3:1 (611-07.54) | EACH | 1 | $1,689.81 | $1,825.00 | $2,505.03 | $3,000.00 | $1,977.29 | $3,230.94 |
| 96 | 18IN endwall (cross drain) 4:1 (611-07.55) | EACH | 9 | $2,023.79 | $2,000.00 | $2,772.74 | $3,300.00 | $2,368.08 | $3,468.82 |
| 97 | 18IN endwall (cross drain) 6:1 (611-07.56) | EACH | 6 | $2,585.40 | $2,600.00 | $3,459.87 | $4,100.00 | $3,025.23 | $4,013.38 |
| 98 | 24IN endwall (cross drain) 3:1 (611-07.57) | EACH | 2 | $2,218.91 | $2,800.00 | $3,026.98 | $4,100.00 | $2,596.40 | $3,784.46 |
| 99 | 24IN endwall (cross drain) 4:1 (611-07.58) | EACH | 9 | $2,705.96 | $3,100.00 | $3,448.22 | $4,500.00 | $3,166.31 | $4,168.36 |
| 100 | 30IN endwall (cross drain) 3:1 (611-07.60) | EACH | 6 | $3,019.40 | $4,700.00 | $4,009.89 | $4,700.00 | $3,533.07 | $8,215.54 |
| 101 | 30IN endwall (cross drain) 4:1 (611-07.61) | EACH | 2 | $3,633.02 | $5,600.00 | $4,622.89 | $5,700.00 | $4,251.08 | $9,152.43 |
| 102 | 30IN endwall (cross drain) 6:1 (611-07.62) | EACH | 2 | $4,910.66 | $7,200.00 | $6,167.94 | $9,800.00 | $5,746.08 | $10,973 |
| 103 | 36IN endwall (cross drain) 4:1 (611-07.64) | EACH | 4 | $4,931.02 | $9,400.00 | $5,591.66 | $8,050.00 | $5,769.90 | $10,951 |
| 104 | 42IN endwall (cross drain) 3:1 (611-07.66) | EACH | 4 | $4,877.67 | $9,600.00 | $6,574.17 | $10,100 | $5,707.47 | $16,282 |
| 105 | 42IN endwall (cross drain) 4:1 (611-07.67) | EACH | 1 | $5,961.09 | $11,000 | $8,680.77 | $10,800 | $6,975.21 | $17,851 |
| 106 | 42IN endwall (cross drain) 6:1 (611-07.68) | EACH | 1 | $8,117.64 | $14,000 | $10,568 | $11,400 | $9,498.63 | $18,707 |
| 107 | 18IN endwall (median drain) (611-07.73) | EACH | 4 | $5,912.17 | $14,100 | $7,087.18 | $4,900.00 | $6,917.96 | $14,539 |
| 108 | Catch basins, type 12, 0' - 4' depth (611-12.01) | EACH | 14 | $3,822.13 | $6,000.00 | $5,332.75 | $6,000.00 | $4,472.36 | $7,743.39 |
| 109 | Catch basins, type 12, > 4' - 8' depth (611-12.02) | EACH | 18 | $4,649.29 | $6,900.00 | $6,295.66 | $8,000.00 | $5,440.24 | $8,722.92 |
| 110 | Catch basins, type 12, > 8' - 12' depth (611-12.03) | EACH | 7 | $5,792.41 | $8,900.00 | $7,746.39 | $10,700 | $6,777.83 | $13,072 |
| 111 | Catch basins, type 39, 0' - 4' depth (611-39.01) | EACH | 20 | $4,474.24 | $7,000.00 | $5,288.59 | $6,500.00 | $5,235.41 | $10,076 |
| 112 | Catch basins, type 39, > 4' - 8' depth (611-39.02) | EACH | 4 | $4,795.99 | $11,100 | $7,747.31 | $12,900 | $5,611.90 | $13,935 |
| 113 | Catch basins, type 39, > 8' - 12' depth (611-39.03) | EACH | 1 | $7,167.34 | $12,000 | $8,419.80 | $15,200 | $8,386.67 | $20,851 |
| 114 | Catch basins, type 39, > 20' - 24' depth (611-39.06) | EACH | 1 | $25,752 | $50,000 | $27,802 | $53,000 | $30,133 | $51,747 |
| 115 | Catch basins, type 40, 0' - 4' depth (611-40.01) | EACH | 3 | $7,759.67 | $7,900.00 | $8,307.35 | $9,100.00 | $9,079.77 | $12,538 |
| 116 | Catch basins, type 40, > 4' - 8' depth (611-40.02) | EACH | 3 | $9,200.02 | $8,800.00 | $9,728.30 | $10,400 | $10,765 | $14,004 |
| 117 | Catch basins, type 42, 0' - 4' depth (611-42.01) | EACH | 4 | $2,968.78 | $7,100.00 | $5,988.38 | $7,700.00 | $3,473.84 | $5,856.31 |
| 118 | Junction structure, 48IN round,> 4FT-8FT depth (611-63.01) | EACH | 2 | $3,750.28 | $6,000.00 | $5,434.74 | $7,300.00 | $4,388.29 | $8,166.42 |
| 119 | 18" temporary drainage pipe (621-03.02) | LF | 200 | $52.61 | $51.00 | $72.95 | $48.00 | $61.56 | $95.16 |
| 120 | 36" temporary drainage pipe (621-03.05) | LF | 440 | $92.24 | $90.00 | $163.37 | $90.00 | $107.93 | $195.05 |
| 121 | 42" temporary drainage pipe (621-03.06) | LF | 240 | $122.76 | $115.00 | $237.35 | $125.00 | $143.64 | $240.98 |
| 122 | Temporary shoring (621-05.02) | LS | 1 | $65,000 | $50,000 | $82,883 | $65,000 | $69,457 | $47,407 |
| 123 | Prefabricated vertical drain (627-01.02) | LF | 174,300 | $2.10 | $2.10 | $2.71 | $3.00 | $1.80 | $2.10 |
| 124 | Concrete sidewalk (4 ") (701-01.01) | SF | 50,873 | $5.99 | $6.00 | $6.63 | $7.00 | $6.27 | $6.68 |
| 125 | Concrete driveway (701-02) | SF | 2,278 | $15.88 | $10.00 | $11.05 | $12.30 | $10.17 | $11.13 |
| 126 | Concrete curb ramp (701-02.03) | SF | 1,472 | $20.91 | $12.50 | $13.81 | $15.00 | $20.01 | $13.92 |
| 127 | Concrete median pavement (701-03) | CY | 23 | $597.18 | $650.00 | $718.32 | $804.00 | $657.27 | $723.60 |
| 128 | Concrete curb (702-01) | CY | 16 | $582.38 | $750.00 | $828.83 | $952.00 | $948.88 | $834.92 |
| 129 | Extruded sloping curb (702-01.01) | LF | 170 | $40.01 | $20.00 | $22.10 | $22.00 | $27.04 | $22.26 |
| 130 | Concrete combined curb & gutter (702-03) | CY | 695 | $428.60 | $360.00 | $397.84 | $456.00 | $543.31 | $400.76 |
| 131 | Portable barrier rail delineator (705-04.50) | EACH | 44 | $25.00 | $25.00 | $27.63 | $16.50 | $16.03 | $16.70 |
| 132 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 14,300 | $25.00 | $25.00 | $27.63 | $26.00 | $27.12 | $27.83 |
| 133 | GR terminaltrailing end (type 13) MASH TL-3 (705-06.10) | EACH | 21 | $1,200.00 | $1,200.00 | $1,326.13 | $1,322.00 | $1,301.81 | $1,335.87 |
| 134 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 9 | $1,200.00 | $1,200.00 | $1,326.13 | $1,322.00 | $1,301.81 | $1,335.87 |
| 135 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 20 | $3,400.00 | $3,400.00 | $3,757.36 | $3,750.00 | $3,688.45 | $3,784.97 |
| 136 | Thrie beam bridge transition MASH TL-3 (705-06.25) | EACH | 8 | $3,300.00 | $3,300.00 | $3,646.85 | $3,650.00 | $3,579.97 | $3,673.65 |
| 137 | GR terminal (energy absorbing) MASH TL-2 (705-06.30) | EACH | 7 | $3,200.00 | $3,200.00 | $3,536.34 | $3,530.00 | $3,471.48 | $3,562.33 |
| 138 | Radius rail (706-06.03) | LF | 100 | $32.00 | $32.00 | $35.36 | $36.00 | $34.71 | $35.62 |
| 139 | Michigan and modified michigan end shoe (706-10.80) | EACH | 4 | $125.00 | $125.00 | $138.14 | $138.00 | $135.60 | $139.15 |
| 140 | Stock fence (707-03.01) | LF | 39,681 | $6.98 | $6.40 | $7.71 | $7.50 | $7.69 | $7.93 |
| 141 | End, braced line, corner post assembly(stock fence) (707-03.02) | EACH | 175 | $250.00 | $270.00 | $276.28 | $270.00 | $275.40 | $283.99 |
| 142 | Removal of fence (existing C.A. fence) (707-06.01) | LF | 1,000 | $8.93 | $6.00 | $6.63 | $6.50 | $6.61 | $6.82 |
| 143 | High-visibility construction fence (707-08.11) | LF | 153,420 | $1.01 | $2.00 | $3.09 | $3.25 | $2.99 | $3.12 |
| 144 | Markers (concrete R.O.W. posts) (708-02.01) | EACH | 223 | $264.34 | $335.00 | $331.53 | $324.00 | $319.70 | $340.78 |
| 145 | Machined rip-rap (class A-3) (709-05.05) | TON | 3,221 | $41.46 | $56.00 | $40.79 | $61.00 | $48.52 | $71.34 |
| 146 | Machined rip-rap (class A-1) (709-05.06) | TON | 10,657 | $43.06 | $50.00 | $40.79 | $67.00 | $50.38 | $71.34 |
| 147 | Machined rip-rap (class B) (709-05.08) | TON | 1,697 | $52.04 | $64.00 | $52.76 | $86.00 | $60.89 | $73.39 |
| 148 | Machined rip-rap (class C) (709-05.09) | TON | 182 | $52.04 | $86.00 | $52.76 | $77.00 | $60.89 | $73.38 |
| 149 | Rock riffles (709-05.81) | LS | 1 | $68,677 | $75,000 | $23,109 | $64,635 | $136,242 | $115,002 |
| 150 | Aggregate underdrains (with pipe) (710-02) | LF | 53,051 | $7.14 | $12.50 | $13.96 | $14.00 | $8.25 | $13.92 |
| 151 | Lateral underdrain (710-05) | LF | 6,000 | $16.49 | $11.75 | $13.12 | $14.00 | $19.03 | $13.08 |
| 152 | Lateral underdrain endwall (2:1) (710-06.11) | EACH | 10 | $605.35 | $1,000.00 | $1,116.83 | $1,173.00 | $698.61 | $1,113.23 |
| 153 | Lateral underdrain endwall (3:1) (710-06.12) | EACH | 10 | $605.35 | $1,000.00 | $1,116.83 | $1,173.00 | $698.61 | $1,113.23 |
| 154 | Lateral underdrain endwall (4:1) (710-06.13) | EACH | 20 | $581.93 | $1,000.00 | $1,116.83 | $1,173.00 | $671.57 | $1,113.23 |
| 155 | Lateral underdrain endwall (6:1) (710-06.15) | EACH | 100 | $623.03 | $1,000.00 | $1,116.83 | $1,173.00 | $719.01 | $1,113.23 |
| 156 | Traffic control (712-01) | LS | 1 | $419,293 | $500,000 | $275,000 | $1,073,000 | $500,000 | $46,004 |
| 157 | Interconnected portable barrier rail (712-02.02) | LF | 1,760 | $37.51 | $32.00 | $51.80 | $70.00 | $16.50 | $33.74 |
| 158 | Remove and relocate portable barrier rail (712-02.36) | LF | 340 | $17.60 | $15.00 | $8.37 | $43.00 | $8.52 | $16.99 |
| 159 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 8 | $9,700.00 | $15,000 | $16,908 | $10,476 | $10,365 | $10,798 |
| 160 | Flexible drums (channelizing) (712-04.01) | EACH | 525 | $45.00 | $45.00 | $49.73 | $47.00 | $48.09 | $50.10 |
| 161 | Warning lights (type A) (712-05.01) | EACH | 292 | $30.00 | $30.00 | $33.15 | $32.00 | $32.06 | $33.40 |
| 162 | Signs (construction) (712-06) | SF | 1,790 | $7.10 | $9.00 | $7.85 | $8.00 | $8.90 | $7.90 |
| 163 | Temporary barricades (type III) (712-07.03) | LF | 612 | $16.00 | $16.00 | $17.68 | $17.00 | $17.10 | $17.81 |
| 164 | Arrow board (type C) (712-08.03) | EACH | 2 | $2,000.00 | $2,000.00 | $2,210.21 | $2,160.00 | $2,137.13 | $2,226.46 |
| 165 | Mobile message sign unit W/attenuator (712-08.10) | HR | 2,000 | $105.00 | $105.00 | $116.04 | $113.00 | $112.20 | $116.89 |
| 166 | Class A concrete (foundation for sign supports) (713-01.01) | CY | 60 | $600.00 | $600.00 | $663.06 | $648.00 | $641.14 | $667.94 |
| 167 | Steel bar reinforcement(foundation for sign supports) (713-01.02) | LB | 7,160 | $3.10 | $3.10 | $3.43 | $4.00 | $3.31 | $3.45 |
| 168 | Delineator (mile marker) & steel post (713-02.04) | EACH | 10 | $150.00 | $150.00 | $165.77 | $162.00 | $160.28 | $166.98 |
| 169 | Steel hollow square post (breakaway) sign supports (713-05) | LB | 320 | $6.00 | $6.00 | $6.63 | $6.50 | $6.41 | $6.68 |
| 170 | Steel I-beams & WF-beams(breakaway) sign support (713-06) | LB | 1,845 | $5.85 | $5.85 | $6.46 | $6.30 | $6.25 | $6.51 |
| 171 | "U" section steel posts (713-11.01) | LB | 1,386 | $4.61 | $4.61 | $5.09 | $5.00 | $4.93 | $5.13 |
| 172 | Perforated/knockout square tube post (713-11.02) | LB | 5,840 | $5.20 | $5.20 | $5.75 | $5.60 | $5.56 | $5.79 |
| 173 | P post slip base (713-11.21) | EACH | 175 | $200.00 | $200.00 | $221.02 | $216.00 | $213.71 | $222.65 |
| 174 | U post slip base (713-11.22) | EACH | 84 | $550.00 | $550.00 | $607.81 | $594.00 | $587.71 | $612.27 |
| 175 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 1,274 | $18.45 | $18.45 | $20.39 | $20.00 | $19.72 | $20.54 |
| 176 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 1,435 | $19.25 | $19.25 | $21.27 | $21.00 | $20.57 | $21.43 |
| 177 | Extruded aluminum panel signs (713-14) | SF | 532 | $32.00 | $32.00 | $35.36 | $35.00 | $34.19 | $35.62 |
| 178 | Street name sign (suspended 0.100IN thick) (713-14.22) | SF | 375 | $92.50 | $23.00 | $25.42 | $25.00 | $75.02 | $73.03 |
| 179 | Removal of signs, posts and footings (713-15) | LS | 1 | $8,000.00 | $8,000.00 | $8,840.84 | $8,640.00 | $8,548.53 | $8,905.82 |
| 180 | Suspended flat sheet aluminum sign (0.080" thick) (713-15.07) | EACH | 5 | $130.00 | $130.00 | $143.66 | $140.00 | $637.90 | $200.38 |
| 181 | Metal barricade (type III) (713-15.35) | EACH | 5 | $1,300.00 | $1,300.00 | $1,436.64 | $1,404.00 | $1,389.14 | $1,447.20 |
| 182 | Changeable message sign unit (713-16.01) | EACH | 10 | $10,000 | $10,000 | $11,051 | $8,640.00 | $10,686 | $11,132 |
| 183 | Signs (R3-2) (713-16.20) | EACH | 2 | $721.00 | $130.00 | $143.67 | $140.00 | $138.91 | $657.92 |
| 184 | Signs (R10-12) (713-16.21) | EACH | 3 | $711.00 | $130.00 | $132.61 | $130.00 | $128.23 | $657.92 |
| 185 | Remove and replace sign (relocate existing signs) (713-16.50) | EACH | 8 | $400.00 | $400.00 | $442.04 | $432.00 | $427.43 | $445.29 |
| 186 | Temporary raised pavement marker (716-01.05) | EACH | 428 | $20.00 | $15.00 | $16.85 | $22.00 | $21.37 | $16.70 |
| 187 | Raised pavement marker removal (716-01.14) | EACH | 428 | $12.00 | $20.00 | $22.46 | $13.00 | $12.82 | $1.11 |
| 188 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 192 | $40.00 | $37.00 | $41.55 | $32.00 | $32.06 | $55.66 |
| 189 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 115 | $40.00 | $37.00 | $41.55 | $32.00 | $32.06 | $55.66 |
| 190 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 888 | $40.00 | $37.00 | $41.55 | $32.00 | $32.06 | $55.66 |
| 191 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 311 | $45.00 | $50.00 | $41.55 | $30.00 | $29.92 | $55.66 |
| 192 | Plastic pavement marking (stop line) (716-02.05) | LF | 770 | $24.00 | $25.00 | $28.08 | $27.00 | $26.71 | $33.40 |
| 193 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 41 | $250.00 | $225.00 | $252.69 | $270.00 | $267.14 | $278.31 |
| 194 | Plastic pavement marking (24" barrier line) (716-02.07) | LF | 638 | $13.00 | $25.00 | $28.08 | $19.00 | $19.23 | $13.36 |
| 195 | Plastic pavement marking (longitudinal cross-walk) (716-02.09) | LF | 367 | $30.00 | $45.00 | $50.54 | $59.00 | $58.77 | $55.66 |
| 196 | Plastic pavement marking (8IN line) (716-02.12) | LM | 1.20 | $10,000 | $10,000 | $11,231 | $17,280 | $17,097 | $16,698 |
| 197 | Plastic pavement marking (straight-turn arrow) (716-04.01) | EACH | 1 | $250.00 | $400.00 | $449.23 | $540.00 | $534.28 | $389.63 |
| 198 | Plastic pavement marking (transverse shoulder) (716-04.04) | LF | 138 | $15.00 | $15.00 | $16.85 | $8.60 | $8.55 | $13.36 |
| 199 | Plastic pavement marking (exit only arrow) (716-04.07) | EACH | 3 | $500.00 | $750.00 | $842.31 | $648.00 | $641.14 | $534.35 |
| 200 | Plastic pavement marking (yield line) (716-04.12) | SF | 69 | $50.00 | $55.00 | $61.77 | $32.00 | $32.06 | $50.10 |
| 201 | Plastic pavement marking (lane reduction arrow) (716-04.14) | EACH | 2 | $300.00 | $750.00 | $842.31 | $648.00 | $641.14 | $834.92 |
| 202 | Painted pavement marking (8" barrier line) (716-05.02) | LF | 2,334 | $2.00 | $2.50 | $2.81 | $1.10 | $1.07 | $0.95 |
| 203 | Painted pavement marking (6" line) (716-05.20) | LM | 12 | $1,750.00 | $1,750.00 | $1,965.38 | $1,404.00 | $1,389.14 | $2,783.07 |
| 204 | Contrast pavement marking 8" (716-09.84) | LF | 21 | $125.00 | $7.50 | $8.42 | $54.00 | $53.43 | $44.53 |
| 205 | Contrast pavement marking 6" (716-09.86) | LM | 1.55 | $40,000 | $35,000 | $39,308 | $32,400 | $32,057 | $27,831 |
| 206 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 24 | $7,250.00 | $8,000.00 | $8,984.59 | $8,208.00 | $8,121.10 | $10,576 |
| 207 | Enhanced flatline thermo PVMT MRKNG (8IN barrier line) (716-12.03) | LF | 2,652 | $3.00 | $3.50 | $3.93 | $4.30 | $4.27 | $2.78 |
| 208 | Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05) | LF | 3,356 | $2.50 | $2.75 | $3.09 | $3.20 | $3.21 | $3.34 |
| 209 | Spray thermo PVMT MRKNG (60 mil) (6IN line) (716-13.02) | LM | 4.30 | $3,200.00 | $6,000.00 | $6,738.44 | $4,860.00 | $4,808.55 | $6,679.36 |
| 210 | Mobilization (717-01) | LS | 1 | $3,662,925 | $7,195,000 | $4,000,000 | $10,250,000 | $7,472,237 | $7,848,097 |
| 211 | Field office (type 2) (722-01.02) | LS | 1 | $113,950 | $200,000 | $132,605 | $300,000 | $210,000 | $170,489 |
| 212 | Removal of signal equipment (730-01.02) | EACH | 2 | $3,825.00 | $20,000 | $2,255.32 | $5,613.00 | $4,128.55 | $4,258.10 |
| 213 | Signal head assembly (130 A3 with backplate) (730-02.03) | EACH | 12 | $1,195.00 | $2,125.00 | $1,668.93 | $1,633.00 | $1,289.84 | $1,330.31 |
| 214 | Signal head assembly (130 with backplate) (730-02.09) | EACH | 28 | $1,195.00 | $2,125.00 | $1,668.93 | $1,429.00 | $1,289.83 | $1,330.31 |
| 215 | Signal head assembly (150 A2H with backplate) (730-02.17) | EACH | 10 | $1,890.00 | $2,700.00 | $2,548.51 | $2,551.00 | $2,039.99 | $2,104.00 |
| 216 | Signal head assembly (130 A3FY) (730-02.54) | EACH | 2 | $1,195.00 | $2,150.00 | $1,668.94 | $1,225.00 | $1,289.84 | $1,330.31 |
| 217 | Signal head assembly (130 A3FY with backplate) (730-02.55) | EACH | 1 | $1,195.00 | $2,150.00 | $1,668.93 | $1,429.00 | $1,289.83 | $1,330.30 |
| 218 | Install pull box (type B) (730-03.21) | EACH | 10 | $1,670.00 | $2,500.00 | $1,353.19 | $1,633.00 | $1,802.53 | $1,859.09 |
| 219 | Electrical service connection (730-05.01) | EACH | 5 | $9,600.00 | $3,500.00 | $9,021.27 | $6,531.00 | $10,362 | $10,687 |
| 220 | Modify existing electrical service connection (730-05.04) | EACH | 1 | $4,185.00 | $3,500.00 | $3,946.81 | $2,347.00 | $4,517.12 | $4,658.86 |
| 221 | Signal cable - 5 conductor (730-08.02) | LF | 2,340 | $3.00 | $2.95 | $2.82 | $2.00 | $3.24 | $3.34 |
| 222 | Signal cable - 7 conductor (730-08.03) | LF | 4,720 | $3.40 | $3.45 | $3.10 | $2.00 | $3.67 | $3.78 |
| 223 | Span wire assembly (searcy LN @ SR 52) (730-09.21) | LF | 600 | $6.80 | $7.45 | $3.38 | $3.20 | $7.34 | $7.57 |
| 224 | Span wire assembly (TGT RD @ SR 109) (730-09.22) | LF | 510 | $7.20 | $7.45 | $3.38 | $3.30 | $7.77 | $8.02 |
| 225 | Span wire assembly (new kirby RD @ SR 109) (730-09.23) | LF | 625 | $6.70 | $7.45 | $3.38 | $3.30 | $7.23 | $7.46 |
| 226 | Span wire assembly (kirby DR @ SR 109) (730-09.24) | LF | 440 | $7.70 | $7.45 | $3.38 | $7.00 | $8.31 | $8.57 |
| 227 | Span wire assembly (sharon DR/ woods RD @ SR 109) (730-09.25) | LF | 510 | $7.20 | $7.45 | $3.38 | $7.00 | $7.77 | $8.02 |
| 228 | Span wire assembly (vanatta DR @ SR 109) (730-09.26) | LF | 465 | $7.50 | $7.45 | $3.38 | $7.00 | $8.10 | $8.35 |
| 229 | Tether wire assembly - 1/4" diameter (730-10.01) | LF | 2,930 | $3.90 | $2.10 | $2.82 | $6.00 | $4.21 | $4.34 |
| 230 | Conduit 2" diameter (PVC schedule 40) (730-12.02) | LF | 885 | $27.00 | $14.75 | $13.53 | $38.00 | $29.14 | $30.06 |
| 231 | Conduit 2" diameter (directional bore) (730-12.23) | LF | 65 | $44.50 | $70.00 | $146.60 | $52.00 | $48.03 | $49.54 |
| 232 | Vehicle detector (siren activated priority control) (730-13.07) | EACH | 1 | $8,310.00 | $8,000.25 | $7,695.15 | $256.00 | $8,969.48 | $9,250.92 |
| 233 | Vehicle detector (radar - stop line) (730-13.12) | EACH | 23 | $9,310.00 | $8,800.00 | $11,570 | $10,720 | $10,049 | $10,364 |
| 234 | Vehicle detector (radar - advance) (730-13.13) | EACH | 15 | $9,990.00 | $8,800.00 | $11,570 | $11,735 | $10,783 | $11,121 |
| 235 | Modify cabinet (install eight phase actuated controller) (730-15.11) | EACH | 1 | $7,950.00 | $2,500.00 | $7,465.09 | $2,041.00 | $8,580.91 | $8,850.16 |
| 236 | Modify cabinet (APS pushbutton cable) (730-15.12) | EACH | 1 | $3,150.00 | $2,500.00 | $4,082.12 | $2,041.00 | $3,399.99 | $3,506.67 |
| 237 | Modify cabinet (countdown pedestrian signal head cable) (730-15.13) | EACH | 1 | $3,565.00 | $2,500.00 | $3,924.25 | $2,041.00 | $3,847.91 | $3,968.66 |
| 238 | Cabinet (eight phase base mounted) (730-15.32) | EACH | 5 | $24,650 | $26,000 | $28,913 | $30,612 | $26,606 | $27,441 |
| 239 | Controller (atc) (730-16.04) | EACH | 6 | $6,185.00 | $8,000.00 | $7,465.10 | $6,633.00 | $6,675.84 | $6,885.31 |
| 240 | Steel strain pole (signal support) (730-23.01) | EACH | 21 | $27,500 | $24,150 | $31,811 | $23,531 | $29,682 | $30,614 |
| 241 | Pedestal pole (type B) (730-23.29) | EACH | 2 | $5,535.00 | $4,040.00 | $3,946.81 | $3,061.00 | $5,974.26 | $6,161.72 |
| 242 | Countdown pedestrian signal (730-26.05) | EACH | 3 | $1,010.00 | $1,700.00 | $1,353.19 | $939.00 | $1,090.15 | $1,124.36 |
| 243 | Pedestrian pushbutton post (730-26.06) | EACH | 3 | $2,835.00 | $3,200.00 | $3,225.10 | $3,163.00 | $3,059.98 | $3,156.00 |
| 244 | Pedestrian pushbutton with 15IN sign (730-26.09) | EACH | 3 | $1,385.00 | $1,600.00 | $1,443.40 | $1,837.00 | $1,494.91 | $1,541.82 |
| 245 | Countdown ped SGNL head W/audible pushbutton & 15IN sign (730-26.11) | EACH | 1 | $1,010.00 | $1,800.00 | $2,571.06 | $2,245.00 | $1,090.15 | $1,124.36 |
| 246 | Battery back-UP system (730-35.06) | EACH | 6 | $10,200 | $9,500.00 | $14,457 | $13,266 | $11,009 | $11,355 |
| 247 | Geomembrane (740-06.01) | SY | 13,500 | $13.99 | $10.00 | $14.77 | $11.60 | $16.37 | $7.42 |
| 248 | Geogrid reinforcement type 2 (740-07.04) | SY | 2,350 | $5.41 | $6.00 | $3.42 | $8.14 | $3.85 | $5.33 |
| 249 | Geotextile (type III)(erosion control) (740-10.03) | SY | 11,874 | $3.20 | $3.00 | $2.89 | $5.20 | $2.40 | $2.92 |
| 250 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 317,590 | $4.31 | $3.00 | $3.64 | $2.50 | $5.04 | $4.44 |
| 251 | Temporary sediment tube 12IN (740-11.02) | LF | 213,640 | $2.89 | $2.75 | $3.76 | $3.60 | $3.63 | $3.78 |
| 252 | Seeding (with mulch) (801-01) | UNIT | 150 | $33.00 | $33.00 | $36.47 | $37.00 | $35.26 | $36.74 |
| 253 | Temporary seeding (with mulch) (801-01.07) | UNIT | 7,570 | $29.00 | $29.00 | $68.52 | $32.00 | $30.99 | $32.28 |
| 254 | Grass seed mix (ripzn/FLPL) W/mulch (801-01.35) | UNIT | 4 | $200.00 | $200.00 | $221.02 | $225.00 | $213.72 | $2,783.07 |
| 255 | Special wetland seed mixture (801-01.36) | UNIT | 1 | $200.00 | $200.00 | $221.02 | $225.00 | $213.72 | $222.65 |
| 256 | Natve seed MX final stablizatn of slopes (801-01.38) | UNIT | 85 | $87.00 | $87.00 | $96.14 | $97.00 | $92.97 | $96.85 |
| 257 | Seeding (without mulch) (801-02) | UNIT | 3,611 | $26.00 | $26.00 | $28.73 | $29.00 | $27.78 | $28.94 |
| 258 | Water (seeding & sodding) (801-03) | MG | 6,000 | $50.00 | $50.00 | $55.26 | $52.00 | $53.43 | $55.66 |
| 259 | Seed (supplemental application) (801-07) | LB | 1,000 | $5.55 | $5.55 | $6.13 | $6.20 | $5.93 | $6.18 |
| 260 | Fertilizer (supplemental application) (801-08) | TON | 30 | $1,200.00 | $1,200.00 | $1,326.13 | $1,350.00 | $1,282.28 | $1,335.87 |
| 261 | Cuttings: salix nigra (18IN-24IN length) (802-02.30) | EACH | 95 | $9.00 | $9.00 | $9.95 | $10.00 | $9.62 | $11.13 |
| 262 | Cuttings: salix sericea (18IN-24IN) (802-02.31) | EACH | 95 | $9.00 | $9.00 | $9.95 | $10.00 | $9.62 | $11.13 |
| 263 | Cuttings: cornus amomum (18IN-24IN) (802-02.32) | EACH | 95 | $9.00 | $9.00 | $9.95 | $10.00 | $9.62 | $11.13 |
| 264 | Cuttings: sambucus canadensis (18IN-24IN) (802-02.33) | EACH | 95 | $9.00 | $9.00 | $9.95 | $10.00 | $9.62 | $11.13 |
| 265 | Acer negundo (box elder seedlng B.R.) (802-12.01) | EACH | 360 | $10.00 | $10.00 | $11.05 | $11.00 | $10.69 | $13.92 |
| 266 | Acer rubrum (red maple seedlng B.R.) (802-12.02) | EACH | 156 | $10.00 | $10.00 | $11.05 | $10.96 | $10.69 | $11.13 |
| 267 | Betula nigra (river birch seedlng B.R.) (802-12.07) | EACH | 280 | $10.00 | $10.00 | $11.05 | $11.00 | $10.69 | $13.92 |
| 268 | Diospyros virginiana (persimmon seedlng B.R.) (802-12.14) | EACH | 360 | $10.00 | $10.00 | $11.05 | $11.00 | $10.69 | $13.92 |
| 269 | Fraxinus pennsylvanica (green ash seedlng B.R.) (802-12.16) | EACH | 201 | $10.00 | $10.00 | $11.05 | $11.00 | $10.69 | $11.13 |
| 270 | Juglans nigra (black walnut seedlng B.R.) (802-12.17) | EACH | 85 | $10.00 | $10.00 | $11.05 | $11.00 | $10.69 | $13.92 |
| 271 | Liquidamber styraciflua (sweetgum seedlng B.R.) (802-12.18) | EACH | 419 | $10.00 | $10.00 | $11.05 | $11.00 | $10.69 | $11.13 |
| 272 | Liriodendron tulipifera (tulip poplar seedlng B.R.) (802-12.19) | EACH | 85 | $10.00 | $10.00 | $11.05 | $11.00 | $10.69 | $13.92 |
| 273 | Nyssa sylvatica (blckgum seedlng B.R.) (802-12.21) | EACH | 184 | $10.00 | $10.00 | $11.05 | $11.00 | $10.69 | $11.13 |
| 274 | Platanus occidentalis (sycamore seedlng B.R.) (802-12.26) | EACH | 280 | $10.00 | $10.00 | $11.05 | $11.00 | $10.69 | $13.92 |
| 275 | Populus deltoides (cottonwood seedlng B.R.) (802-12.27) | EACH | 5 | $10.00 | $10.00 | $11.05 | $11.00 | $10.68 | $11.13 |
| 276 | Quercus phellos (willow oak seedlng B.R.) (802-12.38) | EACH | 360 | $10.00 | $10.00 | $11.05 | $11.00 | $10.69 | $13.92 |
| 277 | Salix nigra (black willow seedlng B.R.) (802-12.40) | EACH | 5 | $10.00 | $10.00 | $11.05 | $11.00 | $10.68 | $11.13 |
| 278 | Ulmus americana (american elm seedlng B.R.) (802-12.44) | EACH | 140 | $10.00 | $10.00 | $11.05 | $11.00 | $10.69 | $11.13 |
| 279 | Carpinus caroliniana (american hornbeam seedling B.R.) (802-12.45) | EACH | 175 | $10.00 | $10.00 | $11.05 | $11.00 | $10.69 | $13.92 |
| 280 | Cornus amomum (silky dogwood SDLNG bare root) (802-13.54) | EACH | 95 | $10.00 | $10.00 | $11.05 | $11.00 | $10.69 | $13.92 |
| 281 | Hamamelis virginiana (witch hazel SDLNG bare root) (802-13.55) | EACH | 80 | $10.00 | $10.00 | $11.05 | $11.00 | $10.69 | $13.92 |
| 282 | Lindera benzoin (spicebush SDLNG bare root) (802-13.59) | EACH | 95 | $10.00 | $10.00 | $11.05 | $11.00 | $10.69 | $13.92 |
| 283 | Celtis laevigata (sugarberry seedling B.R.) (802-13.76) | EACH | 40 | $10.00 | $10.00 | $11.05 | $11.00 | $10.69 | $11.13 |
| 284 | Sodding (new sod) (803-01) | SY | 33,000 | $5.98 | $5.70 | $6.30 | $6.40 | $6.09 | $6.35 |
| 285 | Turf reinforcement mat (class I) (805-01.01) | SY | 31,650 | $4.10 | $3.90 | $4.31 | $4.40 | $4.17 | $4.34 |
| 286 | Erosion control blanket (type I) (805-12.01) | SY | 347,360 | $1.00 | $0.95 | $1.05 | $1.10 | $1.02 | $1.06 |
| 287 | Erosion control blanket (type II) (805-12.02) | SY | 13,100 | $0.44 | $0.95 | $1.05 | $1.10 | $1.02 | $1.06 |
| 288 | 700 gram coir fiber erosion blanket (805-12.08) | SY | 3,100 | $5.51 | $3.75 | $4.14 | $4.20 | $4.01 | $10.94 |
| 289 | Project mowing (806-02.03) | CYCL | 8 | $5,071.31 | $6,000.00 | $8,288.29 | $7,715.00 | $6,411.40 | $8,905.82 |
| 290 | Mineral aggregate, type A base, grading D (303-01) | TON | 272,800 | $29.29 | $25.00 | $26.71 | $29.00 | $29.25 | $30.12 |
| 291 | Bituminous material for prime coat (PC) (402-01) | TON | 375 | $1,350.00 | $1,000.00 | $1,491.89 | $1,460.00 | $1,350.00 | $1,502.86 |
| 292 | Aggregate for cover material (PC) (402-02) | TON | 1,331 | $45.00 | $50.00 | $49.73 | $49.00 | $45.00 | $50.10 |
| 293 | Class A concrete (box bridges) (604-02.01) | CY | 3,158 | $795.00 | $800.00 | $878.56 | $1,300.00 | $1,175.42 | $1,040.98 |
| 294 | Steel bar reinforcement (box bridges) (604-02.02) | LB | 546,674 | $1.67 | $1.25 | $1.85 | $1.50 | $1.82 | $1.08 |
| 295 | Dry excavation (bridges) (204-02.01) | CY | 690 | $30.00 | $45.00 | $33.15 | $13.00 | $32.06 | $38.52 |
| 296 | Core drilling and sampling (204-05.01) | LF | 1,021 | $62.50 | $115.00 | $69.07 | $148.00 | $66.79 | $226.42 |
| 297 | Core drilling for piles(rock) (204-14) | LF | 410 | $130.00 | $125.00 | $143.66 | $168.00 | $138.91 | $125.02 |
| 298 | Core drilling for piles(soil) (204-15) | LF | 3,334 | $130.00 | $125.00 | $143.66 | $148.00 | $138.91 | $125.02 |
| 299 | Granular backfill (bridges) (303-01.02) | TON | 286 | $70.00 | $65.00 | $77.36 | $58.00 | $74.80 | $44.90 |
| 300 | Epoxy coated reinforcing steel (604-02.03) | LB | 274,707 | $1.80 | $1.50 | $1.99 | $1.70 | $1.92 | $1.39 |
| 301 | Class A concrete (bridges) (604-03.01) | CY | 905 | $1,250.00 | $1,200.00 | $1,381.38 | $1,600.00 | $1,335.71 | $1,353.06 |
| 302 | Steel bar reinforcement (bridges) (604-03.02) | LB | 135,995 | $1.70 | $1.25 | $1.88 | $1.40 | $1.82 | $1.11 |
| 303 | Pavement @ bridge ends (604-03.04) | SY | 940 | $405.00 | $400.00 | $447.57 | $214.00 | $432.77 | $440.78 |
| 304 | Class DS concrete (604-03.32) | CY | 1,173 | $1,300.00 | $1,200.00 | $1,436.64 | $1,180.00 | $1,389.14 | $756.85 |
| 305 | Applied texture finish (new structures) (604-04.01) | SY | 10,879 | $18.00 | $9.25 | $19.89 | $19.00 | $19.23 | $10.51 |
| 306 | Three star state emblem (604-04.41) | EACH | 8 | $2,250.00 | $2,000.00 | $2,486.49 | $1,249.00 | $2,404.27 | $2,469.17 |
| 307 | Bridge deck grooving (mechanical) (604-05.31) | SY | 4,290 | $5.50 | $12.00 | $6.08 | $4.60 | $5.88 | $4.87 |
| 308 | Steel piles (10 inch) (606-02.03) | LF | 3,808 | $70.00 | $60.00 | $77.36 | $67.00 | $74.80 | $76.12 |
| 309 | Pile tips (steel piles, 10 inch) (606-02.06) | EACH | 82 | $120.00 | $125.00 | $132.61 | $56.00 | $128.23 | $212.33 |
| 310 | Prestressed concrete bulb tee beam (6" web)(BT-63) (615-01.11) | LF | 4,154 | $435.00 | $464.00 | $480.72 | $400.00 | $464.83 | $362.81 |
| 311 | Conc parapet single slope (STD-1-1SS) (620-05.01) | LF | 1,904 | $140.00 | $110.00 | $154.71 | $120.00 | $149.60 | $122.56 |
| 312 | Camera inspection - drilled shaft (dry) (625-01.10) | EACH | 18 | $4,000.00 | $1,500.00 | $4,420.42 | $1,620.00 | $4,274.26 | $834.92 |
| 313 | Drilled shaft-soil (5'-0" dia.) (625-02.01) | VF | 484 | $580.00 | $375.00 | $640.96 | $990.00 | $619.77 | $1,076.46 |
| 314 | Drilled shaft-rock (5'-0"/4'-6" dia.) (625-02.13) | VF | 182 | $1,500.00 | $1,210.00 | $1,657.66 | $1,500.00 | $1,602.85 | $1,574.69 |
| 315 | Drilled shaft casing-permanent (5'-0" I.D.) (625-02.25) | VF | 473 | $255.00 | $240.00 | $281.80 | $315.00 | $272.48 | $267.17 |
| 316 | Drilled shaft (SH-SCC) concrete (625-02.40) | CY | 440 | $400.00 | $215.00 | $442.04 | $282.00 | $427.43 | $248.10 |
| 317 | Drilled shaft reinforcing steel (625-02.44) | LB | 78,361 | $1.70 | $1.40 | $1.88 | $1.70 | $1.82 | $1.26 |
| 318 | 6" perforated pipe with vertical drain system (710-09.01) | LF | 570 | $40.00 | $60.00 | $44.20 | $68.00 | $42.74 | $72.76 |
| 319 | 6" pipe underdrain (710-09.02) | LF | 180 | $15.00 | $30.00 | $16.58 | $113.00 | $16.03 | $27.45 |
| 320 | Pole 35FT class 4 wood (790-02.03) | EACH | 4 | $912.00 | $1,085.00 | $1,223.51 | $1,118.00 | $984.38 | $1,015.26 |
| 321 | Pole 40FT class 2 metal (790-03.06) | EACH | 3 | $3,205.00 | $3,460.68 | $3,902.47 | $3,927.00 | $3,459.35 | $3,567.89 |
| 322 | Pole 45FT class 3 wood (790-04.03) | EACH | 7 | $1,120.00 | $1,401.92 | $1,580.89 | $1,372.00 | $1,208.88 | $1,246.81 |
| 323 | Pole 50FT class 1 wood (790-05.01) | EACH | 4 | $1,485.00 | $1,805.08 | $2,035.51 | $1,820.00 | $1,602.85 | $1,653.14 |
| 324 | Pole 50FT class 1 metal (790-05.05) | EACH | 17 | $4,415.00 | $4,838.48 | $5,456.15 | $5,410.00 | $4,765.37 | $4,914.90 |
| 325 | Pole 55FT class 1 wood (790-06.01) | EACH | 3 | $1,675.00 | $2,023.80 | $2,282.16 | $2,052.00 | $1,807.93 | $1,864.66 |
| 326 | Pole 55 FT class 1 metal (790-06.05) | EACH | 7 | $5,055.00 | $5,524.68 | $6,229.95 | $6,194.00 | $5,456.16 | $5,627.36 |
| 327 | Pole 60FT class 1 wood (790-07.01) | EACH | 1 | $1,895.00 | $2,352.32 | $2,652.62 | $2,322.00 | $2,045.39 | $2,109.56 |
| 328 | Pole 60FT class H2 metal (790-07.08) | EACH | 8 | $7,270.00 | $7,407.60 | $8,353.24 | $8,908.00 | $7,846.94 | $8,093.16 |
| 329 | Pole 70FT class 1 wood (790-09.01) | EACH | 2 | $3,595.00 | $4,162.40 | $4,727.60 | $4,405.00 | $3,880.30 | $4,002.06 |
| 330 | Pole 70FT class H2 metal (790-09.05) | EACH | 4 | $9,665.00 | $9,969.20 | $11,242 | $11,840 | $10,432 | $10,759 |
| 331 | Pole 75FT class 1 wood (790-10.01) | EACH | 2 | $4,035.00 | $5,147.12 | $5,804.20 | $4,944.00 | $4,355.22 | $4,491.88 |
| 332 | Pole 80FT class H2 metal (790-11.05) | EACH | 1 | $11,050 | $12,205 | $13,763 | $13,540 | $11,927 | $12,301 |
| 333 | Pole 85FT class H2 metal (790-12.05) | EACH | 1 | $11,800 | $13,162 | $14,842 | $14,460 | $12,736 | $13,136 |
| 334 | Field pole modifiction (790-20.31) | EACH | 3 | $1,025.00 | $300.00 | $338.30 | $1,256.00 | $1,106.34 | $1,141.06 |
| 335 | 1PH DBL primary support 25KV (790-22.02) | EACH | 7 | $955.00 | $819.64 | $924.27 | $1,170.00 | $1,030.79 | $1,063.13 |
| 336 | 1PH dde angle 25KV (790-22.11) | EACH | 1 | $706.00 | $492.56 | $555.44 | $865.00 | $762.03 | $785.94 |
| 337 | 1PH dead end 25KV (790-22.13) | EACH | 3 | $640.00 | $376.44 | $424.50 | $784.00 | $690.79 | $712.47 |
| 338 | 1PH dead end tap 25KV (790-22.14) | EACH | 3 | $674.00 | $440.08 | $49.71 | $826.00 | $727.49 | $750.32 |
| 339 | 1PH dead end tap W/ extension 25KV (790-22.15) | EACH | 4 | $706.00 | $492.56 | $555.44 | $865.00 | $762.03 | $785.94 |
| 340 | 1PH dde tangent 25KV (790-22.16) | EACH | 3 | $936.00 | $796.08 | $897.71 | $1,147.00 | $1,010.28 | $1,041.98 |
| 341 | 3PH crossarm SGL LRG cond on ST pole 25KV (790-26.04) | EACH | 23 | $1,120.00 | $967.04 | $1,090.49 | $1,372.00 | $1,208.88 | $1,246.81 |
| 342 | 3PH vertical tangent 25KV (790-26.10) | EACH | 1 | $1,470.00 | $1,653.52 | $1,864.62 | $1,801.00 | $1,586.66 | $1,636.45 |
| 343 | 3PH xarm DBL 10FT LRG cond SM angle 25KV (790-26.15) | EACH | 5 | $2,085.00 | $2,013.68 | $2,270.74 | $2,555.00 | $2,250.46 | $2,321.08 |
| 344 | 3PH vertical angle LRG cond 25KV (790-26.20) | EACH | 3 | $1,355.00 | $1,616.36 | $1,822.70 | $1,660.00 | $1,462.53 | $1,508.42 |
| 345 | 3PH vertical dde angle 25KV (790-26.21) | EACH | 3 | $1,565.00 | $1,996.32 | $2,251.16 | $1,918.00 | $1,689.20 | $1,742.20 |
| 346 | 3PH vertical dead end LRG cond 25KV (790-26.24) | EACH | 1 | $969.00 | $1,428.56 | $1,610.92 | $1,187.00 | $1,045.90 | $1,078.72 |
| 347 | 3PH crossarm dead end 25KV (790-26.26) | EACH | 12 | $1,330.00 | $1,412.00 | $1,592.25 | $1,630.00 | $1,435.55 | $1,480.59 |
| 348 | 3PH crossarm 10FT FBRGLS X-arm dde 25KV (790-26.32) | EACH | 8 | $2,465.00 | $2,690.68 | $3,034.17 | $3,020.00 | $2,660.62 | $2,744.11 |
| 349 | Secondary assemblies small angle (790-30.01) | EACH | 11 | $438.00 | $153.36 | $172.94 | $537.00 | $472.76 | $487.59 |
| 350 | Secondary assemblies LRG angle (790-30.02) | EACH | 34 | $418.00 | $143.64 | $161.98 | $512.00 | $451.17 | $465.33 |
| 351 | Secondary assemblies deadend (790-30.03) | EACH | 80 | $455.00 | $189.60 | $213.80 | $558.00 | $491.11 | $506.52 |
| 352 | Secondary conductor 2 AL triplex (790-30.13) | LF | 826 | $2.90 | $4.72 | $5.32 | $3.60 | $3.13 | $3.23 |
| 353 | Down guy - through bolt type (790-32.01) | EACH | 115 | $347.00 | $305.96 | $345.02 | $425.00 | $374.54 | $386.29 |
| 354 | Down guy - insulated (790-32.06) | EACH | 15 | $437.00 | $309.80 | $349.35 | $535.00 | $471.68 | $486.48 |
| 355 | OH guy - through bolt type (790-32.07) | EACH | 10 | $603.00 | $469.52 | $529.46 | $739.00 | $650.85 | $671.28 |
| 356 | Guy guard (790-32.23) | EACH | 169 | $31.50 | $13.80 | $15.56 | $37.00 | $34.00 | $35.07 |
| 357 | Rock anchor expanding type (790-33.17) | EACH | 1 | $665.00 | $578.40 | $652.23 | $815.00 | $717.77 | $740.30 |
| 358 | Anchor triple eye power installed (790-33.20) | EACH | 81 | $660.00 | $601.60 | $678.40 | $809.00 | $712.38 | $734.73 |
| 359 | Transfer service (790-36.04) | EACH | 9 | $554.00 | $140.60 | $158.55 | $679.00 | $597.96 | $616.73 |
| 360 | Transfer street light (790-36.13) | EACH | 30 | $291.00 | $234.80 | $264.77 | $357.00 | $314.09 | $323.95 |
| 361 | Transfer conductor (790-36.14) | EACH | 54 | $624.00 | $160.20 | $180.65 | $765.00 | $673.52 | $694.65 |
| 362 | Transfer framing/associated apparatus (790-36.15) | EACH | 1 | $746.00 | $432.00 | $487.15 | $914.00 | $805.20 | $830.47 |
| 363 | OH cond 1/0 6/1 acsr raven (790-40.03) | LF | 2,157 | $2.00 | $2.44 | $2.75 | $2.50 | $2.16 | $2.23 |
| 364 | OH cond 3/0 6/1 acsr pigeon (790-40.05) | LF | 12,090 | $2.20 | $3.12 | $3.52 | $2.70 | $2.37 | $2.45 |
| 365 | OH cond 336.4 18/1 acsr merlin (790-40.09) | LF | 20,016 | $3.10 | $4.42 | $4.98 | $3.80 | $3.35 | $3.45 |
| 366 | OH cond 2 6/1 sparrow (790-40.91) | LF | 5,791 | $1.80 | $2.27 | $2.56 | $2.20 | $1.94 | $2.00 |
| 367 | UG sec cond 2/0 AL TPLX (790-41.47) | LF | 150 | $3.00 | $4.95 | $5.58 | $3.70 | $3.24 | $3.34 |
| 368 | Secondary riser W/ 2IN conduit (790-43.50) | EACH | 6 | $845.00 | $980.60 | $1,105.78 | $1,035.00 | $912.06 | $940.68 |
| 369 | 2PH XFMR BNK pole MTD W/ fuse/arresters (790-47.02) | EACH | 1 | $1,660.00 | $2,392.60 | $2,698.04 | $2,034.00 | $1,791.74 | $1,847.96 |
| 370 | 1PH fuse cutout xarm mount 25KV (790-61.01) | EACH | 23 | $850.00 | $500.24 | $564.10 | $1,042.00 | $917.46 | $946.24 |
| 371 | Lightning arrester arm MTD 18 KV (790-65.05) | EACH | 2 | $757.00 | $417.44 | $470.73 | $928.00 | $817.07 | $842.72 |
| 372 | SGL phase mounting bracket - fiberglass (790-68.13) | EACH | 4 | $619.00 | $205.56 | $231.80 | $757.00 | $668.12 | $689.09 |
| 373 | Hardware for SGL PH conv trans (790-69.06) | EACH | 18 | $635.00 | $421.80 | $475.65 | $778.00 | $685.39 | $706.90 |
| 374 | Ground-ground rod (790-69.08) | EACH | 16 | $682.00 | $318.20 | $358.82 | $836.00 | $736.12 | $759.22 |
| 375 | Ground-ground rod for ST pole (790-69.11) | EACH | 46 | $507.00 | $221.80 | $250.11 | $575.00 | $547.24 | $564.41 |
| 376 | Pole top pin (790-69.22) | EACH | 1 | $450.00 | $242.56 | $273.53 | $551.00 | $485.71 | $500.96 |
| 377 | Pole top pin for ST pole (790-69.30) | EACH | 3 | $450.00 | $242.56 | $273.53 | $551.00 | $485.71 | $500.95 |
| 378 | Arm pin (790-69.32) | EACH | 17 | $573.00 | $115.32 | $130.04 | $702.00 | $618.47 | $637.88 |
| 379 | Extension link - epoxy -8FT (790-69.41) | EACH | 75 | $438.00 | $151.92 | $171.31 | $537.00 | $472.76 | $487.59 |
| 380 | Street light (166W LED, 4000K, T2 rdwy) (790-70.20) | EACH | 1 | $1,430.00 | $1,390.80 | $1,568.34 | $1,752.00 | $1,543.48 | $1,591.92 |
| 381 | 288 fiber(material only) (790-74.13) | LF | 2,657 | $2.90 | $5.24 | $5.91 | $3.40 | $3.13 | $3.23 |
| 382 | 288-432 fiber(installation only) (790-74.22) | LF | 2,657 | $1.40 | $2.25 | $2.54 | $1.70 | $1.51 | $1.56 |
| 383 | Fiber tangent assembly (790-74.31) | EACH | 3 | $740.00 | $324.45 | $365.87 | $872.00 | $798.73 | $823.79 |
| 384 | Fiber double deadend assembly (790-74.33) | EACH | 8 | $822.00 | $512.95 | $578.43 | $968.00 | $887.23 | $915.07 |
| 385 | Fiber storage single loop (790-74.34) | EACH | 4 | $857.00 | $492.20 | $555.03 | $1,010.00 | $925.01 | $954.04 |
| 386 | Remove wire (790-98.01) | LF | 40,997 | $0.80 | $1.95 | $2.20 | $1.00 | $0.86 | $0.89 |
| 387 | Remove poles (790-98.02) | EACH | 60 | $385.00 | $550.00 | $620.21 | $472.00 | $415.55 | $428.59 |
| 388 | Remove framing/associated apparatus (790-98.03) | EACH | 581 | $244.00 | $300.00 | $338.30 | $299.00 | $263.36 | $271.63 |
| 389 | Remove fiber optic cable (790-98.04) | LF | 1,792 | $0.80 | $1.95 | $2.20 | $1.00 | $0.86 | $0.89 |
| 390 | 6IN steel gas main (791-01.05) | LF | 4,790 | $175.00 | $147.00 | $130.00 | $160.00 | $141.03 | $144.72 |
| 391 | 12IN steel gas main (791-01.08) | LF | 1,110 | $210.00 | $284.00 | $380.00 | $310.00 | $412.24 | $423.03 |
| 392 | 2IN HDPE gas main (791-03.02) | LF | 448 | $65.00 | $96.00 | $50.00 | $105.00 | $54.24 | $55.66 |
| 393 | 4IN HDPE gas main (791-03.04) | LF | 4,476 | $92.00 | $102.00 | $63.00 | $111.00 | $68.34 | $70.13 |
| 394 | HDD 2IN PE pipe - unconsolidated (791-04.02) | LF | 134 | $220.00 | $102.00 | $160.00 | $111.00 | $173.57 | $178.12 |
| 395 | HDD 4IN PE pipe - unconsolidated (791-04.04) | LF | 70 | $220.00 | $157.00 | $185.00 | $171.00 | $200.70 | $205.95 |
| 396 | HDD 8IN PE pipe - unconsolidated (791-04.06) | LF | 265 | $280.00 | $223.00 | $530.00 | $243.00 | $574.96 | $590.01 |
| 397 | Connect to 2IN EX. PE main (791-06.02) | EACH | 3 | $1,250.00 | $4,000.00 | $1,300.00 | $4,364.00 | $1,410.29 | $1,447.20 |
| 398 | Connect to 4IN EX. PE main (791-06.03) | EACH | 4 | $1,600.00 | $5,912.00 | $2,000.00 | $6,450.00 | $2,169.68 | $2,226.46 |
| 399 | Connect to 2IN EX. STL main (791-06.10) | EACH | 1 | $2,200.00 | $3,465.00 | $3,250.00 | $3,780.00 | $3,525.73 | $3,617.99 |
| 400 | Connect to 12IN EX. STL main (791-06.14) | EACH | 1 | $36,000 | $13,275 | $6,000.00 | $14,482 | $6,509.03 | $6,679.36 |
| 401 | Connect to 6IN EX. STL main W/ stopple (791-06.33) | EACH | 7 | $36,000 | $24,858 | $25,000 | $27,117 | $27,121 | $27,831 |
| 402 | Connect to 12IN EX. STL main W/ stopple (791-06.35) | EACH | 1 | $65,000 | $65,526 | $75,000 | $71,483 | $81,363 | $83,492 |
| 403 | 2IN PE hot tap connection (791-06.51) | EACH | 1 | $12,500 | $3,372.50 | $13,500 | $3,679.00 | $14,645 | $15,029 |
| 404 | 4IN PE gas valve assembly (791-07.02) | EACH | 8 | $2,250.00 | $3,700.00 | $3,250.00 | $4,037.00 | $3,525.73 | $3,617.99 |
| 405 | 6IN steel gas valve assembly (791-07.11) | EACH | 7 | $3,200.00 | $9,890.00 | $7,500.00 | $10,790 | $8,136.29 | $8,349.20 |
| 406 | Steel gas fittings (791-07.19) | LB | 3,033 | $25.00 | $1.00 | $0.25 | $1.10 | $0.27 | $0.28 |
| 407 | PE gas fittings (791-07.40) | LB | 151 | $30.00 | $1.00 | $0.25 | $1.10 | $0.27 | $0.28 |
| 408 | Retire in place 2IN serv cut & plug (791-10.04) | EACH | 6 | $1,200.00 | $3,660.00 | $1,750.00 | $3,993.00 | $1,898.47 | $1,948.15 |
| 409 | Retire in place 4IN serv cut & plug (791-10.05) | EACH | 3 | $1,400.00 | $5,500.00 | $1,750.00 | $6,000.00 | $1,898.47 | $1,948.15 |
| 410 | Retire in place 6IN serv cut & plug (791-10.06) | EACH | 7 | $1,600.00 | $6,700.00 | $3,000.00 | $7,310.00 | $3,254.52 | $3,339.68 |
| 411 | Retire in place 12IN serv cut & plug (791-10.08) | EACH | 1 | $4,800.00 | $13,600 | $6,500.00 | $14,836 | $7,051.44 | $7,235.98 |
| 412 | Locator wire pull box-concrete box W/cast iron frame & lid (791-15.80) | EACH | 8 | $1,200.00 | $2,628.00 | $1,500.00 | $2,867.00 | $1,627.26 | $1,669.84 |
| 413 | Locator wire (tracer wire) (791-15.81) | LF | 4,924 | $1.00 | $1.35 | $0.75 | $1.50 | $0.81 | $0.83 |
| 414 | Anchor 1IN (793-01.41) | EACH | 30 | $1,180.00 | $1,180.00 | $1,339.52 | $1,390.00 | $1,273.64 | $1,313.61 |
| 415 | Composite handhole 5FTX3FTX3FT (793-11.17) | EACH | 3 | $8,825.00 | $8,825.00 | $7,590.62 | $10,395 | $9,525.35 | $9,824.23 |
| 416 | 4IN schedule 40 PVC (793-13.07) | LF | 4,096 | $9.70 | $9.70 | $13.40 | $11.00 | $10.47 | $10.80 |
| 417 | 2 duct formation @ 36IN depth (793-13.17) | LF | 647 | $31.00 | $31.00 | $78.14 | $37.00 | $33.46 | $34.51 |
| 418 | 3 duct formation @ 36IN depth (793-13.22) | LF | 934 | $43.00 | $43.00 | $89.30 | $51.00 | $46.41 | $47.87 |
| 419 | 4IN SCH 80 orange flexpipe (793-14.19) | LF | 1,298 | $4.50 | $4.50 | $20.09 | $5.30 | $4.86 | $5.01 |
| 420 | Directional bore 4IN/flex sleeve (793-16.04) | LF | 1,298 | $18.00 | $18.00 | $145.11 | $21.00 | $19.43 | $20.04 |
| 421 | Remove poles all sizes (793-98.04) | EACH | 10 | $779.00 | $779.00 | $558.13 | $918.00 | $840.82 | $867.20 |
| 422 | Retire buried facilities in place (793-98.05) | LF | 338 | $2.00 | $2.00 | $5.58 | $2.40 | $2.16 | $2.23 |
| 423 | 6IN dip slip joint water line (795-01.04) | LF | 138 | $144.00 | $150.00 | $210.00 | $131.00 | $227.82 | $130.48 |
| 424 | 16IN dip slip joint water line (795-01.14) | LF | 1,129 | $167.00 | $174.00 | $210.00 | $199.00 | $227.82 | $196.87 |
| 425 | 6IN C900 PVC water line (795-03.34) | LF | 77 | $52.00 | $55.00 | $100.00 | $96.00 | $108.48 | $105.26 |
| 426 | 8IN C900 PVC water line (795-03.35) | LF | 8,412 | $56.00 | $59.00 | $100.00 | $81.00 | $108.48 | $85.26 |
| 427 | 12IN C900 PVC water line (795-03.37) | LF | 1,503 | $106.00 | $111.00 | $150.00 | $123.00 | $162.73 | $129.57 |
| 428 | HDD 2IN HDPE carrier pipe-uncon (795-05.01) | LF | 154 | $67.00 | $69.50 | $160.00 | $51.00 | $173.57 | $170.20 |
| 429 | Bore/jack 16IN steel casing pipe-uncon. (795-05.65) | LF | 103 | $545.00 | $570.00 | $820.00 | $622.00 | $889.57 | $705.14 |
| 430 | Bore/jack 24IN steel casing pipe-uncon. (795-05.68) | LF | 107 | $675.00 | $705.00 | $820.00 | $950.00 | $889.57 | $940.28 |
| 431 | Connect to 6IN water line (795-06.04) | EACH | 7 | $2,960.00 | $3,090.00 | $3,000.00 | $4,207.00 | $3,254.52 | $2,325.24 |
| 432 | Connect to 8IN water line (795-06.05) | EACH | 2 | $3,250.00 | $3,390.00 | $3,000.00 | $9,293.00 | $3,254.52 | $2,450.67 |
| 433 | Connect to 10IN water line (795-06.06) | EACH | 3 | $3,665.00 | $3,825.00 | $3,000.00 | $7,687.00 | $3,254.52 | $3,067.28 |
| 434 | Connect to 12IN water line (795-06.07) | EACH | 6 | $3,965.00 | $4,140.00 | $3,000.00 | $7,034.00 | $3,254.52 | $3,369.18 |
| 435 | Cut and cap 6IN water line (795-06.33) | EACH | 6 | $2,555.00 | $2,665.00 | $1,600.00 | $855.00 | $1,735.74 | $6,400.38 |
| 436 | Cut and cap 8IN water line (795-06.34) | EACH | 2 | $2,675.00 | $2,790.00 | $1,700.00 | $464.00 | $1,844.23 | $5,597.65 |
| 437 | Cut & cap 10IN water line (795-06.36) | EACH | 1 | $2,790.00 | $2,910.00 | $1,750.00 | $767.00 | $1,898.47 | $5,334.58 |
| 438 | Cut and cap 12IN water line (795-06.37) | EACH | 6 | $2,880.00 | $3,005.00 | $1,750.00 | $1,008.00 | $1,898.47 | $6,516.45 |
| 439 | 6IN X 6IN tapping sleeve and valve (795-07.03) | EACH | 6 | $5,600.00 | $5,845.00 | $6,500.00 | $6,113.00 | $7,051.45 | $8,750.68 |
| 440 | 8IN X 8IN tapping sleeve and valve (795-07.06) | EACH | 2 | $7,055.00 | $7,365.00 | $8,500.00 | $6,770.00 | $9,221.13 | $11,803 |
| 441 | 10IN X 8IN tapping sleeve and valve (795-07.09) | EACH | 1 | $7,210.00 | $7,525.00 | $8,750.00 | $7,380.00 | $9,492.34 | $12,204 |
| 442 | 12IN X 12IN tapping sleeve and valve (795-07.15) | EACH | 6 | $10,875 | $11,350 | $13,000 | $10,129 | $14,103 | $16,501 |
| 443 | 6IN gate valve assembly (795-08.04) | EACH | 7 | $2,325.00 | $2,425.00 | $3,000.00 | $3,156.00 | $3,254.52 | $3,871.31 |
| 444 | 8IN gate valve assembly (795-08.05) | EACH | 5 | $3,240.00 | $3,380.00 | $4,250.00 | $4,236.00 | $4,610.56 | $4,943.43 |
| 445 | 12IN gate valve assembly (795-08.09) | EACH | 1 | $5,605.00 | $5,850.00 | $7,500.00 | $6,405.00 | $8,136.28 | $7,967.12 |
| 446 | 3/4IN water service meter assembly (795-09.01) | EACH | 20 | $3,500.00 | $3,700.00 | $1,700.00 | $3,057.00 | $1,844.23 | $3,905.74 |
| 447 | 2IN water service meter assembly (795-09.04) | EACH | 1 | $6,700.00 | $7,100.00 | $6,000.00 | $5,788.00 | $6,509.03 | $13,927 |
| 448 | 3/4IN pexa service pipe (795-09.60) | LF | 400 | $15.00 | $16.50 | $20.00 | $30.00 | $21.70 | $55.91 |
| 449 | 1IN pex service pipe (795-09.62) | LF | 1,930 | $15.00 | $16.50 | $20.00 | $39.00 | $21.70 | $52.48 |
| 450 | 2IN pexa service pipe (795-09.64) | LF | 20 | $20.00 | $22.00 | $165.00 | $81.00 | $179.00 | $87.58 |
| 451 | 2IN auto air release valve assembly (795-10.05) | EACH | 6 | $6,855.00 | $7,155.00 | $8,000.00 | $5,811.00 | $8,678.71 | $7,165.46 |
| 452 | Fire hydrant assembly (795-11.02) | EACH | 17 | $10,825 | $11,295 | $13,500 | $10,794 | $14,645 | $11,301 |
| 453 | Locator wire pull box-concrete box W/cast iron frame & lid (795-12.40) | EACH | 7 | $675.00 | $705.00 | $650.00 | $1,782.00 | $705.15 | $1,729.07 |
| 454 | DI fittings (795-13.01) | LB | 7,065 | $21.00 | $22.00 | $22.00 | $23.00 | $23.87 | $26.10 |
| 455 | 24IN steel casing pipe open cut method (795-15.07) | LF | 460 | $475.00 | $495.00 | $560.00 | $238.00 | $607.51 | $305.62 |
| 456 | 16IN steel casing pipe open cut method (795-15.25) | LF | 621 | $380.00 | $398.00 | $340.00 | $197.00 | $368.85 | $240.15 |
| 457 | 32IN steel casing pipe open cut method (795-15.26) | LF | 298 | $648.00 | $675.00 | $665.00 | $377.00 | $721.42 | $420.68 |
| 458 | 2IN HDPE casing open cut (795-30.08) | LF | 1,352 | $42.50 | $44.50 | $55.00 | $31.00 | $59.67 | $40.81 |
| 459 | Open cut 16IN PVC casing pipe (795-30.25) | LF | 346 | $500.00 | $522.00 | $330.00 | $192.00 | $358.00 | $375.20 |
| 460 | 4IN PVC force main (797-03.06) | LF | 3,295 | $25.00 | $26.00 | $47.00 | $45.00 | $50.99 | $54.98 |
| 461 | 8IN PVC force main (797-03.07) | LF | 2,778 | $39.00 | $41.00 | $75.00 | $97.00 | $81.36 | $93.41 |
| 462 | 6IN PVC force main (797-03.08) | LF | 852 | $33.00 | $35.00 | $70.00 | $71.00 | $75.94 | $77.43 |
| 463 | 8IN dip gravity sewer 6FT-12FT depth (797-05.02) | LF | 345 | $166.00 | $174.00 | $290.00 | $303.00 | $314.60 | $295.81 |
| 464 | 12IN dip gravity sewer 6FT-12FT depth (797-05.10) | LF | 24 | $365.00 | $381.00 | $345.00 | $230.00 | $374.27 | $582.30 |
| 465 | 24IN dip gravity sewer 6FT-12FT depth (797-05.22) | LF | 292 | $459.00 | $480.00 | $565.00 | $408.00 | $612.93 | $435.21 |
| 466 | __in dip gravity sewer 6FT-12FT depth (797-05.30) | LF | 206 | $737.00 | $769.00 | $1,000.00 | $728.00 | $1,084.84 | $625.85 |
| 467 | Open cut 16IN steel casing pipe (797-06.90) | LF | 1,220 | $451.00 | $471.00 | $440.00 | $185.00 | $477.33 | $195.87 |
| 468 | Open cut 48IN steel casing pipe (797-06.96) | LF | 185 | $620.00 | $647.00 | $615.00 | $697.00 | $667.18 | $520.64 |
| 469 | 48IN manhole 8FT-10FT depth (797-07.04) | EACH | 1 | $7,240.00 | $7,555.00 | $8,000.00 | $5,370.00 | $8,678.71 | $9,355.14 |
| 470 | 48IN manhole 10FT-12FT depth (797-07.05) | EACH | 1 | $9,045.00 | $9,440.00 | $35,500 | $6,318.00 | $38,512 | $21,311 |
| 471 | 60IN manhole 6FT-8FT depth (797-07.14) | EACH | 2 | $16,810 | $17,540 | $9,250.00 | $5,405.00 | $10,035 | $33,078 |
| 472 | 72IN manhole 6FT-8FT depth (797-07.25) | EACH | 1 | $15,470 | $16,145 | $11,000 | $8,923.00 | $11,933 | $23,670 |
| 473 | PVC fittings (797-08.02) | LB | 317 | $91.00 | $95.00 | $1.00 | $206.00 | $1.08 | $45.31 |
| 474 | 6IN PVC pipe for service lateral (797-08.05) | LF | 293 | $73.00 | $76.00 | $105.00 | $74.00 | $113.91 | $100.79 |
| 475 | 4IN plug valve assembly (797-09.06) | EACH | 3 | $3,315.00 | $3,455.00 | $4,000.00 | $3,450.00 | $4,339.35 | $5,935.96 |
| 476 | 6IN plug valve assembly (797-09.07) | EACH | 3 | $5,525.00 | $5,765.00 | $7,000.00 | $5,410.00 | $7,593.87 | $7,915.82 |
| 477 | 8IN plug valve assembly (797-09.08) | EACH | 2 | $8,685.00 | $9,065.00 | $7,250.00 | $5,648.00 | $7,865.08 | $8,356.40 |
| 478 | 2IN combo air release valve assembly (797-09.20) | EACH | 4 | $13,985 | $14,595 | $17,500 | $10,580 | $18,985 | $13,746 |
| 479 | Cut and cap 4IN force main (797-09.43) | EACH | 2 | $2,860.00 | $2,980.00 | $2,250.00 | $2,880.00 | $2,440.89 | $5,589.37 |
| 480 | Cut and cap 6IN force main (797-09.46) | EACH | 7 | $880.00 | $920.00 | $2,500.00 | $2,200.00 | $2,712.10 | $6,235.10 |
| 481 | Cut and cap 8IN force main (797-09.47) | EACH | 2 | $3,335.00 | $3,480.00 | $3,000.00 | $2,690.00 | $3,254.52 | $10,303 |
| 482 | Connect 8IN sewer to exist. manhole (797-10.02) | EACH | 1 | $4,490.00 | $4,685.00 | $5,000.00 | $3,044.00 | $5,424.19 | $5,824.76 |
| 483 | Connect 10-18IN sewer to exist. manhole (797-10.03) | EACH | 1 | $4,815.00 | $5,020.00 | $5,500.00 | $5,529.00 | $5,966.61 | $5,824.76 |
| 484 | Connect to existing pump station (797-10.12) | EACH | 2 | $4,550.00 | $4,745.00 | $4,500.00 | $5,529.00 | $4,881.78 | $16,122 |
| 485 | Connect to 4IN force main (797-10.16) | EACH | 2 | $3,495.00 | $3,650.00 | $3,750.00 | $5,884.00 | $4,068.14 | $4,482.60 |
| 486 | Connect to 6IN force main (797-10.17) | EACH | 7 | $4,000.00 | $4,175.00 | $4,000.00 | $7,454.00 | $4,339.35 | $4,622.86 |
| 487 | Locator wire pull box-concrete box W/cast iron frame & lid (797-10.50) | EACH | 18 | $700.00 | $730.00 | $600.00 | $1,063.00 | $650.90 | $1,866.28 |
| 488 | Locator wire (tracer wire) (797-10.51) | LF | 6,925 | $0.25 | $0.30 | $0.30 | $1.30 | $0.33 | $2.21 |
| 489 | TV inspection (797-11.39) | LF | 867 | $2.50 | $3.50 | $6.00 | $8.30 | $6.51 | $8.35 |
| 490 | Fiber optic cable enclosure (798-05.02) | EACH | 25 | $1,565.00 | $1,565.00 | $2,776.58 | $1,844.00 | $1,689.20 | $1,650.28 |
| 491 | Fiber optic cable splice (798-05.03) | EACH | 231 | $180.00 | $180.00 | $73.77 | $212.00 | $194.28 | $200.38 |
| 492 | 3/8IN ehs steel strand (798-05.06) | LF | 8,416 | $3.20 | $3.20 | $5.29 | $3.80 | $3.45 | $3.56 |
| 493 | Communication assembly (tap) (798-05.26) | EACH | 5 | $885.00 | $885.00 | $337.06 | $1,042.40 | $955.23 | $985.21 |
| 494 | Communication assembly (bond) (798-05.27) | EACH | 12 | $830.00 | $830.00 | $84.26 | $978.00 | $895.87 | $923.98 |
| 495 | Communication assembly (CSC) (798-05.29) | EACH | 11 | $808.00 | $808.00 | $480.72 | $952.00 | $872.12 | $899.49 |
| 496 | Communication assembly (dde) (798-05.32) | EACH | 17 | $758.00 | $758.00 | $624.38 | $893.00 | $818.15 | $843.83 |
| 497 | Communication assembly (DE) (798-05.33) | EACH | 14 | $740.00 | $740.00 | $312.19 | $872.00 | $798.73 | $823.79 |
| 498 | Communication assembly (E1-2) (798-05.34) | EACH | 44 | $975.00 | $975.00 | $252.79 | $1,148.00 | $1,052.38 | $1,085.40 |
| 499 | Communication assembly (E2-2) (798-05.35) | EACH | 7 | $1,040.00 | $1,040.00 | $457.24 | $1,225.00 | $1,122.53 | $1,157.76 |
| 500 | Communication assembly (F2&F3) (798-05.37) | EACH | 1 | $956.00 | $956.00 | $1,179.70 | $1,126.00 | $1,031.87 | $1,064.25 |
| 501 | Communication assembly (loop) (798-05.52) | EACH | 23 | $870.00 | $870.00 | $337.06 | $1,025.00 | $939.04 | $968.51 |
| 502 | Communication assembly (SVC) (798-05.54) | EACH | 11 | $847.00 | $847.00 | $156.10 | $998.00 | $914.22 | $942.90 |
| 503 | Fiber optic cable (4F) (798-06.02) | LF | 1,477 | $2.80 | $2.80 | $3.13 | $3.30 | $3.02 | $3.12 |
| 504 | Fiber optic cable (12F) (798-06.04) | LF | 3,109 | $3.20 | $3.20 | $3.13 | $3.80 | $3.45 | $3.56 |
| 505 | Fiber optic cable (144F) (798-06.20) | LF | 7,896 | $4.50 | $4.50 | $5.78 | $5.30 | $4.86 | $5.01 |
| 506 | Riser (798-08.01) | EACH | 3 | $1,630.00 | $1,630.00 | $288.71 | $1,920.00 | $1,759.36 | $1,814.56 |
| 507 | Transfer fiberoptic cable (798-08.06) | EACH | 1 | $690.00 | $690.00 | $355.02 | $813.00 | $744.75 | $768.13 |
| 508 | Remove steel strand (798-09.01) | LF | 8,047 | $2.30 | $2.30 | $2.15 | $2.70 | $2.48 | $2.56 |
| 509 | Remove aerial cable/terminals (798-09.02) | LF | 11,320 | $2.10 | $2.10 | $2.15 | $2.50 | $2.27 | $2.34 |
| 510 | Remove poles, guys, anchors (798-09.03) | EACH | 40 | $470.00 | $470.00 | $359.16 | $554.00 | $507.30 | $523.22 |
| 511 | Remove riser (798-09.06) | EACH | 5 | $290.00 | $290.00 | $71.83 | $342.00 | $313.02 | $322.84 |
| 512 | Remove strand pole framing (798-09.08) | EACH | 129 | $368.00 | $368.00 | $71.83 | $433.00 | $397.20 | $409.67 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of August 15, 2025. Compiled by Mirage Metrics.