Bell & Associates Construction, LLC: TDOT bid record
Bell & Associates Construction, LLC submitted 50 bids on Tennessee DOT contracts in the data, from 15 MAY 2020 to 02 OCT 2026, and was the low bidder on 10 of them (20%). When it was not low, its total sat a median +23% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $112,148,250
- Latest bid
- 02 OCT 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 3 | 1 | 33% |
| 2023 | 2 | 0 | 0% |
| 2024 | 16 | 5 | 31% |
| 2025 | 17 | 3 | 18% |
| 2026 | 12 | 1 | 8% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Shelby County | 8 | 2 | 25% |
| Davidson County | 5 | 3 | 60% |
| Coffee County | 3 | 0 | 0% |
| Humphreys County | 3 | 0 | 0% |
| Sumner County | 2 | 1 | 50% |
| Fayette County | 2 | 0 | 0% |
| Maury County | 2 | 0 | 0% |
| Perry County | 2 | 0 | 0% |
| Rutherford County | 2 | 1 | 50% |
| Cumberland County | 2 | 0 | 0% |
| Franklin County | 1 | 0 | 0% |
| Hamilton County | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trainee | 109-10.01 | HR | 15 | 15 (100%) | $0.80 | $0.80 |
| Warning lights (type A) | 712-05.01 | EACH | 36 | 14 (39%) | $23.50 | $24.00 |
| Guardrail removed | 706-01 | LF | 24 | 13 (54%) | $2.25 | $2.12 |
| Steel bar reinforcement (bridges) | 604-03.02 | LB | 24 | 12 (50%) | $1.39 | $1.63 |
| Changeable message sign unit | 713-16.01 | EACH | 40 | 11 (28%) | $6,923.34 | $6,095.00 |
| High-visibility construction fence | 707-08.11 | LF | 30 | 11 (37%) | $2.75 | $3.30 |
| Conc parapet single slope (STD-1-1SS) | 620-05.01 | LF | 20 | 11 (55%) | $121.28 | $140.28 |
| Class DS concrete | 604-03.32 | CY | 11 | 10 (91%) | $1,100.00 | $1,250.00 |
| Signs (construction) | 712-06 | SF | 48 | 9 (19%) | $8.50 | $8.00 |
| Sediment removal | 209-05 | CY | 33 | 9 (27%) | $30.00 | $31.36 |
| Temporary work zone crash cushion (MASH TL-3) | 712-02.60 | EACH | 31 | 9 (29%) | $8,222.02 | $8,800.00 |
| Water (seeding & sodding) | 801-03 | MG | 30 | 9 (30%) | $73.50 | $100.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Jones Bros. Contractors, LLC | 17 | 9 of 17 |
| Dement Construction Company, LLC | 15 | 7 of 15 |
| Mid-State Construction Company, Inc. | 15 | 8 of 15 |
| Dement Construction Group, LLC | 15 | 11 of 15 |
| Capital City Construction Services, LLC | 7 | 4 of 7 |
| Thomson & Thomson, Inc. | 6 | 4 of 6 |
| Southern Constructors, Inc. | 6 | 2 of 6 |
| Jamison Construction, LLC | 6 | 4 of 6 |
| MasTec Civil, LLC | 5 | 2 of 5 |
| Ford Construction Company | 4 | 4 of 4 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 02 OCT 2026 | CN263065 | Humphreys County | The construction of a concrete bulb-tee beam bridge on cedar grove road over hurricane creek (l.m. 0.49), including grading, drainage, and p | 2 of 6 | $4,742,358 | +11% |
| 14 AUG 2026 | CN262059 | Coffee County | The repair of the bridges on s.r. 127 over bradley creek at l.m. 6.21 and l.m. 9.76, including grading, drainage, and paving | 5 of 5 | $7,247,661 | +41% |
| 14 AUG 2026 | CN264054 | Shelby County | The construction of a concrete box beam bridge on s.r. 205 over overflow (l.m. 2.34) and a concrete bulb-tee beam bridge on s.r. 205 over th | 2 of 2 | $18,110,402 | +8.0% |
| 26 JUN 2026 | CN264044 | Hardin County | The repair of the bridge on u.s. 641 (s.r. 114) over the tennessee river (l.m. 3.22) | 2 of 8 | $1,596,225 | +6.0% |
| 26 JUN 2026 | CN263058 | Hickman County | The repair of the bridges on i-40 over garners creek (l.m. 1.53) | 4 of 4 | $949,092 | +111% |
| 26 JUN 2026 | CN263055 | Williamson County | The grading, drainage, construction of concrete box beam bridges, retaining wall, and paving on u.s. 31 (s.r. 6, east main street) over the | 1 of 5 | $11,957,571 | Low, 0.0% under the second |
| 08 MAY 2026 | CN262041 | Cumberland County | The repair of the bridges on i-40 (l&r) over the abandoned southern railway and main street (l.m. 23.92) | 3 of 5 | $756,384 | +26% |
| 08 MAY 2026 | CN261040 | Knox County | The repair of the bridge on i-275 over oldham avenue (l.m. 1.02) | 4 of 5 | $1,388,904 | +38% |
| 20 MAR 2026 | CN264031 | Shelby County | The construction of a concrete bulb-tee beam bridge on u.s. 51 (s.r. 3, thomas street) over overflow (l.m. 15.69), including grading, draina | 3 of 3 | $8,094,869 | +10% |
| 20 MAR 2026 | CN264026 | Shelby County | The repair of bridges on i-40 (eb and wb) over chester street (l.m. 29.74) | 5 of 6 | $2,269,442 | +45% |
| 06 FEB 2026 | CN264004 | Haywood County | The construction of a concrete bulb-tee beam bridge on s.r. 180 over lost creek (l.m. 4.75) and a concrete box beam bridge over overflow (l. | 3 of 3 | $3,564,548 | +56% |
| 06 FEB 2026 | CN261005 | Loudon County | The repair of the bridges on u.s. 321 (s.r. 73) over tellico lake and s.r. 444 (l.m. 8.72) | 2 of 5 | $5,500,751 | +8.0% |
| 05 DEC 2025 | CNZ290 | Cumberland County | The widening and repair of the bridges on i-40 over u.s. 70n (s.r. 24) (l.m. 0.24), including grading, drainage, and paving | 2 of 4 | $16,161,241 | +1.0% |
| 05 DEC 2025 | CNZ307 | Gibson County | The construction of a concrete box beam bridge on salem street over roe creek (l.m. 0.68), including grading, drainage, and paving | 5 of 5 | $2,524,989 | +55% |
| 03 OCT 2025 | CNZ274 | Davidson County | The bridge repairs on the i-40 exit 221 ramp over i-40 (l.m. 29.02) and on s.r. 45 (old hickory boulevard) over i-40 (l.m. 17.92) in hermita | 2 of 2 | $3,797,649 | +9.0% |
| 03 OCT 2025 | CNZ250 | Jackson County | The construction of a precast concrete box bridge on s.r. 53 near l.m. 17.56 | 3 of 7 | $3,083,540 | +12% |
| 03 OCT 2025 | CNZ111 | Putnam County | The grading, drainage, construction of a concrete box beam bridge, and paving on a s.i.a. route serving project sim (portobello america, inc | 4 of 7 | $4,868,439 | +22% |
| 03 OCT 2025 | CNZ266 | Trousdale County | The repair of the bridge on s.r. 141 over little goose creek (l.m. 4.82) | 1 of 4 | $1,344,692 | Low, 6.0% under the second |
| 03 OCT 2025 | CNZ272 | Shelby County | The repair of the bridge on i-240 over i-40, i-240 nb, u.s. 70 (s.r. 1), and ramps (l.m. 19.65) | 1 of 3 | $1,792,966 | Low, 0.0% under the second |
| 15 AUG 2025 | CNZ209 | Davidson County | The noise wall repair along the i-440 eb on ramp (exit 3) | 2 of 2 | $399,570 | +61% |
| 15 AUG 2025 | CNZ227 | Fayette County | The repair of bridges on i-269 over s.r. 57 (l.m. 1.23) | 2 of 2 | $2,633,669 | +9.0% |
| 15 AUG 2025 | CNZ221 | Sumner County | The grading, drainage, bridges, signals, and paving on s.r. 109 (portland bypass) from s.r. 52 west of portland to existing s.r. 109 north o | 6 of 6 | $112,115,669 | +26% |
| 27 JUN 2025 | CNZ192 | Humphreys County | The interchange modifications on i-40 at s.r. 13, including grading, drainage, lighting, and paving (l.m. 7.64 to l.m. 8.64) | 2 of 3 | $5,891,802 | +14% |
| 27 JUN 2025 | CNZ178 | Roane County | The construction of a concrete bulb-tee beam bridge on u.s. 27 (s.r. 29) over u.s. 27 (s.r. 29)/s.r. 61 (l.m. 12.10), including grading, dra | 2 of 7 | $4,482,066 | 0.0% |
| 27 JUN 2025 | CNZ193 | Rutherford County | The interchange improvement on i-24 at medical center parkway (l.m. 12.74 - l.m. 13.34), including grading, drainage, paving with portland c | 3 of 4 | $7,056,523 | +7.0% |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.