TDOT contract CN264026 bid tabulation
The repair of bridges on i-40 (eb and wb) over chester street (l.m. 29.74). Let by Tennessee DOT on March 20, 2026, Shelby County. 6 bids received; low bid $1,564,375 by Thomson & Thomson, Inc..
- Owner
- Tennessee DOT
- Letting
- 20 MAR 2026
- Pay items
- 43
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Thomson & Thomson, Inc. | $1,564,375 | Low |
| 2 | Ford Construction Company | $1,596,107 | +2.0% |
| 3 | Dement Construction Group, LLC | $1,640,289 | +5.0% |
| 4 | Jamison Construction, LLC | $1,841,070 | +18% |
| 5 | Bell & Associates Construction, LLC | $2,269,442 | +45% |
| 6 | Key, LLC DBA Key, LLC of MS | $3,206,599 | +105% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Thomson & Thomson, Inc. | 2. Ford Construction Company | 3. Dement Construction Group, LLC | 4. Jamison Construction, LLC | 5. Bell & Associates Construction, LLC | 6. Key, LLC DBA Key, LLC of MS |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Vegetation removal (201-05.31) | LS | 1 | $3,500.00 | $15,000 | $20,000 | $12,000 | $39,000 | $12,000 |
| 2 | Filter sock (12 inch) (209-03.21) | LF | 1,250 | $7.00 | $4.20 | $4.00 | $6.00 | $7.00 | $30.00 |
| 3 | Sediment removal (209-05) | CY | 20 | $125.00 | $50.00 | $1.00 | $25.00 | $10.00 | $91.00 |
| 4 | Asphalt concrete mix (PG76-22) (BPMB-HM) grading B-M2 (307-03.08) | TON | 199 | $705.00 | $820.00 | $716.50 | $788.00 | $837.00 | $415.00 |
| 5 | Bituminous material for tack coat (TC) (403-01) | TON | 3 | $2,450.00 | $1,000.00 | $1,375.00 | $1,500.00 | $1,607.00 | $1,185.00 |
| 6 | Acs mix(PG76-22) grading D (411-03.10) | TON | 252 | $478.00 | $570.00 | $611.75 | $685.00 | $715.00 | $379.00 |
| 7 | Scoring shoulders (continuous) (16IN width) (411-12.01) | LM | 0.40 | $46,800 | $25,000 | $22,790 | $25,525 | $5,845.00 | $20,000 |
| 8 | Cold planing bituminous pavement (415-01.02) | SY | 3,297 | $21.30 | $22.00 | $14.00 | $16.00 | $16.00 | $35.00 |
| 9 | Epoxy coated reinforcing steel (604-02.03) | LB | 6,252 | $3.50 | $3.50 | $3.50 | $3.00 | $5.00 | $7.40 |
| 10 | Class X concrete (604-03.74) | CY | 16 | $3,860.00 | $4,300.00 | $3,000.00 | $5,400.00 | $10,064 | $1,100.00 |
| 11 | Applied texture finish (existing structures) (604-04.02) | SY | 692 | $16.99 | $18.00 | $15.50 | $18.00 | $20.00 | $62.00 |
| 12 | Concrete (604-10.05) | SF | 40 | $750.00 | $700.00 | $405.00 | $400.00 | $1,000.00 | $2,500.00 |
| 13 | Remove existing wearing surface (604-10.14) | LS | 1 | $23,900 | $25,000 | $90,000 | $50,000 | $110,300 | $68,000 |
| 14 | Bridge deck repairs (full depth of slab) (604-10.30) | SY | 95 | $1,150.00 | $1,200.00 | $725.00 | $1,800.00 | $1,500.00 | $2,490.00 |
| 15 | Bridge deck repairs (partial depth of slab) (604-10.50) | SY | 126 | $1,075.00 | $750.00 | $485.00 | $500.00 | $1,200.00 | $1,200.00 |
| 16 | Concrete repairs (604-10.54) | SF | 92 | $350.00 | $270.00 | $325.00 | $400.00 | $1,000.00 | $1,565.00 |
| 17 | Bridge deck sealant (617-01) | SY | 840 | $40.00 | $55.00 | $40.00 | $42.00 | $58.00 | $78.00 |
| 18 | High-visibility construction fence (707-08.11) | LF | 900 | $4.00 | $2.50 | $2.25 | $5.00 | $7.50 | $6.00 |
| 19 | Machined rip-rap (class A-3) (709-05.05) | TON | 300 | $50.00 | $95.00 | $45.00 | $95.00 | $100.00 | $152.00 |
| 20 | Machined rip-rap (class A-1) (709-05.06) | TON | 32 | $80.00 | $95.00 | $100.00 | $120.00 | $250.00 | $203.00 |
| 21 | Traffic control (712-01) | LS | 1 | $40,000 | $170,000 | $275,000 | $170,000 | $297,000 | $855,000 |
| 22 | Interconnected portable barrier rail (712-02.02) | LF | 1,580 | $50.00 | $35.00 | $40.00 | $70.00 | $30.00 | $95.00 |
| 23 | Remove and relocate portable barrier rail (712-02.36) | LF | 860 | $50.00 | $55.00 | $40.00 | $15.00 | $30.00 | $95.00 |
| 24 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 4 | $7,500.00 | $7,245.00 | $6,900.00 | $9,000.00 | $8,067.00 | $19,520 |
| 25 | Flexible drums (channelizing) (712-04.01) | EACH | 335 | $42.00 | $44.00 | $42.00 | $46.00 | $49.00 | $42.00 |
| 26 | Barrier rail delineator (712-04.50) | EACH | 86 | $10.00 | $10.50 | $10.00 | $15.00 | $12.00 | $12.00 |
| 27 | Warning lights (type A) (712-05.01) | EACH | 4 | $20.00 | $21.00 | $20.00 | $24.00 | $23.00 | $20.00 |
| 28 | Warning lights (type C) (712-05.03) | EACH | 50 | $20.00 | $21.00 | $20.00 | $24.00 | $23.00 | $18.00 |
| 29 | Signs (construction) (712-06) | SF | 1,291 | $6.00 | $6.30 | $6.00 | $8.00 | $7.00 | $7.00 |
| 30 | Temporary barricades (type III) (712-07.03) | LF | 50 | $13.50 | $14.00 | $13.50 | $20.00 | $15.50 | $24.00 |
| 31 | Arrow board (type C) (712-08.03) | EACH | 4 | $900.00 | $945.00 | $900.00 | $1,100.00 | $1,052.00 | $1,775.00 |
| 32 | Queue protection truck (712-08.12) | DAY | 25 | $1,200.00 | $1,260.00 | $1,200.00 | $1,350.00 | $1,402.00 | $1,300.00 |
| 33 | Portable queue warning system (712-08.14) | DAY | 25 | $1,200.00 | $1,260.00 | $1,200.00 | $1,350.00 | $1,402.00 | $1,300.00 |
| 34 | Removable pavement marking (6" line) (712-09.08) | LF | 27,620 | $6.00 | $3.00 | $6.00 | $6.00 | $3.50 | $7.10 |
| 35 | Changeable message sign unit (713-16.01) | EACH | 2 | $5,000.00 | $5,500.00 | $5,000.00 | $5,500.00 | $5,846.00 | $5,100.00 |
| 36 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 12 | $200.00 | $210.00 | $200.00 | $220.00 | $234.00 | $237.00 |
| 37 | Removal of snowplowable reflective marker (716-01.30) | EACH | 12 | $45.00 | $60.00 | $15.00 | $25.00 | $48.00 | $237.00 |
| 38 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 0.50 | $25,000 | $26,250 | $25,000 | $27,500 | $29,228 | $29,600 |
| 39 | Mobilization (717-01) | LS | 1 | $209,000 | $195,000 | $162,762 | $242,500 | $317,594 | $301,000 |
| 40 | Geotextile (type III)(erosion control) (740-10.03) | SY | 515 | $3.50 | $6.00 | $1.00 | $6.00 | $3.50 | $7.00 |
| 41 | Temporary sediment tube 12IN (740-11.02) | LF | 4,700 | $6.00 | $2.00 | $3.50 | $5.50 | $5.50 | $24.00 |
| 42 | Seeding (with mulch) (801-01) | UNIT | 17 | $75.00 | $50.00 | $50.00 | $110.00 | $80.00 | $769.00 |
| 43 | Water (seeding & sodding) (801-03) | MG | 2 | $75.00 | $250.00 | $250.00 | $100.00 | $500.00 | $77.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of March 20, 2026. Compiled by Mirage Metrics.