Jamison Construction, LLC: TDOT bid record
Jamison Construction, LLC submitted 22 bids on Tennessee DOT contracts in the data, from 09 FEB 2018 to 02 OCT 2026, and was the low bidder on 7 of them (32%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $4,922,693
- Latest bid
- 02 OCT 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 3 | 1 | 33% |
| 2020 | 4 | 1 | 25% |
| 2024 | 3 | 2 | 67% |
| 2025 | 6 | 2 | 33% |
| 2026 | 6 | 1 | 17% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Greene County | 2 | 1 | 50% |
| Maury | 2 | 1 | 50% |
| Putnam County | 1 | 0 | 0% |
| Clay County | 1 | 1 | 100% |
| Cumberland County | 1 | 1 | 100% |
| Roane County | 1 | 0 | 0% |
| Morgan County | 1 | 1 | 100% |
| Sullivan County | 1 | 0 | 0% |
| Trousdale County | 1 | 0 | 0% |
| Shelby County | 1 | 0 | 0% |
| Knox County | 1 | 1 | 100% |
| Hardin County | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Concrete | 604-10.05 | SF | 15 | 7 (47%) | $300.00 | $425.00 |
| Concrete repairs | 604-10.54 | SF | 15 | 5 (33%) | $300.00 | $400.00 |
| Machined rip-rap (class A-1) | 709-05.06 | TON | 7 | 5 (71%) | $78.00 | $70.00 |
| Removable pavement marking line | 712-09.01 | LF | 6 | 5 (83%) | $2.25 | $3.75 |
| Arrow board (type C) | 712-08.03 | EACH | 12 | 4 (33%) | $1,150.00 | $1,170.00 |
| Interconnected portable barrier rail | 712-02.02 | LF | 12 | 4 (33%) | $40.00 | $50.00 |
| Sediment removal | 209-05 | CY | 9 | 4 (44%) | $50.00 | $31.36 |
| Flexible drums (channelizing) | 712-04.01 | EACH | 21 | 3 (14%) | $40.00 | $34.50 |
| Guardrail removed | 706-01 | LF | 7 | 3 (43%) | $2.00 | $2.12 |
| Portable barrier rail (MASH TL-3) | 712-02.10 | LF | 6 | 3 (50%) | $57.50 | $67.75 |
| Applied texture finish (existing structures) | 604-04.02 | SY | 13 | 2 (15%) | $18.00 | $16.00 |
| Temporary work zone crash cushion (MASH TL-3) | 712-02.60 | EACH | 12 | 2 (17%) | $8,650.00 | $8,800.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Mid-State Construction Company, Inc. | 16 | 3 of 16 |
| Southern Constructors, Inc. | 11 | 5 of 11 |
| Jones Bros. Contractors, LLC | 6 | 1 of 6 |
| Bell & Associates Construction, LLC | 6 | 2 of 6 |
| Thomson & Thomson, Inc. | 5 | 4 of 5 |
| Southern Road & Bridge, LLC | 5 | 0 of 5 |
| Twin K Construction, Inc. | 3 | 1 of 3 |
| Louis-Company, LLC | 3 | 2 of 3 |
| Dement Construction Group, LLC | 3 | 1 of 3 |
| Adams Contracting, LLC | 2 | 1 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 02 OCT 2026 | CN263064 | Bedford County | The construction of a concrete box bridge on old highway 64 over stokes branch (l.m. 0.11), including grading, drainage, and paving | 5 of 6 | $1,127,955 | +13% |
| 14 AUG 2026 | CN262060 | Meigs County | The repair of the bridge on s.r. 60 over the tennessee river (l.m. 3.10) | 2 of 5 | $6,856,029 | +3.0% |
| 26 JUN 2026 | CN264044 | Hardin County | The repair of the bridge on u.s. 641 (s.r. 114) over the tennessee river (l.m. 3.22) | 5 of 8 | $1,624,524 | +8.0% |
| 26 JUN 2026 | CN263058 | Hickman County | The repair of the bridges on i-40 over garners creek (l.m. 1.53) | 3 of 4 | $887,929 | +98% |
| 08 MAY 2026 | CN261040 | Knox County | The repair of the bridge on i-275 over oldham avenue (l.m. 1.02) | 1 of 5 | $1,010,095 | Low, 1.0% under the second |
| 20 MAR 2026 | CN264026 | Shelby County | The repair of bridges on i-40 (eb and wb) over chester street (l.m. 29.74) | 4 of 6 | $1,841,070 | +18% |
| 03 OCT 2025 | CNZ261 | Morgan County | The repair of the bridge on s.r. 62 over little clear creek (l.m. 13.77) | 1 of 4 | $1,673,335 | Low, 9.0% under the second |
| 03 OCT 2025 | CNZ260 | Sullivan County | The repair of the bridge on westfield drive over i-26 (l.m. 0.05) | 2 of 3 | $1,655,088 | +12% |
| 03 OCT 2025 | CNZ266 | Trousdale County | The repair of the bridge on s.r. 141 over little goose creek (l.m. 4.82) | 2 of 4 | $1,421,665 | +6.0% |
| 27 JUN 2025 | CNZ191 | Greene County | The repair of the bridges on u.s. 11e (s.r. 34) over snapps ferry road and nfs railway (l.m. 17.25) | 5 of 5 | $1,944,845 | +28% |
| 27 JUN 2025 | CNZ180 | Roane County | The repair of the bridge on lawnville road over i-40 (l.m. 1.70) | 2 of 3 | $432,118 | +25% |
| 07 FEB 2025 | CNZ125 | Greene County | The repair of the bridge on s.r. 351 over the nolichucky river (l.m. 16.17) | 1 of 4 | $689,371 | Low, 19% under the second |
| 21 JUN 2024 | CNY179 | Clay County | The repair of the bridge on s.r. 52 over the cumberland river (l.m. 19.32) | 1 of 3 | $332,040 | Low, 60% under the second |
| 21 JUN 2024 | CNY062 | Cumberland County | The repair of the bridge on s.r. 299 over i-40 (l.m. 2.79) | 1 of 4 | $676,952 | Low, 12% under the second |
| 10 MAY 2024 | CNY903 | Putnam County | The construction of a concrete slab bridge on s.r. 135 at l.m. 13.57 | 3 of 6 | $533,664 | +3.0% |
| 26 JUN 2020 | CNU049 | Maury | The repair of bridges on i-65 over rutherford creek (l.m. 16.48) and on s.r. 396 over i-65 (i-65 l.m. 17.63) | 2 of 5 | $728,394 | 0.0% |
| 26 JUN 2020 | CNU247 | Shelby | The repair of the ramp c bridge over s.r. 14 (l.m. 20.23) | 2 of 4 | $75,148 | +2.0% |
| 26 JUN 2020 | CNU266 | Wilson | The repair of the bridges on i-40 over spring creek (l.m. 18.61) | 1 of 4 | $253,964 | Low, 88% under the second |
| 15 MAY 2020 | CNU161 | Madison | The repair of the bridges on i-40 over u.s. 412 (s.r. 20) (l.m. 12.01) in jackson | 3 of 3 | $239,672 | +21% |
| 23 MAR 2018 | CNS159 | Roane | The repair of the bridge on warrior drive over i-40 (l.m. 1.20) in harriman | 2 of 7 | $635,888 | +4.0% |
| 09 FEB 2018 | CNS028 | Maury | The repair of the bridge on s.r 247 over leipers creek (l.m. 1.05) | 1 of 3 | $286,937 | Low, 4.0% under the second |
| 09 FEB 2018 | CNS049 | Monroe | The repair of the bridge on raby road over i-75 (l.m. 2.79) | 3 of 5 | $974,473 | +15% |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.