Southern Constructors, Inc.: TDOT bid record
Southern Constructors, Inc. submitted 65 bids on Tennessee DOT contracts in the data, from 09 FEB 2018 to 02 OCT 2026, and was the low bidder on 22 of them (34%). When it was not low, its total sat a median +29% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $54,626,526
- Latest bid
- 02 OCT 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 5 | 2 | 40% |
| 2020 | 4 | 0 | 0% |
| 2023 | 3 | 1 | 33% |
| 2024 | 20 | 8 | 40% |
| 2025 | 18 | 7 | 39% |
| 2026 | 15 | 4 | 27% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Knox County | 4 | 0 | 0% |
| Jefferson County | 3 | 2 | 67% |
| Loudon County | 3 | 1 | 33% |
| Anderson County | 3 | 0 | 0% |
| Roane County | 3 | 1 | 33% |
| Hawkins County | 3 | 2 | 67% |
| Putnam County | 2 | 0 | 0% |
| Cumberland County | 2 | 0 | 0% |
| Campbell County | 2 | 1 | 50% |
| Grainger County | 2 | 2 | 100% |
| Hamilton County | 2 | 0 | 0% |
| Greene County | 2 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Bituminous material for tack coat (TC) | 403-01 | TON | 37 | 13 (35%) | $1,250.00 | $969.62 |
| Mineral aggregate, type A base, grading D | 303-01 | TON | 25 | 11 (44%) | $65.00 | $45.00 |
| Class A concrete (pipe endwalls) | 611-07.01 | CY | 14 | 11 (79%) | $2,500.00 | $2,291.67 |
| Interconnected portable barrier rail | 712-02.02 | LF | 23 | 10 (43%) | $50.00 | $50.00 |
| Brooming & degrassing shoulders | 208-01.05 | LM | 14 | 10 (71%) | $2,100.00 | $1,500.00 |
| Mineral aggregate (size 57) | 303-10.01 | TON | 22 | 9 (41%) | $77.50 | $65.00 |
| Enhanced flatline thermo PVMT MRKNG (6IN line) | 716-12.02 | LM | 36 | 8 (22%) | $12,000 | $7,425.00 |
| Concrete | 604-10.05 | SF | 25 | 8 (32%) | $375.00 | $425.00 |
| Concrete repairs | 604-10.54 | SF | 24 | 8 (33%) | $362.50 | $400.00 |
| Furnishing & spreading topsoil | 203-07 | CY | 19 | 8 (42%) | $80.00 | $65.00 |
| Acs mix(PG64-22) grading D | 411-01.10 | TON | 36 | 7 (19%) | $342.50 | $171.29 |
| Temporary work zone crash cushion (MASH TL-3) | 712-02.60 | EACH | 35 | 7 (20%) | $9,500.00 | $8,800.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Mid-State Construction Company, Inc. | 30 | 21 of 30 |
| Summers-Taylor, Inc. | 17 | 8 of 17 |
| Jones Bros. Contractors, LLC | 13 | 2 of 13 |
| Jamison Construction, LLC | 11 | 6 of 11 |
| Twin K Construction, Inc. | 8 | 4 of 8 |
| Charles Blalock & Sons, Inc. | 7 | 5 of 7 |
| Southern Road & Bridge, LLC | 7 | 0 of 7 |
| Whaley Construction, LLC | 7 | 5 of 7 |
| APAC-Atlantic, Inc. | 6 | 3 of 6 |
| Bell & Associates Construction, LLC | 6 | 4 of 6 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 02 OCT 2026 | CN261076 | Anderson County | The construction of a turn lane on s.r. 61 at the intersection of sinking springs road/lewallen hollow road (l.m. 17.55) in clinton, includi | 2 of 4 | $475,898 | +37% |
| 02 OCT 2026 | CN261070 | Carter County | The bridge rehabilitation on u.s. 19e (s.r. 37) under the bridges over laurel fork creek (l.m. 16.96), including slope repair near l.m. 17.1 | 3 of 3 | $3,206,327 | +61% |
| 02 OCT 2026 | CN261074 | Claiborne County | The construction of a concrete box beam bridge on s.r. 33 over south fork sycamore creek (l.m. 20.56), including grading, drainage, and pavi | 1 of 5 | $2,643,606 | Low, 13% under the second |
| 02 OCT 2026 | CN261079 | Hawkins County | The construction of a concrete bulb-tee beam bridge on afg road over southern railway (l.m. 0.45), including grading, drainage, and paving | 1 of 3 | $7,295,755 | Low, 6.0% under the second |
| 02 OCT 2026 | CN261073 | Knox County | The concrete pavement repair on i-75 from the i-40 eastbound exit ramp (l.m. 0.00) to the bridge over papermill drive (l.m. 0.30) | 4 of 4 | $1,087,527 | +29% |
| 14 AUG 2026 | CN261061 | Knox County | The intersection improvements on s.r. 131 (emory road) at harrell road/carpenter road (l.m. 9.5), including grading, drainage, signals, and | 3 of 4 | $9,401,602 | +19% |
| 26 JUN 2026 | CN261057 | Hawkins County | The grading, drainage, construction of bridges, signals, and paving on s.r. 31 near u.s. 11w (s.r. 1) in mooresburg (l.m. 0.100) to adams la | 4 of 4 | $21,799,199 | +34% |
| 26 JUN 2026 | CN261901 | Johnson County | The construction of a concrete box beam bridge on slimp branch road over roan creek (l.m. 0.34), including grading, drainage, and paving | 1 of 2 | $2,954,728 | Low, 15% under the second |
| 26 JUN 2026 | CN261902 | Roane County | The repair of the bridge on pansy hill drive over the emory river (l.m. 0.28) in harriman | 2 of 4 | $1,497,016 | +3.0% |
| 08 MAY 2026 | CN262041 | Cumberland County | The repair of the bridges on i-40 (l&r) over the abandoned southern railway and main street (l.m. 23.92) | 4 of 5 | $775,420 | +30% |
| 08 MAY 2026 | CN261039 | Knox County | The repair of the bridge on i-40/s.r. 158 (james white parkway) over norfolk southern railroad, willow avenue, and jackson avenue (l.m. 19.3 | 3 of 5 | $2,335,420 | +29% |
| 08 MAY 2026 | CN261040 | Knox County | The repair of the bridge on i-275 over oldham avenue (l.m. 1.02) | 2 of 5 | $1,020,034 | +1.0% |
| 20 MAR 2026 | CN261015 | Anderson County | The grading, drainage, construction of a concrete box bridge, and paving on a s.i.a. route from u.s. 441 (s.r. 71) to sawmill road, serving | 3 of 5 | $5,378,616 | +22% |
| 20 MAR 2026 | CN261026 | Sullivan County | The construction of a small drainage structure on s.r. 347 at l.m. 5.77 | 1 of 4 | $1,469,878 | Low, 18% under the second |
| 06 FEB 2026 | CN261005 | Loudon County | The repair of the bridges on u.s. 321 (s.r. 73) over tellico lake and s.r. 444 (l.m. 8.72) | 3 of 5 | $5,540,320 | +9.0% |
| 05 DEC 2025 | CNZ303 | Loudon County | The repair of the bridge on s.r. 95 over the clinch river/melton hill lake (l.m. 10.72) | 2 of 2 | $1,996,524 | +17% |
| 03 OCT 2025 | CNZ278 | Carter County | The construction of a concrete box bridge on gap creek road over gap creek (l.m. 2.73), including grading, drainage, and paving | 1 of 2 | $1,780,046 | Low, 21% under the second |
| 03 OCT 2025 | CNZ252 | Cocke County | The construction of a concrete box bridge on u.s. 25 (s.r. 9) over branch (l.m. 21.43), including grading, drainage, and paving | 3 of 3 | $3,479,237 | +65% |
| 03 OCT 2025 | CNZ261 | Morgan County | The repair of the bridge on s.r. 62 over little clear creek (l.m. 13.77) | 3 of 4 | $2,260,852 | +35% |
| 03 OCT 2025 | CNZ260 | Sullivan County | The repair of the bridge on westfield drive over i-26 (l.m. 0.05) | 1 of 3 | $1,480,105 | Low, 12% under the second |
| 15 AUG 2025 | CNZ903 | Unicoi County | The construction of a concrete box beam or welded plate girder bridge on s.r. 107 (unicoi drive) over north indian creek (l.m. 5.22) in erwi | 2 of 2 | $8,631,874 | +8.0% |
| 15 AUG 2025 | CNZ225 | Counties Anderson, Cocke, Jefferson, Knox, And Sevier | The ada curb ramp upgrades on various state routes | 1 of 2 | $1,727,720 | Low, 60% under the second |
| 15 AUG 2025 | CNZ224 | Counties Blount, Loudon, Monroe, And Scott | The ada curb ramp upgrades on various state routes | 2 of 3 | $1,116,827 | +1.0% |
| 15 AUG 2025 | CNZ210 | Claiborne County | The installation of traffic signals and miscellaneous safety improvements on s.r. 63 at the intersection of harrogate crossing/hamilton way | 1 of 1 | $1,346,415 | Low |
| 15 AUG 2025 | CNZ213 | Hawkins County | The construction of a concrete box beam bridge on s.r. 70 over the norfolk southern railroad (l.m. 6.19), including grading, drainage, retai | 1 of 2 | $9,392,609 | Low, 20% under the second |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.