TDOT contract CNZ903 bid tabulation
The construction of a concrete box beam or welded plate girder bridge on s.r. 107 (unicoi drive) over north indian creek (l.m. 5.22) in erwin, including grading, drainage, and paving. Let by Tennessee DOT on August 15, 2025, Unicoi County. 2 bids received; low bid $7,979,553 by Summers-Taylor, Inc..
- Owner
- Tennessee DOT
- Letting
- 15 AUG 2025
- Pay items
- 248
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Summers-Taylor, Inc. | $7,979,553 | Low |
| 2 | Southern Constructors, Inc. | $8,631,874 | +8.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Summers-Taylor, Inc. | 2. Southern Constructors, Inc. |
|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $53,100 | $80,000 |
| 2 | Trainee (109-10.01) | HR | 1,180 | $0.80 | $0.80 |
| 3 | Clearing and grubbing (201-01) | LS | 1 | $75,000 | $90,000 |
| 4 | Removal of structures and obstructions (202-01.50) | EACH | 3 | $2,000.00 | $3,100.00 |
| 5 | Removal of pipe (12" ,sta. 216+08.31) (202-02.01) | LF | 41 | $147.00 | $190.00 |
| 6 | Removal of pipe (18" ,sta. 215+11.35) (202-02.02) | LF | 104 | $108.00 | $120.00 |
| 7 | Removal of pipe (18" ,sta. 214+26.31) (202-02.03) | LF | 60 | $100.00 | $140.00 |
| 8 | Removal of pipe (12" ,sta. 212+91.74) (202-02.04) | LF | 203 | $95.00 | $165.00 |
| 9 | Removal of pipe (15" ,sta. 212+67.83) (202-02.05) | LF | 140 | $104.00 | $165.00 |
| 10 | Removal of pipe (15",sta. 211+96.85) (202-02.06) | LF | 14 | $104.00 | $340.00 |
| 11 | Removal of asphalt pavement (202-03.01) | SY | 1,314 | $18.50 | $15.00 |
| 12 | Road & drainage excavation (unclassified) (203-01) | CY | 1,910 | $122.00 | $72.00 |
| 13 | Borrow excavation (graded solid rock) (203-02.01) | TON | 523 | $100.00 | $125.00 |
| 14 | Placing and spreading topsoil (203-04) | CY | 105 | $77.50 | $71.00 |
| 15 | Water (203-06) | MG | 22 | $119.00 | $300.00 |
| 16 | Furnishing & spreading topsoil (203-07) | CY | 46 | $105.00 | $130.00 |
| 17 | Construction of haul road (203-50) | LS | 1 | $305,000 | $150,000 |
| 18 | Backfill material (flowable fill) (204-08.01) | CY | 2 | $514.00 | $3,100.00 |
| 19 | Sediment removal (209-05) | CY | 67 | $40.00 | $60.00 |
| 20 | Temporary silt fence (with backing) (209-08.02) | LF | 582 | $11.00 | $12.00 |
| 21 | Temporary silt fence (without backing) (209-08.03) | LF | 514 | $3.00 | $7.00 |
| 22 | Rock check dam (209-08.07) | EACH | 4 | $826.00 | $1,300.00 |
| 23 | Enhanced rock check dam (209-08.08) | EACH | 6 | $1,550.00 | $2,000.00 |
| 24 | Sediment filter bag (15' X 15') (209-09.03) | EACH | 1 | $3,430.00 | $1,300.00 |
| 25 | Curb inlet protection (type 4) (209-09.43) | EACH | 13 | $370.00 | $1,100.00 |
| 26 | Catch basin protection (type A) (209-40.30) | EACH | 4 | $740.00 | $2,300.00 |
| 27 | Catch basin protection (type D) (209-40.33) | EACH | 1 | $342.00 | $700.00 |
| 28 | Temporary diversion channel (209-65.03) | LF | 122 | $132.00 | $2,700.00 |
| 29 | Mineral aggregate, type A base, grading D (303-01) | TON | 2,807 | $78.00 | $90.00 |
| 30 | Granular backfill (roadway) (303-01.01) | TON | 15 | $129.00 | $120.00 |
| 31 | Mineral aggregate (size 57) (303-10.01) | TON | 22 | $135.00 | $95.00 |
| 32 | Mineral aggregate (size ) (303-10.04) | TON | 532 | $115.00 | $110.00 |
| 33 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 512 | $235.00 | $260.00 |
| 34 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 452 | $295.00 | $330.00 |
| 35 | Bituminous material for prime coat (PC) (402-01) | TON | 5 | $1,500.00 | $1,650.00 |
| 36 | Bituminous material for tack coat (TC) (403-01) | TON | 2.50 | $1,350.00 | $1,500.00 |
| 37 | Acs mix (PG64-22) grading E shoulder (411-01.07) | TON | 24 | $482.00 | $550.00 |
| 38 | Acs mix(PG64-22) grading D (411-01.10) | TON | 278 | $335.00 | $390.00 |
| 39 | Cold planing bituminous pavement (415-01.01) | TON | 41 | $195.00 | $220.00 |
| 40 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 541 | $266.00 | $380.00 |
| 41 | 24" concrete pipe culvert (class III) (607-05.02) | LF | 54 | $337.00 | $560.00 |
| 42 | 30" concrete pipe culvert (class III) (607-06.02) | LF | 78 | $374.00 | $590.00 |
| 43 | Manholes, > 4' - 8' depth (611-01.02) | EACH | 1 | $9,500.00 | $7,600.00 |
| 44 | Class A concrete (pipe endwalls) (611-07.01) | CY | 2 | $3,640.00 | $2,600.00 |
| 45 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 93 | $2.85 | $8.00 |
| 46 | Catch basins, type 12, 0' - 4' depth (611-12.01) | EACH | 3 | $7,460.00 | $7,300.00 |
| 47 | Catch basins, type 12, > 4' - 8' depth (611-12.02) | EACH | 3 | $8,590.00 | $8,300.00 |
| 48 | Catch basins, type 14, > 4' - 8' depth (611-14.02) | EACH | 5 | $14,700 | $11,500 |
| 49 | Catch basins, type 25, 0' - 4' depth (611-25.01) | EACH | 1 | $9,220.00 | $11,200 |
| 50 | Catch basins, type 25, > 4' - 8' depth (611-25.02) | EACH | 1 | $9,640.00 | $16,000 |
| 51 | Catch basins, type 42, 0' - 4' depth (611-42.01) | EACH | 1 | $6,660.00 | $9,500.00 |
| 52 | Concrete median pavement (701-03) | CY | 27 | $822.00 | $950.00 |
| 53 | Concrete curb (702-01) | CY | 14 | $588.00 | $1,600.00 |
| 54 | Concrete combined curb & gutter (702-03) | CY | 46 | $611.00 | $1,750.00 |
| 55 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 113 | $34.50 | $35.00 |
| 56 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 1 | $1,730.00 | $1,800.00 |
| 57 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 3 | $4,040.00 | $4,000.00 |
| 58 | Thrie beam bridge transition MASH TL-3 (705-06.25) | EACH | 4 | $4,500.00 | $4,800.00 |
| 59 | Guardrail removed (706-01) | LF | 142 | $4.60 | $5.00 |
| 60 | Radius rail (706-06.03) | LF | 38 | $46.00 | $50.00 |
| 61 | Rounded end element (706-10.26) | EACH | 1 | $577.00 | $650.00 |
| 62 | Markers (concrete R.O.W. posts) (708-02.01) | EACH | 10 | $695.00 | $380.00 |
| 63 | Machined rip-rap (class A-3) (709-05.05) | TON | 50 | $139.00 | $145.00 |
| 64 | Machined rip-rap (class B) (709-05.08) | TON | 28 | $144.00 | $95.00 |
| 65 | Machined rip-rap (class C) (709-05.09) | TON | 1,335 | $92.00 | $110.00 |
| 66 | Traffic control (712-01) | LS | 1 | $95,000 | $100,000 |
| 67 | Portable barrier rail, reduced deflection (MASH TL-3) (712-02.12) | LF | 465 | $125.00 | $190.00 |
| 68 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 6 | $5,740.00 | $11,000 |
| 69 | Flexible drums (channelizing) (712-04.01) | EACH | 100 | $44.50 | $50.00 |
| 70 | Barrier rail delineator (712-04.50) | EACH | 10 | $39.00 | $38.00 |
| 71 | Warning lights (type A) (712-05.01) | EACH | 50 | $39.00 | $33.00 |
| 72 | Signs (construction) (712-06) | SF | 1,486 | $15.00 | $15.00 |
| 73 | Temporary barricades (type III) (712-07.03) | LF | 77 | $30.00 | $22.00 |
| 74 | Removable pavement marking (8" barrier line) (712-09.02) | LF | 1,406 | $4.55 | $4.00 |
| 75 | Removable pavement marking (stop line) (712-09.04) | LF | 48 | $23.00 | $25.00 |
| 76 | Removable pavement marking (6" line) (712-09.08) | LF | 840 | $3.70 | $3.80 |
| 77 | Removable black-out tape (6") (712-09.30) | LF | 1,500 | $3.70 | $3.90 |
| 78 | Class A concrete (foundation for sign supports) (713-01.01) | CY | 2 | $875.00 | $800.00 |
| 79 | Steel bar reinforcement(foundation for sign supports) (713-01.02) | LB | 225 | $4.00 | $4.00 |
| 80 | Sign post delineation enhancement (713-02.21) | LF | 6 | $9.10 | $8.00 |
| 81 | Perforated/knockout square tube post (713-11.02) | LB | 1,257 | $5.70 | $6.00 |
| 82 | Square tube sign support (713-11.05) | LB | 233 | $9.10 | $8.00 |
| 83 | P post slip base (713-11.21) | EACH | 9 | $739.00 | $700.00 |
| 84 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 140 | $15.00 | $18.00 |
| 85 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 45 | $16.00 | $20.00 |
| 86 | Removal of signs, posts and footings (713-15) | LS | 1 | $2,500.00 | $1,200.00 |
| 87 | Changeable message sign unit (713-16.01) | EACH | 2 | $10,400 | $11,000 |
| 88 | Plastic pavement marking (stop line) (716-02.05) | LF | 31 | $17.00 | $20.00 |
| 89 | Painted pavement marking (6" line) (716-05.20) | LM | 0.80 | $2,845.00 | $3,300.00 |
| 90 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 0.80 | $8,550.00 | $10,000 |
| 91 | Mobilization (717-01) | LS | 1 | $425,000 | $600,000 |
| 92 | Temporary traffic signal system (730-40.02) | LS | 1 | $100,600 | $170,000 |
| 93 | Geogrid reinforcement type 2 (740-07.04) | SY | 800 | $6.30 | $12.00 |
| 94 | Geotextile (type III)(erosion control) (740-10.03) | SY | 875 | $7.30 | $10.00 |
| 95 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 1,105 | $7.50 | $14.00 |
| 96 | Temporary sediment tube 12IN (740-11.02) | LF | 425 | $4.50 | $12.00 |
| 97 | Temporary seeding (with mulch) (801-01.07) | UNIT | 8 | $85.50 | $135.00 |
| 98 | Natve seed MX final stablizatn of slopes (801-01.38) | UNIT | 8 | $114.00 | $230.00 |
| 99 | Seeding (without mulch) (801-02) | UNIT | 4 | $91.00 | $100.00 |
| 100 | Water (seeding & sodding) (801-03) | MG | 5 | $79.50 | $300.00 |
| 101 | Sodding (new sod) (803-01) | SY | 472 | $11.50 | $18.00 |
| 102 | Erosion control blanket (type II) (805-12.02) | SY | 451 | $2.85 | $5.00 |
| 103 | Project mowing (806-02.03) | CYCL | 6 | $2,670.00 | $6,000.00 |
| 104 | Removal of asbestos (202-01.02) | LS | 1 | $35,000 | $25,000 |
| 105 | Removal of structures (EX. BR. no. 86-SR107-05.22) (202-04.01) | LS | 1 | $375,000 | $300,000 |
| 106 | Dry excavation (bridges) (204-02.01) | CY | 176 | $86.00 | $72.00 |
| 107 | Granular backfill (bridges) (303-01.02) | TON | 30 | $130.00 | $100.00 |
| 108 | Pavement @ bridge ends (604-03.04) | SY | 230 | $754.00 | $520.00 |
| 109 | Bridge deck grooving (mechanical) (604-05.31) | SY | 776 | $5.50 | $12.00 |
| 110 | Conc parapet single slope (STD-1-1SS) (620-05.01) | LF | 289 | $298.00 | $320.00 |
| 111 | 6" perforated pipe with vertical drain system (710-09.01) | LF | 124 | $100.00 | $85.00 |
| 112 | 6" pipe underdrain (710-09.02) | LF | 28 | $87.00 | $85.00 |
| 113 | Wet excavation (bridges) (204-03.01) | CY | 94 | $110.00 | |
| 114 | Foundation preparation(PR no. 1 ,sta. 210+80.00) (204-10.01) | LS | 1 | $30,000 | |
| 115 | Core drilling for piles(soil) (204-15) | LF | 904 | $700.00 | |
| 116 | Epoxy coated reinforcing steel (604-02.03) | LB | 48,378 | $1.80 | |
| 117 | Class A concrete (bridges) (604-03.01) | CY | 154 | $1,600.00 | |
| 118 | Steel bar reinforcement (bridges) (604-03.02) | LB | 26,409 | $2.40 | |
| 119 | Class D concrete (bridge deck) (604-03.09) | CY | 155 | $1,800.00 | |
| 120 | Applied texture finish (new structures) (604-04.01) | SY | 582 | $25.00 | |
| 121 | Steel piles (12 inch) (606-03.03) | LF | 1,176 | $250.00 | |
| 122 | Pile tips (steel piles, 12 inch) (606-03.06) | EACH | 40 | $280.00 | |
| 123 | Prestressed concrete box beam (33" X 36") (615-02.05) | LF | 578 | $650.00 | |
| 124 | Core drilling for piles(soil) (204-15) | LF | 585 | $725.00 | |
| 125 | Steel structures (35-inch web, welded plate girder) (602-04.01) | LS | 1 | $950,000 | |
| 126 | Bearing device (abutments) (602-10.60) | EACH | 10 | $3,300.00 | |
| 127 | Epoxy coated reinforcing steel (604-02.03) | LB | 37,373 | $3.60 | |
| 128 | Class A concrete (bridges) (604-03.01) | CY | 50 | $3,100.00 | |
| 129 | Steel bar reinforcement (bridges) (604-03.02) | LB | 9,934 | $3.40 | |
| 130 | Class D concrete (bridge deck) (604-03.09) | CY | 196 | $1,670.00 | |
| 131 | Applied texture finish (new structures) (604-04.01) | SY | 351 | $48.00 | |
| 132 | Steel piles (12 inch) (606-03.03) | LF | 612 | $200.00 | |
| 133 | Pile tips (steel piles, 12 inch) (606-03.06) | EACH | 18 | $400.00 | |
| 134 | Removal of asphalt pavement (202-03.03) | CY | 160 | $86.00 | $65.00 |
| 135 | Erosion control (209-99.91) | LS | 1 | $33,000 | $15,000 |
| 136 | Saw cutting asphalt pavement (407-20.05) | LF | 855 | $15.50 | $13.00 |
| 137 | Pole 45FT class 2 metal (790-04.07) | EACH | 5 | $4,600.00 | $6,000.00 |
| 138 | Pole 50FT class 2 wood (790-05.02) | EACH | 1 | $3,300.00 | $4,300.00 |
| 139 | Pole 50FT class 2 metal (790-05.06) | EACH | 2 | $7,000.00 | $9,000.00 |
| 140 | Pole 55 FT class 2 metal (790-06.06) | EACH | 1 | $9,500.00 | $12,000 |
| 141 | Pole 60FT class H5 metal (790-07.18) | EACH | 1 | $16,200 | $21,000 |
| 142 | Pole(35FT class 4 metal) (790-20.01) | EACH | 2 | $12,300 | $16,000 |
| 143 | Pole(55FT class H5 metal) (790-20.08) | EACH | 1 | $16,200 | $21,000 |
| 144 | Top existing pole (790-20.30) | EACH | 13 | $84.50 | $95.00 |
| 145 | 1PH primary tap 15KV (790-21.09) | EACH | 1 | $508.00 | $590.00 |
| 146 | 1PH crossarm deadend 15KV (790-21.11) | EACH | 1 | $774.00 | $900.00 |
| 147 | 1PH crossarm dde 15KV (790-21.12) | EACH | 1 | $774.00 | $900.00 |
| 148 | 3PH crossarm DBL 15KV (790-25.06) | EACH | 2 | $2,800.00 | $3,500.00 |
| 149 | 3PH crossarm DBL 10FT prim sup 15KV (790-25.12) | EACH | 4 | $2,800.00 | $3,500.00 |
| 150 | 3PH crossarm deadend SGL 15KV (790-25.21) | EACH | 1 | $1,800.00 | $2,200.00 |
| 151 | 3PH crossarm dde 15KV (790-25.23) | EACH | 4 | $3,700.00 | $4,700.00 |
| 152 | Service assembly-pole type (790-31.02) | EACH | 9 | $229.00 | $260.00 |
| 153 | Service conductor 6 AL duplex (790-31.04) | LF | 61 | $1.50 | $2.00 |
| 154 | Service conductor 2 AL triplex (790-31.11) | LF | 549 | $4.40 | $5.00 |
| 155 | Down guy - through bolt ST PL (790-32.03) | EACH | 14 | $479.00 | $550.00 |
| 156 | OH guy - through bolt type (790-32.07) | EACH | 7 | $602.00 | $680.00 |
| 157 | Guy guard (790-32.23) | EACH | 10 | $37.50 | $43.00 |
| 158 | Plate type anchor 10,000LB-12,000LB (790-33.06) | EACH | 2 | $895.00 | $1,000.00 |
| 159 | Screw type anchor 15,000LB (790-33.25) | EACH | 4 | $895.00 | $1,000.00 |
| 160 | Screw type anchor 28,000LB (790-33.26) | EACH | 9 | $1,150.00 | $1,450.00 |
| 161 | Screw type anchor 32,000LB (790-33.27) | EACH | 3 | $1,160.00 | $1,460.00 |
| 162 | Transfer - light assembly (790-36.10) | EACH | 2 | $404.00 | $450.00 |
| 163 | Transfer existing 1PH transformer/recloser (790-36.11) | EACH | 7 | $1,020.00 | $1,300.00 |
| 164 | Transfer street light (790-36.13) | EACH | 1 | $340.00 | $440.00 |
| 165 | Transfer conductor (790-36.14) | EACH | 52 | $310.00 | $400.00 |
| 166 | Transfer framing/associated apparatus (790-36.15) | EACH | 16 | $410.00 | $520.00 |
| 167 | OH cond 4 7/1 acsr swanate (790-40.01) | LF | 160 | $2.80 | $3.00 |
| 168 | OH cond 1/0 6/1 acsr raven (790-40.03) | LF | 2,208 | $3.00 | $3.50 |
| 169 | OH cond 4/0 6/1 acsr penguin (790-40.06) | LF | 6,624 | $3.10 | $4.00 |
| 170 | UG sec cond 1/0 AL TPLX (790-41.46) | LF | 200 | $4.40 | $5.50 |
| 171 | 2IN dia PVC pipe (790-42.08) | LF | 230 | $22.00 | $28.00 |
| 172 | 2 duct bank @ 36IN-48IN depth (790-42.17) | LF | 130 | $80.00 | $100.00 |
| 173 | Secondary pullbox large (790-43.46) | EACH | 2 | $3,300.00 | $4,200.00 |
| 174 | Secondary riser W/ 2IN conduit (790-43.50) | EACH | 2 | $2,300.00 | $2,900.00 |
| 175 | Pole ground rod type (790-68.01) | EACH | 13 | $520.00 | $680.00 |
| 176 | Miscellaneous assemblies (790-68.10) | EACH | 25 | $400.00 | $500.00 |
| 177 | Dead end shoe (790-68.11) | EACH | 12 | $111.00 | $130.00 |
| 178 | Extension link - epoxy -8FT (790-69.41) | EACH | 2 | $139.00 | $160.00 |
| 179 | Street light (70W LED) (790-70.20) | EACH | 2 | $1,150.00 | $1,300.00 |
| 180 | Guy factory formed with thimble clevis (790-72.07) | EACH | 9 | $312.00 | $350.00 |
| 181 | 108-144 fiber(installation only) (790-74.20) | LF | 4,219 | $0.90 | $1.00 |
| 182 | 288-432 fiber(installation only) (790-74.22) | LF | 2,016 | $0.90 | $1.00 |
| 183 | Fiber tangent assembly (790-74.31) | EACH | 10 | $346.00 | $400.00 |
| 184 | Fiber deadend assembly (790-74.32) | EACH | 46 | $200.00 | $250.00 |
| 185 | Fiber storage double loop (790-74.35) | EACH | 12 | $200.00 | $248.00 |
| 186 | Remove wire (790-98.01) | LF | 15,376 | $1.75 | $2.00 |
| 187 | Remove poles (790-98.02) | EACH | 13 | $462.00 | $540.00 |
| 188 | Remove framing/associated apparatus (790-98.03) | EACH | 192 | $364.00 | $420.00 |
| 189 | Tree and brush removal off row (790-98.20) | LS | 1 | $6,930.00 | $8,000.00 |
| 190 | 6IN steel gas main (791-01.05) | LF | 531 | $228.00 | $260.00 |
| 191 | 2IN mdpe gas main (791-02.02) | LF | 215 | $193.00 | $220.00 |
| 192 | HDD 2IN PE pipe - unconsolidated (791-04.02) | LF | 245 | $410.00 | $460.00 |
| 193 | Bore/jack 12IN - steel casing pipe - rock (791-05.21) | LF | 80 | $1,250.00 | $1,700.00 |
| 194 | Connect to 2IN EX. PE main (791-06.02) | EACH | 2 | $7,610.00 | $8,500.00 |
| 195 | Connect to 6IN EX. STL main (791-06.12) | EACH | 2 | $23,400 | $27,000 |
| 196 | Connect to 6IN EX. STL main W/ stopple (791-06.33) | EACH | 2 | $56,200 | $64,000 |
| 197 | 2IN PE hot tap connection (791-06.51) | EACH | 1 | $17,000 | $19,000 |
| 198 | 2IN PE gas valve assembly (791-07.01) | EACH | 3 | $3,280.00 | $3,800.00 |
| 199 | 6IN steel gas valve assembly (791-07.11) | EACH | 2 | $14,600 | $17,000 |
| 200 | 1IN PE service pipe (791-08.08) | LF | 10 | $211.00 | $240.00 |
| 201 | 3-wire cathodic protection station (791-09.02) | EACH | 2 | $2,930.00 | $3,400.00 |
| 202 | Restore asphalt (791-09.05) | SY | 200 | $195.00 | $80.00 |
| 203 | Retire in place 6IN serv cut & plug (791-10.06) | EACH | 2 | $5,000.00 | $6,300.00 |
| 204 | Pole 35FT class 5 wood (793-01.08) | EACH | 6 | $2,500.00 | $6,000.00 |
| 205 | Anchor 3/4IN (793-01.40) | EACH | 9 | $725.00 | $1,100.00 |
| 206 | Guy wire 6.6M or 1/4IN (793-02.07) | EACH | 2 | $200.00 | $420.00 |
| 207 | Guy wire 10M or 3/8IN (793-02.08) | EACH | 10 | $220.00 | $480.00 |
| 208 | Overhead guy wire (10M) (793-02.93) | LF | 3 | $620.00 | $950.00 |
| 209 | 25 pair group aerial splice (793-03.01) | EACH | 158 | $320.00 | $440.00 |
| 210 | 6M strand (793-03.02) | LF | 1,130 | $3.60 | $4.00 |
| 211 | 10M strand (793-03.03) | LF | 1,750 | $4.70 | $5.00 |
| 212 | 50 pair cable (793-03.12) | LF | 50 | $6.60 | $18.00 |
| 213 | 200 paircable (793-03.16) | LF | 905 | $9.10 | $25.00 |
| 214 | 400 pair cable (793-03.18) | LF | 740 | $11.00 | $45.00 |
| 215 | 600 pair cable (793-03.19) | LF | 305 | $13.50 | $60.00 |
| 216 | Relash/delash cable (793-04.01) | LF | 3,977 | $6.20 | $7.00 |
| 217 | 2 pair aerial drop (793-04.02) | LF | 1,610 | $5.10 | $7.00 |
| 218 | Ready access closure (793-04.06) | EACH | 5 | $492.00 | $1,100.00 |
| 219 | Aerial splice closure (793-04.07) | EACH | 5 | $492.00 | $1,100.00 |
| 220 | Transfer aerial cable (793-04.08) | EACH | 22 | $559.09 | $700.00 |
| 221 | Buried riser guard (793-11.13) | EACH | 4 | $615.00 | $700.00 |
| 222 | 600 pair UG cable (793-12.08) | LF | 300 | $13.50 | $60.00 |
| 223 | 2 duct formation @ 36IN depth (793-13.17) | LF | 200 | $53.50 | $80.00 |
| 224 | Sand encasement per duct (793-14.01) | LF | 400 | $6.30 | $13.00 |
| 225 | Remove aerial cable and wire (793-98.01) | LF | 6,875 | $3.55 | $4.00 |
| 226 | Remove poles all sizes (793-98.04) | EACH | 12 | $820.00 | $850.00 |
| 227 | Remove anchor (any size) (793-98.08) | EACH | 11 | $74.50 | $100.00 |
| 228 | 4IN dip restrained joint water line (795-01.01) | LF | 10 | $1,330.00 | $280.00 |
| 229 | 8IN dip restrained joint water line (795-01.05) | LF | 740 | $256.00 | $200.00 |
| 230 | 12IN dip restrained joint water line (795-01.09) | LF | 310 | $437.00 | $320.00 |
| 231 | 2IN PVC casing pipe open cut (795-05.91) | LF | 115 | $91.00 | $120.00 |
| 232 | Connect to 6IN water line (795-06.04) | EACH | 1 | $2,440.00 | $6,800.00 |
| 233 | Cut and cap 4IN water line (795-06.32) | EACH | 2 | $2,400.00 | $350.00 |
| 234 | 4IN X 4IN tapping sleeve and valve (795-07.01) | EACH | 2 | $7,680.00 | $10,000 |
| 235 | 12IN X 12IN tapping sleeve and valve (795-07.15) | EACH | 2 | $16,100 | $25,000 |
| 236 | Insertion valve (4IN) (795-07.30) | EACH | 1 | $18,300 | $3,200.00 |
| 237 | Insertion valve (12IN) (795-07.34) | EACH | 2 | $26,700 | $9,000.00 |
| 238 | 8IN gate valve assembly (795-08.05) | EACH | 2 | $6,260.00 | $5,000.00 |
| 239 | Relocate/reconnect service assembly (795-09.09) | EACH | 3 | $2,800.00 | $2,700.00 |
| 240 | Sample tap (795-09.10) | EACH | 1 | $2,110.00 | $16,000 |
| 241 | TI of 2IN HDPE casing for service pipe-uncon (795-09.24) | LF | 155 | $276.00 | $220.00 |
| 242 | 3/4IN copper service pipe (795-09.28) | LF | 270 | $55.50 | $220.00 |
| 243 | 2IN blow-off assembly (795-10.31) | EACH | 1 | $5,000.00 | $3,200.00 |
| 244 | Blow-off assembly (795-11.01) | EACH | 1 | $6,130.00 | $4,400.00 |
| 245 | Retire in place existing water main (795-11.12) | LF | 1,111 | $32.50 | $15.00 |
| 246 | Remove exisitng valve (795-12.07) | EACH | 2 | $1,120.00 | $800.00 |
| 247 | Creek crossing (#1) (795-13.05) | LS | 1 | $123,100 | $70,000 |
| 248 | Reconnect service assembly (795-20.01) | EACH | 2 | $1,190.00 | $1,100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of August 15, 2025. Compiled by Mirage Metrics.