Summers-Taylor, Inc.: TDOT bid record
Summers-Taylor, Inc. submitted 84 bids on Tennessee DOT contracts in the data, from 09 FEB 2018 to 02 OCT 2026, and was the low bidder on 40 of them (48%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $224,836,954
- Latest bid
- 02 OCT 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 7 | 6 | 86% |
| 2020 | 6 | 3 | 50% |
| 2023 | 5 | 1 | 20% |
| 2024 | 16 | 8 | 50% |
| 2025 | 30 | 12 | 40% |
| 2026 | 20 | 10 | 50% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Sullivan County | 14 | 8 | 57% |
| Hawkins County | 7 | 1 | 14% |
| Greene County | 6 | 3 | 50% |
| Washington County | 6 | 5 | 83% |
| Unicoi County | 6 | 6 | 100% |
| Carter County | 6 | 3 | 50% |
| Hamblen County | 3 | 1 | 33% |
| Bradley County | 3 | 0 | 0% |
| Sullivan | 3 | 2 | 67% |
| Greene | 3 | 3 | 100% |
| Polk County | 2 | 0 | 0% |
| Carter | 2 | 2 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Signs (construction) | 712-06 | SF | 57 | 23 (40%) | $10.00 | $8.00 |
| Flexible drums (channelizing) | 712-04.01 | EACH | 45 | 18 (40%) | $40.00 | $34.50 |
| Bituminous material for tack coat (TC) | 403-01 | TON | 49 | 16 (33%) | $1,200.00 | $969.62 |
| Warning lights (type A) | 712-05.01 | EACH | 37 | 15 (41%) | $28.50 | $24.00 |
| Water (seeding & sodding) | 801-03 | MG | 30 | 14 (47%) | $103.00 | $100.00 |
| Arrow board (type C) | 712-08.03 | EACH | 28 | 14 (50%) | $1,340.00 | $1,170.00 |
| Cold planing bituminous pavement | 415-01.01 | TON | 25 | 14 (56%) | $49.25 | $34.00 |
| Rock check dam | 209-08.07 | EACH | 18 | 14 (78%) | $759.50 | $884.00 |
| Geotextile (type III)(erosion control) | 740-10.03 | SY | 29 | 13 (45%) | $6.50 | $4.84 |
| Seeding (without mulch) | 801-02 | UNIT | 21 | 13 (62%) | $35.50 | $48.00 |
| Mineral aggregate, type A base, grading D | 303-01 | TON | 40 | 12 (30%) | $66.38 | $45.00 |
| Acs mix(PG64-22) grading D | 411-01.10 | TON | 33 | 12 (36%) | $249.00 | $171.29 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Southern Constructors, Inc. | 17 | 9 of 17 |
| W-L Construction & Paving, Inc. | 14 | 8 of 14 |
| Jones Bros. Contractors, LLC | 10 | 6 of 10 |
| APAC-Atlantic, Inc. | 9 | 5 of 9 |
| Baker's Construction Services, Inc. | 9 | 6 of 9 |
| Wright Brothers Civil Construction, LLC | 7 | 4 of 7 |
| Mid-State Construction Company, Inc. | 6 | 3 of 6 |
| Charles Blalock & Sons, Inc. | 6 | 4 of 6 |
| Whaley Construction, LLC | 6 | 4 of 6 |
| Cleary Construction, Inc. | 5 | 2 of 5 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 02 OCT 2026 | CN261070 | Carter County | The bridge rehabilitation on u.s. 19e (s.r. 37) under the bridges over laurel fork creek (l.m. 16.96), including slope repair near l.m. 17.1 | 2 of 3 | $2,140,355 | +7.0% |
| 02 OCT 2026 | CN261067 | Carter County | The slope stabilization on s.r. 143 near l.m. 9.8 | 3 of 4 | $1,138,211 | +14% |
| 02 OCT 2026 | CN261079 | Hawkins County | The construction of a concrete bulb-tee beam bridge on afg road over southern railway (l.m. 0.45), including grading, drainage, and paving | 3 of 3 | $7,949,973 | +9.0% |
| 02 OCT 2026 | CN261064 | Sullivan County | The grading, drainage, construction of bridges and a retaining wall, signals, and paving on a s.i.a. route serving eastman chemical company | 1 of 1 | $23,131,389 | Low |
| 14 AUG 2026 | CN262056 | Grundy County | The grading, drainage, lighting, and paving on i-24 at the s.r. 50 interchange (l.m. 0.56) (exit 127) | 3 of 5 | $4,789,783 | +6.0% |
| 26 JUN 2026 | CN261054 | Greene County | The resurfacing on s.r. 172 from u.s. 11e (u.s. 321, s.r. 34) (l.m. 0.00) to i-81 (l.m. 11.68) | 1 of 1 | $2,985,656 | Low |
| 26 JUN 2026 | CN261055 | Hawkins County | The resurfacing (microsurface or thin mix overlay) on s.r. 70 from near s.r. 94 (l.m. 12.62) to the hancock county line (l.m. 22.17) | 1 of 2 | $1,887,200 | Low, 8.0% under the second |
| 26 JUN 2026 | CN261057 | Hawkins County | The grading, drainage, construction of bridges, signals, and paving on s.r. 31 near u.s. 11w (s.r. 1) in mooresburg (l.m. 0.100) to adams la | 2 of 4 | $18,433,196 | +13% |
| 26 JUN 2026 | CN261901 | Johnson County | The construction of a concrete box beam bridge on slimp branch road over roan creek (l.m. 0.34), including grading, drainage, and paving | 2 of 2 | $3,399,263 | +15% |
| 26 JUN 2026 | CN261044 | Monroe County | The grading, drainage, signals and paving on s.r. 322 from sheppard road (l.m. 13.34) to s.r. 72 (l.m. 15.53) | 4 of 6 | $25,095,415 | +19% |
| 26 JUN 2026 | CN261049 | Sullivan County | The resurfacing on s.r. 36 from near lakeside lane (l.m. 2.75) to near summerville road (l.m. 4.78), including thin epoxy overlay on the bri | 1 of 2 | $2,040,413 | Low, 22% under the second |
| 08 MAY 2026 | CN261050 | Unicoi County | The resurfacing on s.r. 395 from the north carolina state line (l.m. 0.00) to bear wallow road (l.m. 3.00) | 1 of 1 | $1,352,714 | Low |
| 20 MAR 2026 | CN261017 | Greene And Washington Counties | The resurfacing on s.r. 93 from s.r. 351 (l.m. 8.04) in greene county to s.r. 81 (l.m. 1.10) in washington county | 1 of 1 | $2,663,323 | Low |
| 20 MAR 2026 | CN261025 | Sullivan County | The resurfacing on i-26 from u.s. 11w (s.r. 1) (l.m. 0.00) to near welcome center road (l.m. 5.31) | 2 of 2 | $7,687,839 | +7.0% |
| 20 MAR 2026 | CN261026 | Sullivan County | The construction of a small drainage structure on s.r. 347 at l.m. 5.77 | 2 of 4 | $1,732,601 | +18% |
| 20 MAR 2026 | CN261027 | Unicoi County | The resurfacing on i-26 from the carter county line (l.m. 0.00) to near main street (l.m. 7.76), including repair work on bridges | 1 of 1 | $10,272,528 | Low |
| 06 FEB 2026 | CN262019 | Bradley County | The construction of a concrete bulb-tee beam bridge on old lower river road over south mouse creek (l.m. 13.09), including grading, drainage | 2 of 5 | $2,392,255 | +17% |
| 06 FEB 2026 | CN261008 | Sullivan County | The resurfacing on u.s. 11e (u.s. 19, s.r. 34) from the washington county line (l.m. 0.00) to near weaver branch road (l.m. 6.10), including | 1 of 2 | $4,397,293 | Low, 17% under the second |
| 06 FEB 2026 | CN261010 | Washington County | The resurfacing on s.r. 81 from near s.r. 75 (l.m. 17.99) to near s.r. 93 (l.m. 23.42) | 1 of 1 | $1,203,412 | Low |
| 09 JAN 2026 | CN262018 | Marion County | The slide mitigation on i-24 wb near mm 137 | 1 of 4 | $3,482,063 | Low, 20% under the second |
| 05 DEC 2025 | CNZ322 | Sullivan County | The resurfacing on i-81 from near i-26 (l.m. 4.31) to near s.r. 357 (l.m. 9.38) | 1 of 2 | $6,162,855 | Low, 15% under the second |
| 05 DEC 2025 | CNZ276 | Sullivan County | The grading, drainage, retaining walls, signals, and paving on s.r. 126 from near east center street (l.m. 3.67) in kingsport to east of bri | 2 of 2 | $88,509,364 | +8.0% |
| 05 DEC 2025 | CNZ128 | Sullivan County | The resurfacing on u.s. 11w (s.r. 1) from the virginia state line (l.m. 23.99) to bob morrison boulevard (l.m. 24.99) | 2 of 2 | $1,240,292 | +11% |
| 05 DEC 2025 | CNZ321 | Sullivan County | The resurfacing (either microsurface or thin mix overlay) on s.r. 358 from s.r. 44 (l.m. 0.00) to near s.r. 394 (l.m. 6.10) | 2 of 2 | $1,587,861 | +47% |
| 05 DEC 2025 | CNZ320 | Washington County | The resurfacing on u.s. 11e (s.r. 34) from near s.r. 36 (l.m. 20.00) to the sullivan county line (l.m. 23.79), including thin epoxy overlay | 1 of 1 | $3,205,662 | Low |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.