Charles Blalock & Sons, Inc.: TDOT bid record
Charles Blalock & Sons, Inc. submitted 31 bids on Tennessee DOT contracts in the data, from 09 FEB 2018 to 02 OCT 2026, and was the low bidder on 13 of them (42%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $176,458,388
- Latest bid
- 02 OCT 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 3 | 2 | 67% |
| 2020 | 3 | 0 | 0% |
| 2023 | 1 | 0 | 0% |
| 2024 | 7 | 3 | 43% |
| 2025 | 6 | 3 | 50% |
| 2026 | 11 | 5 | 45% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Sevier County | 7 | 6 | 86% |
| Cocke County | 4 | 1 | 25% |
| Jefferson County | 2 | 1 | 50% |
| Campbell County | 2 | 0 | 0% |
| Sevier | 2 | 1 | 50% |
| Hamblen County | 1 | 0 | 0% |
| Blount County | 1 | 0 | 0% |
| Roane County | 1 | 0 | 0% |
| Anderson County | 1 | 0 | 0% |
| Hawkins County | 1 | 0 | 0% |
| Monroe County | 1 | 1 | 100% |
| Cumberland County | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Road & drainage excavation (unclassified) | 203-01 | CY | 20 | 9 (45%) | $25.11 | $35.00 |
| Temporary silt fence (with backing) | 209-08.02 | LF | 16 | 9 (56%) | $5.38 | $6.00 |
| Signs (construction) | 712-06 | SF | 22 | 8 (36%) | $8.77 | $8.00 |
| Water | 203-06 | MG | 19 | 8 (42%) | $79.95 | $22.20 |
| Furnishing & spreading topsoil | 203-07 | CY | 10 | 8 (80%) | $46.50 | $65.00 |
| Temporary seeding (with mulch) | 801-01.07 | UNIT | 16 | 7 (44%) | $42.60 | $49.25 |
| Removal of snowplowable reflective marker | 716-01.30 | EACH | 13 | 7 (54%) | $11.00 | $12.00 |
| Cold planing bituminous pavement | 415-01.01 | TON | 13 | 7 (54%) | $67.84 | $34.00 |
| Bituminous material for prime coat (PC) | 402-01 | TON | 12 | 7 (58%) | $463.67 | $1,175.00 |
| Temporary work zone crash cushion (MASH TL-3) | 712-02.60 | EACH | 12 | 7 (58%) | $5,825.00 | $8,800.00 |
| Trainee | 109-10.01 | HR | 7 | 7 (100%) | $0.80 | $0.80 |
| Bituminous material for tack coat (TC) | 403-01 | TON | 19 | 6 (32%) | $1,050.00 | $969.62 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Whaley Construction, LLC | 10 | 7 of 10 |
| Cleary Construction, Inc. | 8 | 4 of 8 |
| Jones Bros. Contractors, LLC | 7 | 1 of 7 |
| Southern Constructors, Inc. | 7 | 2 of 7 |
| Summers-Taylor, Inc. | 6 | 2 of 6 |
| Twin K Construction, Inc. | 3 | 3 of 3 |
| Richard Goettle, Inc. | 2 | 1 of 2 |
| Nicholas Overbay DBA East Tennessee Turf and Landscape | 2 | 1 of 2 |
| Adams Contracting, LLC | 2 | 1 of 2 |
| King General Contractors, Inc. | 2 | 0 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 02 OCT 2026 | CN261074 | Claiborne County | The construction of a concrete box beam bridge on s.r. 33 over south fork sycamore creek (l.m. 20.56), including grading, drainage, and pavi | 2 of 5 | $2,993,828 | +13% |
| 02 OCT 2026 | CN261069 | Cocke County | The rehabilitation of the bridge on i-40 over the pigeon river and hartford road near l.m. 15.05 | 2 of 4 | $2,287,100 | +12% |
| 14 AUG 2026 | CN261063 | Campbell County | The grading, drainage, signals and paving on u.s. 25w (s.r. 9) at the intersection of hunters branch road in lafollette (l.m. 26.05 - l.m. 2 | 3 of 5 | $1,876,970 | +26% |
| 14 AUG 2026 | CN262058 | Cumberland County | The grading, drainage, construction of concrete bulb-tee bridges, and paving on u.s. 127 (s.r. 28) from near potato farm road to near lowe r | 1 of 6 | $69,978,616 | Low, 4.0% under the second |
| 14 AUG 2026 | CN261061 | Knox County | The intersection improvements on s.r. 131 (emory road) at harrell road/carpenter road (l.m. 9.5), including grading, drainage, signals, and | 1 of 4 | $7,897,170 | Low, 16% under the second |
| 26 JUN 2026 | CN261057 | Hawkins County | The grading, drainage, construction of bridges, signals, and paving on s.r. 31 near u.s. 11w (s.r. 1) in mooresburg (l.m. 0.100) to adams la | 3 of 4 | $19,774,267 | +21% |
| 26 JUN 2026 | CN261044 | Monroe County | The grading, drainage, signals and paving on s.r. 322 from sheppard road (l.m. 13.34) to s.r. 72 (l.m. 15.53) | 1 of 6 | $21,113,715 | Low, 5.0% under the second |
| 08 MAY 2026 | CN261038 | Jefferson County | The resurfacing on s.r. 139 from the sevier county line (l.m. 0.00) to s.r. 92 (l.m. 7.97) | 1 of 2 | $1,248,046 | Low, 31% under the second |
| 20 MAR 2026 | CN261015 | Anderson County | The grading, drainage, construction of a concrete box bridge, and paving on a s.i.a. route from u.s. 441 (s.r. 71) to sawmill road, serving | 2 of 5 | $4,769,083 | +8.0% |
| 20 MAR 2026 | CN261024 | Sevier County | The resurfacing on s.r. 449 from near center view road (l.m. 3.35) to u.s. 411 (s.r. 35) (l.m. 6.20), including bridge repair work | 2 of 2 | $3,416,970 | +1.0% |
| 06 FEB 2026 | CN261011 | Sevier County | The new construction on the s.r. 449 extension (veteran's boulevard) from u.s. 411 (s.r. 35) to near robert henderson road, and miscellaneou | 1 of 1 | $25,993,101 | Low |
| 05 DEC 2025 | CNZ324 | Sevier County | The resurfacing on u.s. 441 (s.r. 71) from the smokey mountain park boundary (l.m. 14.78) to dudley creek (l.m. 16.60) | 1 of 1 | $1,293,969 | Low |
| 03 OCT 2025 | CNZ252 | Cocke County | The construction of a concrete box bridge on u.s. 25 (s.r. 9) over branch (l.m. 21.43), including grading, drainage, and paving | 2 of 3 | $2,684,674 | +27% |
| 25 JUL 2025 | CNZ232 | Sevier County | The resurfacing on s.r. 339 from near old newport highway (l.m. 2.00) to the cocke county line (l.m. 15.93) | 1 of 1 | $1,681,656 | Low |
| 27 JUN 2025 | CNZ178 | Roane County | The construction of a concrete bulb-tee beam bridge on u.s. 27 (s.r. 29) over u.s. 27 (s.r. 29)/s.r. 61 (l.m. 12.10), including grading, dra | 3 of 7 | $4,496,286 | 0.0% |
| 09 MAY 2025 | CNZ154 | Sevier County | The resurfacing on u.s. 411 (s.r. 35) from near the little pigeon river (l.m. 17.65) to near sims road (l.m. 24.24) | 1 of 1 | $3,477,670 | Low |
| 21 MAR 2025 | CNZ123 | Blount County | The stream mitigation and dam removal of pistol creek dam in alcoa | 2 of 4 | $596,970 | +6.0% |
| 06 DEC 2024 | CNY315 | Cocke County | The installation of soil nail reinforcement and rock anchors on i-40 near mile markers 450.7, 451.0, and 451.6 (hurricane helene) | 1 of 3 | $26,534,619 | Low, 22% under the second |
| 18 OCT 2024 | CNY205 | Hamblen County | The grading, drainage, construction of a concrete box bridge, signals, and paving on u.s. 11e (s.r. 34) from u.s. 25e (s.r. 32) (l.m. 11.14) | 4 of 4 | $79,867,180 | +26% |
| 04 OCT 2024 | CNY264 | Sevier County | The resurfacing on i-40 from the knox county line (l.m. 0.00) to the jefferson county line (l.m. 4.76) | 1 of 1 | $10,987,753 | Low |
| 21 JUN 2024 | CNY172 | Campbell County | The improvement of the intersection on s.r. 63 at s.r. 297, and construction of a truck climbing lane from west of old s.r. 63 to west of st | 4 of 4 | $16,466,222 | +87% |
| 10 MAY 2024 | CNY119 | Sevier County | 002,78s454-f8-002 the resurfacing on s.r. 416 from s.r. 454 (l.m. 9.29) to u.s 411 (s.r. 35) (l.m. 14.59) and on s.r. 454 from u.s. 321 (s.r | 1 of 1 | $1,878,735 | Low |
| 09 FEB 2024 | CNY069 | Cocke County | The slide mitigation on u.s. 25e (s.r. 32) near l.m. 28.27, including grading, drainage, retaining wall, and paving | 2 of 4 | $7,965,517 | +9.0% |
| 09 FEB 2024 | CNY006 | Jefferson County | The improvement of the intersection on s.r. 113 at s.r. 341 (l.m. 5.17 to l.m. 5.35), including grading, drainage, signals, and paving | 2 of 2 | $3,673,382 | +1.0% |
| 08 DEC 2023 | CNX350 | Hamblen | The grading, drainage, signals and paving on u.s. 25e (s.r. 32) at the intersection of progress parkway/thoroughbred run road in morristown | 3 of 5 | $5,886,035 | +18% |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.