Adams Contracting, LLC: TDOT bid record
Adams Contracting, LLC submitted 20 bids on Tennessee DOT contracts in the data, from 23 MAR 2018 to 02 OCT 2026, and was the low bidder on 1 of them (5%). When it was not low, its total sat a median +28% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $2,115,010
- Latest bid
- 02 OCT 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 1 | 0 | 0% |
| 2020 | 2 | 0 | 0% |
| 2024 | 5 | 0 | 0% |
| 2025 | 5 | 1 | 20% |
| 2026 | 7 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Anderson County | 3 | 0 | 0% |
| Rutherford County | 2 | 0 | 0% |
| Putnam County | 1 | 0 | 0% |
| Robertson County | 1 | 0 | 0% |
| Davidson County | 1 | 0 | 0% |
| Giles County | 1 | 0 | 0% |
| Wilson County | 1 | 0 | 0% |
| White County | 1 | 0 | 0% |
| Cocke County | 1 | 1 | 100% |
| Washington County | 1 | 0 | 0% |
| Dyer County | 1 | 0 | 0% |
| Maury County | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Sediment removal | 209-05 | CY | 18 | 10 (56%) | $15.00 | $31.36 |
| Geotextile (type III)(erosion control) | 740-10.03 | SY | 19 | 9 (47%) | $3.00 | $4.84 |
| Plastic pavement marking (stop line) | 716-02.05 | LF | 15 | 8 (53%) | $18.00 | $17.30 |
| Enhanced flatline thermo PVMT MRKNG (6IN line) | 716-12.02 | LM | 13 | 6 (46%) | $8,500.00 | $7,425.00 |
| Temporary silt fence (with backing) | 209-08.02 | LF | 13 | 6 (46%) | $5.20 | $6.00 |
| Geotextile (type IV)(stabilization) | 740-10.04 | SY | 9 | 6 (67%) | $3.00 | $5.00 |
| Flexible drums (channelizing) | 712-04.01 | EACH | 20 | 5 (25%) | $35.50 | $34.50 |
| Snowplowable raised pavement markers (BI-dir) (1 color) | 716-01.21 | EACH | 7 | 5 (71%) | $39.00 | $40.48 |
| Removable pavement marking (stop line) | 712-09.04 | LF | 6 | 5 (83%) | $21.00 | $26.00 |
| Signs (construction) | 712-06 | SF | 20 | 4 (20%) | $8.00 | $8.00 |
| Bituminous material for tack coat (TC) | 403-01 | TON | 20 | 4 (20%) | $1,150.00 | $969.62 |
| Water (seeding & sodding) | 801-03 | MG | 18 | 4 (22%) | $110.00 | $100.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Rogers Group, Inc. | 8 | 8 of 8 |
| Jones Bros. Contractors, LLC | 7 | 5 of 7 |
| Civil Constructors, LLC | 7 | 7 of 7 |
| Southern Constructors, Inc. | 4 | 3 of 4 |
| Vulcan Construction Materials, LLC | 4 | 2 of 4 |
| J. Hill Excavating, LLC | 3 | 3 of 3 |
| Sessions Paving Company | 3 | 3 of 3 |
| Twin K Construction, Inc. | 2 | 2 of 2 |
| Jamison Construction, LLC | 2 | 1 of 2 |
| Eubank Asphalt Paving & Sealing, LLC | 2 | 2 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 02 OCT 2026 | CN261076 | Anderson County | The construction of a turn lane on s.r. 61 at the intersection of sinking springs road/lewallen hollow road (l.m. 17.55) in clinton, includi | 4 of 4 | $491,875 | +41% |
| 02 OCT 2026 | CN263064 | Bedford County | The construction of a concrete box bridge on old highway 64 over stokes branch (l.m. 0.11), including grading, drainage, and paving | 4 of 6 | $1,088,450 | +9.0% |
| 14 AUG 2026 | CN262056 | Grundy County | The grading, drainage, lighting, and paving on i-24 at the s.r. 50 interchange (l.m. 0.56) (exit 127) | 4 of 5 | $5,352,962 | +19% |
| 26 JUN 2026 | CN264903 | Dyer County | The construction of a multimodal path along s.r. 211 from samaria bend road (l.m. 0.47) to horner road (l.m. 1.09) in dyersburg | 2 of 2 | $2,449,957 | +19% |
| 26 JUN 2026 | CN263052 | Maury County | The grading, drainage, and paving on a s.i.a. route (including u.s. 43/s.r. 6) serving project leeward | 8 of 8 | $3,847,672 | +78% |
| 08 MAY 2026 | CN261051 | Anderson County | The slope stabilization on s.r. 116 near l.m. 0.9 | 4 of 4 | $1,279,514 | +28% |
| 20 MAR 2026 | CN261015 | Anderson County | The grading, drainage, construction of a concrete box bridge, and paving on a s.i.a. route from u.s. 441 (s.r. 71) to sawmill road, serving | 4 of 5 | $5,623,703 | +27% |
| 03 OCT 2025 | CNZ902 | White County | The construction of a small drainage structure on s.r. 111 at l.m. 15.76 | 5 of 5 | $5,672,471 | +135% |
| 03 OCT 2025 | CNZ252 | Cocke County | The construction of a concrete box bridge on u.s. 25 (s.r. 9) over branch (l.m. 21.43), including grading, drainage, and paving | 1 of 3 | $2,115,010 | Low, 27% under the second |
| 03 OCT 2025 | CNZ271 | Washington County | The grading, drainage, signals, and paving on u.s. 11e (s.r. 34) at the intersection of stockyard road and precision boulevard (l.m. 4.89 - | 2 of 3 | $3,641,946 | +11% |
| 09 MAY 2025 | CNZ076 | Giles County | The grading, drainage, and paving on a s.i.a. route serving integrity mold and murco wall products in pulaski | 3 of 3 | $3,990,163 | +42% |
| 09 MAY 2025 | CNZ153 | Wilson County | The grading, drainage, signals, and paving on u.s. 70 (s.r. 24) from terrace hill road (l.m. 5.90) to adeles garden road (l.m. 6.49) | 4 of 5 | $2,564,819 | +56% |
| 21 JUN 2024 | CNY154 | Davidson County | The improvement of the intersection, including signals, on s.r. 45 (old hickory boulevard) at myatt drive (l.m. 8.39 - l.m. 8.49) in nashvil | 3 of 4 | $1,359,564 | +25% |
| 21 JUN 2024 | CNY170 | Rutherford County | The miscellaneous safety improvements on u.s. 231 (s.r. 10) at the intersection of rock springs midland road (l.m. 3.44 to l.m. 3.82), inclu | 6 of 7 | $1,383,935 | +20% |
| 21 JUN 2024 | CNY157 | Rutherford County | The i-24 ramp improvements at u.s. 231 (s.r. 10, south church street) (exit 81) in murfreesboro, including grading, drainage, signals, light | 5 of 5 | $9,856,020 | +62% |
| 10 MAY 2024 | CNY903 | Putnam County | The construction of a concrete slab bridge on s.r. 135 at l.m. 13.57 | 6 of 6 | $792,898 | +54% |
| 10 MAY 2024 | CNY129 | Robertson County | The grading, drainage, and paving on a s.i.a. route serving project commodore (dorman products) | 6 of 6 | $4,121,269 | +71% |
| 15 MAY 2020 | CNU115 | Davidson And Sumner | The construction of a concrete box bridge on old shiloh road over mansker creek (l.m. 0.01) in nashville, including grading, drainage and pa | 4 of 5 | $579,877 | +22% |
| 15 MAY 2020 | CNU218 | Smith | The emergency slope stabilization on s.r. 80 near l.m. 4.2 | 5 of 6 | $877,777 | +46% |
| 23 MAR 2018 | CNS137 | Marshall | The construction of a concrete box bridge on hatchett hollow road over hatchett creek (l.m. 0.12) in cornersville | 4 of 4 | $319,280 | +24% |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.