TDOT contract CN261076 bid tabulation
The construction of a turn lane on s.r. 61 at the intersection of sinking springs road/lewallen hollow road (l.m. 17.55) in clinton, including grading, drainage, lighting and paving. Let by Tennessee DOT on October 2, 2026, Anderson County. 4 bids received; low bid $348,000 by Rogers Group, Inc..
- Owner
- Tennessee DOT
- Letting
- 02 OCT 2026
- Pay items
- 44
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rogers Group, Inc. | $348,000 | Low |
| 2 | Southern Constructors, Inc. | $475,898 | +37% |
| 3 | APAC-Atlantic, Inc. | $489,915 | +41% |
| 4 | Adams Contracting, LLC | $491,875 | +41% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rogers Group, Inc. | 2. Southern Constructors, Inc. | 3. APAC-Atlantic, Inc. | 4. Adams Contracting, LLC |
|---|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $16,275 | $30,000 | $7,950.00 | $15,000 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $3,000.00 | $10,000 | $7,500.00 | $4,000.00 |
| 3 | Road & drainage excavation (unclassified) (203-01) | CY | 614 | $32.00 | $60.00 | $62.25 | $60.00 |
| 4 | Placing and spreading topsoil (203-04) | CY | 159 | $28.00 | $55.00 | $30.00 | $25.00 |
| 5 | Water (203-06) | MG | 1 | $550.00 | $75.00 | $1,625.00 | $150.00 |
| 6 | Sediment removal (209-05) | CY | 14 | $85.00 | $65.00 | $60.00 | $10.00 |
| 7 | Temporary silt fence (without backing) (209-08.03) | LF | 617 | $3.00 | $5.00 | $4.00 | $5.00 |
| 8 | Catch basin filter assembly(type 3) (209-40.43) | EACH | 3 | $850.00 | $1,000.00 | $1,050.00 | $600.00 |
| 9 | Mineral aggregate, type A base, grading D (303-01) | TON | 882 | $54.00 | $65.00 | $51.25 | $57.00 |
| 10 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 103 | $182.00 | $210.00 | $215.00 | $192.00 |
| 11 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 150.70 | $165.00 | $185.00 | $187.00 | $174.00 |
| 12 | Asp. conc. mix(PG64-22) (BPMB-HM) GR. A-S (307-01.20) | TON | 98 | $182.00 | $210.00 | $232.00 | $192.00 |
| 13 | Bituminous material for tack coat (TC) (403-01) | TON | 2.10 | $940.00 | $1,500.00 | $1,400.00 | $987.00 |
| 14 | Saw cutting asphalt pavement (407-20.05) | LF | 515 | $2.75 | $7.00 | $5.85 | $4.00 |
| 15 | Acs mix (PG64-22) grading E shoulder (411-01.07) | TON | 34 | $380.00 | $230.00 | $287.00 | $399.00 |
| 16 | Acs mix(PG64-22) grading D (411-01.10) | TON | 188 | $210.00 | $240.00 | $283.00 | $221.00 |
| 17 | Scoring shoulders (non-continuous) (16IN width) (411-12.02) | LM | 0.09 | $101,155 | $3,000.00 | $2,440.00 | $12,600 |
| 18 | Cold planing bituminous pavement (415-01.01) | TON | 140 | $85.00 | $150.00 | $165.00 | $87.00 |
| 19 | Machined rip-rap (class A-3) (709-05.05) | TON | 89 | $60.00 | $100.00 | $85.00 | $93.00 |
| 20 | Aggregate underdrains (with pipe) (710-02) | LF | 516 | $26.00 | $20.00 | $27.00 | $38.00 |
| 21 | Traffic control (712-01) | LS | 1 | $16,500 | $40,000 | $36,800 | $90,000 |
| 22 | Flexible drums (channelizing) (712-04.01) | EACH | 40 | $28.00 | $35.00 | $35.00 | $30.00 |
| 23 | Signs (construction) (712-06) | SF | 180 | $7.00 | $35.00 | $8.50 | $8.00 |
| 24 | Arrow board (type C) (712-08.03) | EACH | 1 | $825.00 | $3,000.00 | $1,000.00 | $850.00 |
| 25 | Jacked or bored conduit (714-03) | LF | 250 | $8.15 | $30.00 | $47.60 | $10.00 |
| 26 | Direct burial conduit (2" PVC, schedule 40) (714-03.01) | LF | 330 | $11.70 | $20.00 | $22.00 | $12.00 |
| 27 | Pull boxes (type C) (714-05.04) | EACH | 2 | $4,500.00 | $1,500.00 | $1,600.00 | $4,700.00 |
| 28 | Cable (1/C # 8 AWG) (714-06.04) | LF | 1,914 | $1.80 | $2.50 | $3.40 | $2.00 |
| 29 | Remove & relocate light standard (714-08.30) | EACH | 2 | $5,650.00 | $3,500.00 | $7,500.00 | $6,000.00 |
| 30 | Electrical connection (see footnotes sheet L-1) (714-25.01) | LS | 1 | $2,540.00 | $4,000.00 | $2,325.00 | $3,000.00 |
| 31 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 7 | $100.00 | $150.00 | $150.00 | $105.00 |
| 32 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 159 | $25.00 | $30.00 | $28.00 | $26.00 |
| 33 | Plastic pavement marking (stop line) (716-02.05) | LF | 20 | $15.05 | $20.00 | $18.00 | $16.00 |
| 34 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 3 | $251.00 | $300.00 | $280.00 | $263.00 |
| 35 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 404 | $3.00 | $4.00 | $3.40 | $3.20 |
| 36 | Plastic pavement marking (8IN line) (716-02.12) | LM | 0.23 | $11,045 | $15,000 | $13,500 | $11,600 |
| 37 | Painted pavement marking (4" line) (716-05.01) | LM | 0.20 | $3,015.00 | $5,000.00 | $3,500.00 | $3,150.00 |
| 38 | Painted pavement marking (stop line) (716-05.05) | LF | 20 | $10.00 | $15.00 | $12.00 | $11.00 |
| 39 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 0.10 | $20,080 | $25,000 | $22,250 | $21,000 |
| 40 | Mobilization (717-01) | LS | 1 | $21,987 | $45,000 | $81,275 | $65,000 |
| 41 | Geotextile (type III)(erosion control) (740-10.03) | SY | 1,200 | $4.50 | $6.00 | $5.25 | $2.60 |
| 42 | Seeding (without mulch) (801-02) | UNIT | 5.30 | $30.00 | $75.00 | $37.00 | $100.00 |
| 43 | Water (seeding & sodding) (801-03) | MG | 1 | $320.00 | $500.00 | $425.00 | $150.00 |
| 44 | Erosion control blanket (type I) (805-12.01) | SY | 594 | $3.05 | $5.00 | $3.25 | $2.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of October 2, 2026. Compiled by Mirage Metrics.