APAC-Atlantic, Inc.: TDOT bid record
APAC-Atlantic, Inc. submitted 87 bids on Tennessee DOT contracts in the data, from 23 MAR 2018 to 02 OCT 2026, and was the low bidder on 42 of them (48%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $118,345,150
- Latest bid
- 02 OCT 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 3 | 3 | 100% |
| 2020 | 7 | 4 | 57% |
| 2023 | 2 | 1 | 50% |
| 2024 | 15 | 9 | 60% |
| 2025 | 29 | 13 | 45% |
| 2026 | 31 | 12 | 39% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Knox County | 14 | 4 | 29% |
| Hamilton County | 11 | 6 | 55% |
| Blount County | 5 | 3 | 60% |
| Bradley County | 5 | 4 | 80% |
| Grainger County | 5 | 3 | 60% |
| Polk County | 5 | 3 | 60% |
| Monroe County | 4 | 1 | 25% |
| Anderson County | 4 | 0 | 0% |
| Jefferson County | 3 | 2 | 67% |
| Marion County | 3 | 2 | 67% |
| Union County | 2 | 1 | 50% |
| Hamblen County | 2 | 2 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Bituminous material for tack coat (TC) | 403-01 | TON | 61 | 38 (62%) | $800.00 | $969.62 |
| Brooming & degrassing shoulders | 208-01.05 | LM | 68 | 35 (51%) | $987.50 | $1,500.00 |
| Cold planing bituminous pavement | 415-01.01 | TON | 48 | 28 (58%) | $33.22 | $34.00 |
| Signs (construction) | 712-06 | SF | 80 | 26 (33%) | $8.50 | $8.00 |
| Plastic pavement marking (stop line) | 716-02.05 | LF | 71 | 26 (37%) | $12.75 | $17.30 |
| Mineral aggregate, type A base, grading D | 303-01 | TON | 32 | 21 (66%) | $59.23 | $45.00 |
| Flexible drums (channelizing) | 712-04.01 | EACH | 61 | 17 (28%) | $38.00 | $34.50 |
| Plastic pavement marking (turn lane arrow) | 716-02.06 | EACH | 57 | 17 (30%) | $201.25 | $200.68 |
| Asc mix (PG64-22) (BPMLC-HM) grading CS | 307-01.15 | TON | 31 | 16 (52%) | $132.03 | $134.97 |
| Removal of snowplowable reflective marker | 716-01.30 | EACH | 58 | 15 (26%) | $10.03 | $12.00 |
| Snowplowable raised pavement markers (BI-dir) (1 color) | 716-01.21 | EACH | 56 | 12 (21%) | $43.00 | $40.48 |
| Painted pavement marking (6" line) | 716-05.20 | LM | 53 | 12 (23%) | $1,075.00 | $1,400.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Rogers Group, Inc. | 40 | 23 of 40 |
| PRI of East Tennessee Inc. | 32 | 10 of 32 |
| Duracap Asphalt Paving Co., Inc. | 18 | 8 of 18 |
| Wright Brothers Construction Company, Inc. | 14 | 6 of 14 |
| Summers-Taylor, Inc. | 9 | 4 of 9 |
| Southern Constructors, Inc. | 6 | 3 of 6 |
| Wright Brothers Civil Construction, LLC | 4 | 2 of 4 |
| Pave Grade & Aggregate, Inc | 3 | 2 of 3 |
| Jones Bros. Contractors, LLC | 3 | 2 of 3 |
| Adams Contracting, LLC | 2 | 1 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 02 OCT 2026 | CN261076 | Anderson County | The construction of a turn lane on s.r. 61 at the intersection of sinking springs road/lewallen hollow road (l.m. 17.55) in clinton, includi | 3 of 4 | $489,915 | +41% |
| 02 OCT 2026 | CN261073 | Knox County | The concrete pavement repair on i-75 from the i-40 eastbound exit ramp (l.m. 0.00) to the bridge over papermill drive (l.m. 0.30) | 3 of 4 | $1,003,543 | +19% |
| 14 AUG 2026 | CN262056 | Grundy County | The grading, drainage, lighting, and paving on i-24 at the s.r. 50 interchange (l.m. 0.56) (exit 127) | 5 of 5 | $6,137,544 | +36% |
| 26 JUN 2026 | CN261055 | Hawkins County | The resurfacing (microsurface or thin mix overlay) on s.r. 70 from near s.r. 94 (l.m. 12.62) to the hancock county line (l.m. 22.17) | 2 of 2 | $2,046,022 | +8.0% |
| 26 JUN 2026 | CN261056 | Knox County | The resurfacing on u.s. 441 (s.r. 33) from near s.r. 71 (l.m. 5.72) to near central street (l.m. 8.26) | 2 of 3 | $1,906,618 | +15% |
| 26 JUN 2026 | CN261044 | Monroe County | The grading, drainage, signals and paving on s.r. 322 from sheppard road (l.m. 13.34) to s.r. 72 (l.m. 15.53) | 5 of 6 | $25,996,175 | +23% |
| 08 MAY 2026 | CN261031 | Blount County | The resurfacing on s.r. 33 from near s.r. 35 (l.m. 12.35) to near clarks grove road (l.m. 16.08) | 1 of 3 | $1,688,868 | Low, 42% under the second |
| 08 MAY 2026 | CN261035 | Grainger County | The resurfacing on s.r. 375 from s.r. 92 (l.m. 0.00) to near white oak lane (l.m. 5.08) | 1 of 2 | $878,157 | Low, 0.0% under the second |
| 08 MAY 2026 | CN261045 | Grainger County | The resurfacing on u.s. 11w (s.r. 1) from near helton road (l.m. 22.02) to near u.s. 25e (s.r. 32) (l.m. 27.18), including thin epoxy overla | 1 of 3 | $1,419,497 | Low, 4.0% under the second |
| 08 MAY 2026 | CN262042 | Hamilton County | The resurfacing on u.s. 41 (u.s. 64, u.s. 74, s.r. 2) from the marion county line (l.m. 0.00) to near myrtle avenue (l.m. 2.74) | 1 of 2 | $1,476,057 | Low, 4.0% under the second |
| 08 MAY 2026 | CN262043 | Hamilton County | The resurfacing on s.r. 320 from u.s. 11 (u.s. 64, s.r. 2) (l.m. 0.00) to near graysville road (l.m. 3.87) (excludes l.m. 0.75 - 0.99) | 2 of 2 | $3,919,626 | +24% |
| 08 MAY 2026 | CN261037 | Hancock County | The resurfacing on s.r. 31 from near deer run road (l.m. 1.58) to near ben bloomer road (l.m. 8.41) | 2 of 2 | $1,781,316 | +4.0% |
| 08 MAY 2026 | CN261041 | Knox County | The resurfacing on u.s. 11e (u.s. 25w, s.r. 9) from s.r. 168 (l.m. 8.09) to near strawberry plains road (l.m. 13.98) | 1 of 3 | $3,191,512 | Low, 10% under the second |
| 08 MAY 2026 | CN261042 | Knox County | The resurfacing on s.r. 331 from s.r. 131 (l.m. 8.31) to s.r. 61 (l.m. 16.02) | 1 of 3 | $1,438,522 | Low, 19% under the second |
| 08 MAY 2026 | CN261052 | Loudon County | 005,53s002-f8-005 the resurfacing on u.s. 11 (s.r. 2) from near natalie boulevard (l.m. 8.40) to near u.s. 321 (s.r. 73) (l.m. 13.42) | 1 of 3 | $2,336,500 | Low, 24% under the second |
| 08 MAY 2026 | CN261043 | Monroe County | 007,62s360-f8-007 the resurfacing on s.r. 360 from near s.r. 165 (l.m. 0.00) to near ballplay road (l.m. 10.33) and on s.r. 165 from near s. | 1 of 2 | $1,983,438 | Low, 8.0% under the second |
| 20 MAR 2026 | CN261014 | Anderson County | The resurfacing on u.s. 25w (s.r. 9) from i-75 (l.m. 0.00) to near industrial park road (l.m. 7.75) | 2 of 3 | $1,391,362 | +4.0% |
| 20 MAR 2026 | CN262020 | Bradley County | The resurfacing on s.r. 74 from the georgia state line (l.m. 0.00) to south of s.r. 313 (l.m. 9.11), including thin epoxy overlay on bridges | 1 of 2 | $2,412,969 | Low, 17% under the second |
| 20 MAR 2026 | CN261016 | Grainger County | The resurfacing on s.r. 92 from near the jefferson county line (l.m. 0.05) to u.s. 11w (s.r. 1) (l.m. 9.24) and on u.s. 11w (s.r. 1) from ne | 2 of 2 | $4,018,003 | 0.0% |
| 20 MAR 2026 | CN262024 | Hamilton County | The resurfacing on u.s. 41 (s.r. 8) from near u.s. 41 (s.r. 2) (l.m. 5.70) to s.r. 17 (l.m. 8.33) and on u.s. 41 (s.r. 2) from near s.r. 17 | 1 of 2 | $2,618,441 | Low, 1.0% under the second |
| 20 MAR 2026 | CN262026 | Hamilton County | The resurfacing on s.r. 17 from campbell street (l.m. 5.63) to near s.r. 153 (l.m. 8.75) | 2 of 2 | $1,709,336 | +7.0% |
| 20 MAR 2026 | CN262028 | Hamilton County | The resurfacing on s.r. 321 from the georgia state line (l.m. 0.00) to apison pike (l.m. 5.41) | 2 of 2 | $1,562,197 | +7.0% |
| 20 MAR 2026 | CN262027 | Hamilton And Marion Counties | The resurfacing on s.r. 134 from s.r. 156 (l.m. 0.49) in marion county to the georgia state line (l.m. 0.64) in hamilton county | 2 of 2 | $1,866,942 | +17% |
| 20 MAR 2026 | CN261019 | Knox County | The resurfacing on s.r. 62 from near west emory road (l.m. 2.04) to near beaver ridge road (l.m. 8.91) | 3 of 3 | $2,837,050 | +8.0% |
| 20 MAR 2026 | CN261018 | Knox County | The resurfacing on u.s. 11w (s.r. 1) from near historic preservation drive (l.m. 20.41) to s.r. 168 (l.m. 24.21) | 2 of 3 | $2,439,062 | +1.0% |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.