Wright Brothers Construction Company, Inc.: TDOT bid record
Wright Brothers Construction Company, Inc. submitted 31 bids on Tennessee DOT contracts in the data, from 09 FEB 2018 to 08 MAY 2026, and was the low bidder on 17 of them (55%). When it was not low, its total sat a median +6.0% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $73,668,362
- Latest bid
- 08 MAY 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 2 | 1 | 50% |
| 2020 | 3 | 3 | 100% |
| 2023 | 3 | 2 | 67% |
| 2024 | 6 | 4 | 67% |
| 2025 | 8 | 2 | 25% |
| 2026 | 9 | 5 | 56% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Hamilton County | 12 | 6 | 50% |
| Bradley County | 4 | 0 | 0% |
| Hamilton | 3 | 3 | 100% |
| Mcminn County | 2 | 2 | 100% |
| Polk | 2 | 1 | 50% |
| Hamilton And Meigs Counties | 1 | 1 | 100% |
| Sullivan County | 1 | 0 | 0% |
| Bradley And Mcminn Counties | 1 | 1 | 100% |
| Polk County | 1 | 1 | 100% |
| Sequatchie County | 1 | 0 | 0% |
| Mcminn And Polk | 1 | 1 | 100% |
| Bradley | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Signs (construction) | 712-06 | SF | 28 | 19 (68%) | $8.00 | $8.00 |
| Plastic pavement marking (stop line) | 716-02.05 | LF | 26 | 19 (73%) | $11.98 | $17.30 |
| Painted pavement marking (4" line) | 716-05.01 | LM | 19 | 17 (89%) | $1,225.00 | $1,225.00 |
| Changeable message sign unit | 713-16.01 | EACH | 26 | 16 (62%) | $5,600.00 | $6,095.00 |
| Enhanced flatline thermo PVMT MRKNG (6IN line) | 716-12.02 | LM | 24 | 16 (67%) | $7,222.50 | $7,425.00 |
| Removal of snowplowable reflective marker | 716-01.30 | EACH | 21 | 16 (76%) | $9.50 | $12.00 |
| Plastic pavement marking (turn lane arrow) | 716-02.06 | EACH | 20 | 16 (80%) | $187.50 | $200.68 |
| Snowplowable raised pavement markers (BI-dir) (1 color) | 716-01.21 | EACH | 20 | 15 (75%) | $42.23 | $40.48 |
| Flexible drums (channelizing) | 712-04.01 | EACH | 23 | 14 (61%) | $36.20 | $34.50 |
| Trackless tack coat | 403-02.01 | TON | 20 | 14 (70%) | $875.00 | $950.00 |
| Arrow board (type C) | 712-08.03 | EACH | 18 | 14 (78%) | $1,087.50 | $1,170.00 |
| Brooming & degrassing shoulders | 208-01.05 | LM | 20 | 13 (65%) | $1,165.00 | $1,500.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| APAC-Atlantic, Inc. | 14 | 8 of 14 |
| Talley Construction Company, Inc. | 9 | 3 of 9 |
| Rogers Group, Inc. | 4 | 2 of 4 |
| Summers-Taylor, Inc. | 3 | 1 of 3 |
| Jones Bros. Contractors, LLC | 2 | 1 of 2 |
| Tinsley Asphalt, LLC | 1 | 1 of 1 |
| Dement Construction Company, LLC | 1 | 0 of 1 |
| Bell & Associates Construction, LLC | 1 | 0 of 1 |
| Whaley Construction, LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 08 MAY 2026 | CN262042 | Hamilton County | The resurfacing on u.s. 41 (u.s. 64, u.s. 74, s.r. 2) from the marion county line (l.m. 0.00) to near myrtle avenue (l.m. 2.74) | 2 of 2 | $1,539,876 | +4.0% |
| 08 MAY 2026 | CN262043 | Hamilton County | The resurfacing on s.r. 320 from u.s. 11 (u.s. 64, s.r. 2) (l.m. 0.00) to near graysville road (l.m. 3.87) (excludes l.m. 0.75 - 0.99) | 1 of 2 | $3,166,457 | Low, 24% under the second |
| 20 MAR 2026 | CN262020 | Bradley County | The resurfacing on s.r. 74 from the georgia state line (l.m. 0.00) to south of s.r. 313 (l.m. 9.11), including thin epoxy overlay on bridges | 2 of 2 | $2,823,847 | +17% |
| 20 MAR 2026 | CN262024 | Hamilton County | The resurfacing on u.s. 41 (s.r. 8) from near u.s. 41 (s.r. 2) (l.m. 5.70) to s.r. 17 (l.m. 8.33) and on u.s. 41 (s.r. 2) from near s.r. 17 | 2 of 2 | $2,655,234 | +1.0% |
| 20 MAR 2026 | CN262026 | Hamilton County | The resurfacing on s.r. 17 from campbell street (l.m. 5.63) to near s.r. 153 (l.m. 8.75) | 1 of 2 | $1,596,482 | Low, 7.0% under the second |
| 20 MAR 2026 | CN262028 | Hamilton County | The resurfacing on s.r. 321 from the georgia state line (l.m. 0.00) to apison pike (l.m. 5.41) | 1 of 2 | $1,465,269 | Low, 7.0% under the second |
| 06 FEB 2026 | CN262017 | Hamilton County | The resurfacing on s.r. 58 from s.r. 17 (l.m. 2.17) to near 21st street west (l.m. 4.55) | 1 of 2 | $1,350,888 | Low, 15% under the second |
| 06 FEB 2026 | CN262011 | Polk County | The resurfacing on s.r. 314 from u.s. 64 (u.s. 74, s.r. 40) (l.m. 0.00) to u.s. 411 (s.r. 33) (l.m. 6.08) | 1 of 2 | $999,555 | Low, 14% under the second |
| 06 FEB 2026 | CN262012 | Sequatchie County | The resurfacing with cold in-place recycling on s.r. 111 from near lewis chapel road (l.m. 4.32) to near east valley road (l.m. 7.57) | 3 of 3 | $2,829,800 | +9.0% |
| 05 DEC 2025 | CNZ289 | Bradley County | F3-003,06s040-f8-003 the resurfacing on u.s. 64 (s.r. 40) from east of wildwood avenue (l.m. 1.15) to west of lyles road (l.m. 4.96) | 2 of 2 | $3,184,751 | +5.0% |
| 05 DEC 2025 | CNZ328 | Mcminn County | The resurfacing on i-75 from south of county road 50 (l.m. 4.32) to south of county road 130 (l.m. 8.38) | 1 of 2 | $5,063,097 | Low, 16% under the second |
| 15 AUG 2025 | CNZ184 | Hamilton County | The resurfacing on u.s. 27 (s.r. 27) from south of the i-24 overpass (l.m. 5.51) to the georgia state line (l.m. 7.93) | 2 of 2 | $4,068,688 | 0.0% |
| 25 JUL 2025 | CNZ234 | Hamilton County | The resurfacing on s.r. 317 from east of east brainerd road (l.m. 11.78) to west of wesleyan road (l.m. 15.34) | 2 of 2 | $911,332 | +1.0% |
| 09 MAY 2025 | CNZ138 | Hamilton County | The resurfacing on u.s. 127 (s.r. 8) from frazier avenue (l.m. 10.14) to dayton boulevard (l.m. 11.96) | 2 of 2 | $1,901,333 | +4.0% |
| 21 MAR 2025 | CNZ109 | Mcminn County | The resurfacing on i-75 from south of county road 28 (l.m. 2.06) to south of county road 50 (l.m. 4.32) | 1 of 1 | $3,827,545 | Low |
| 07 FEB 2025 | CNZ020 | Bradley County | The resurfacing on u.s. 64 (u.s. 74, s.r. 40) from near lyles road s.e. (l.m. 4.96) to the polk county line (l.m. 9.66) | 2 of 2 | $6,503,469 | +51% |
| 07 FEB 2025 | CNZ034 | Hamilton County | The resurfacing on u.s. 27 (s.r. 29) from s.r. 111 (l.m. 20.76) to near old dayton pike (l.m. 25.72), including thin epoxy overlay | 2 of 3 | $4,199,299 | +1.0% |
| 04 OCT 2024 | CNY261 | Bradley And Mcminn Counties | The resurfacing on i-75 from north of hooper gap road nw (l.m. 15.35) in bradley county to south of county road 28 (l.m. 2.06) in mcminn cou | 1 of 2 | $6,981,857 | Low, 5.0% under the second |
| 16 AUG 2024 | CNY185 | Sullivan County | The grading, drainage, paving, construction of a retaining wall and bridges on s.r. 93 from south of horse creek to north of derby drive (l. | 3 of 3 | $34,580,663 | +48% |
| 10 MAY 2024 | CNY145 | Hamilton And Meigs Counties | 004,61s060-f8-005 the resurfacing on s.r. 60 from s.r. 58 (l.m. 0.17) to the meigs county line (l.m. 1.60) in hamilton county, and from sout | 1 of 3 | $1,185,100 | Low, 4.0% under the second |
| 22 MAR 2024 | CNY095 | Bradley County | The resurfacing on u.s. 11 (s.r. 74) from north of inman street (l.m. 13.87) to north of s.r. 60 (l.m. 15.46) (includes the sb section l.m. | 2 of 2 | $2,010,116 | +6.0% |
| 22 MAR 2024 | CNY098 | Hamilton County | The resurfacing on u.s. 27 (s.r. 29) from south of old dayton pike (l.m. 25.72) to north of coulterville road (l.m. 28.32), including thin e | 1 of 2 | $2,318,110 | Low, 4.0% under the second |
| 09 FEB 2024 | CNY057 | Hamilton County | The resurfacing on s.r. 58 from s.r. 153 (l.m. 4.57) to near eller road (l.m. 6.45) | 1 of 2 | $2,243,632 | Low, 11% under the second |
| 08 DEC 2023 | CNX405 | Bradley | The resurfacing on i-75 from south of mm 18.6 (l.m. 2.99) to north of exit 20 (l.m. 5.35) | 2 of 2 | $3,813,507 | +6.0% |
| 08 DEC 2023 | CNX408 | Hamilton And Meigs | The construction of a small drainage structure on s.r. 60 at l.m. 1.6 | 1 of 3 | $724,604 | Low, 23% under the second |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.