TDOT contract CN262020 bid tabulation

The resurfacing on s.r. 74 from the georgia state line (l.m. 0.00) to south of s.r. 313 (l.m. 9.11), including thin epoxy overlay on bridges. Let by Tennessee DOT on March 20, 2026, Bradley County. 2 bids received; low bid $2,412,969 by APAC-Atlantic, Inc..

Owner
Tennessee DOT
Letting
20 MAR 2026
Pay items
20
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1APAC-Atlantic, Inc.$2,412,969Low
2Wright Brothers Construction Company, Inc.$2,823,847+17%
TDOT contract CN262020: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. APAC-Atlantic, Inc.2. Wright Brothers Construction Company, Inc.
1Brooming & degrassing shoulders (208-01.05)LM19$545.95$935.00
2Trackless tack coat (403-02.01)TON62$977.50$900.00
3Acs mix(PG64-22) grading D (411-01.10)TON9,440$156.64$165.00
4Longitudinal joint sealant (411-01.21)LM9.10$2,835.00$3,200.00
5Scoring for centerline rumble (4IN width-24IN spacing) (411-12.05)LM18.20$477.75$670.00
6Cold planing bituminous pavement (415-01.01)TON9,351$27.43$58.00
7Guardrail delineation enhancement (705-04.21)LF5,835$2.63$2.70
8Traffic control (712-01)LS1$47,513$55,000
9Flexible drums (channelizing) (712-04.01)EACH16$31.50$33.00
10Signs (construction) (712-06)SF1,034$6.83$7.25
11Changeable message sign unit (713-16.01)EACH2$5,040.00$5,400.00
12Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH620$39.90$42.25
13Removal of snowplowable reflective marker (716-01.30)EACH620$8.93$9.45
14Plastic pavement marking(channelization striping) (716-02.04)SY110$22.05$23.30
15Plastic pavement marking (stop line) (716-02.05)LF458$10.50$11.00
16Plastic word pavement marking (school) (716-03.04)EACH2$262.50$280.00
17Painted pavement marking (6" line) (716-05.20)LM36.40$1,155.00$1,225.00
18Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM36.40$6,431.25$6,825.00
19Mobilization (717-01)LS1$76,704$69,200
20Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01)SY2,659$37.96$44.00
TDOT contract CN262020: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of March 20, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy