TDOT contract CNZ034 bid tabulation
The resurfacing on u.s. 27 (s.r. 29) from s.r. 111 (l.m. 20.76) to near old dayton pike (l.m. 25.72), including thin epoxy overlay. Let by Tennessee DOT on February 7, 2025, Hamilton County. 3 bids received; low bid $4,170,000 by Rogers Group, Inc..
- Owner
- Tennessee DOT
- Letting
- 07 FEB 2025
- Pay items
- 38
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rogers Group, Inc. | $4,170,000 | Low |
| 2 | Wright Brothers Construction Company, Inc. | $4,199,299 | +1.0% |
| 3 | APAC-Atlantic, Inc. | $4,696,315 | +13% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rogers Group, Inc. | 2. Wright Brothers Construction Company, Inc. | 3. APAC-Atlantic, Inc. |
|---|---|---|---|---|---|---|
| 1 | Brooming & degrassing shoulders (208-01.05) | LM | 19.90 | $1,150.00 | $950.00 | $806.64 |
| 2 | Mineral aggregate, type A base, grading D (303-01) | TON | 2,944 | $60.00 | $60.00 | $64.68 |
| 3 | Trackless tack coat (403-02.01) | TON | 102 | $905.00 | $875.00 | $799.71 |
| 4 | Acs mix (PG64-22) grading E shoulder (411-01.07) | TON | 3,867 | $122.00 | $140.00 | $146.67 |
| 5 | Longitudinal joint sealant (411-01.21) | LM | 21.30 | $2,800.00 | $2,900.00 | $3,233.00 |
| 6 | Acs mix(PG70-22) grading D (411-02.10) | TON | 11,620 | $155.00 | $155.00 | $178.36 |
| 7 | Scoring shoulders (continuous) (16IN width) (411-12.01) | LM | 9.50 | $525.00 | $575.00 | $1,159.00 |
| 8 | Scoring shoulders (non-continuous) (16IN width) (411-12.02) | LM | 9.90 | $525.00 | $575.00 | $1,159.00 |
| 9 | Cold planing bituminous pavement (415-01.01) | TON | 15,340 | $35.00 | $31.30 | $34.00 |
| 10 | Cleaning and sealing joints (502-01) | LF | 20,300 | $5.50 | $4.35 | $6.71 |
| 11 | Resealing joints (silicone sealant) (502-08.02) | LF | 2,030 | $7.40 | $4.35 | $8.97 |
| 12 | Grinding concrete pavement (503-01) | SY | 11,805 | $5.05 | $6.95 | $6.76 |
| 13 | Traffic control (712-01) | LS | 1 | $106,136 | $140,000 | $159,095 |
| 14 | Flexible drums (channelizing) (712-04.01) | EACH | 261 | $42.50 | $46.50 | $51.67 |
| 15 | Signs (construction) (712-06) | SF | 1,902 | $8.30 | $9.00 | $10.07 |
| 16 | Arrow board (type C) (712-08.03) | EACH | 2 | $1,305.00 | $1,400.00 | $1,586.00 |
| 17 | Changeable message sign unit (713-16.01) | EACH | 6 | $8,825.00 | $9,675.00 | $10,736 |
| 18 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 895 | $37.25 | $41.90 | $46.36 |
| 19 | Removal of snowplowable reflective marker (716-01.30) | EACH | 895 | $11.00 | $11.00 | $12.20 |
| 20 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 242 | $21.30 | $27.50 | $30.50 |
| 21 | Plastic pavement marking (stop line) (716-02.05) | LF | 490 | $11.00 | $13.20 | $14.64 |
| 22 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 26 | $175.00 | $193.00 | $213.50 |
| 23 | Plastic pavement marking (24" barrier line) (716-02.07) | LF | 713 | $10.00 | $6.30 | $7.02 |
| 24 | Plastic word pavement marking (school) (716-03.04) | EACH | 4 | $400.00 | $465.00 | $518.50 |
| 25 | Plastic pavement marking (lane reduction arrow) (716-04.14) | EACH | 4 | $275.00 | $300.00 | $335.50 |
| 26 | Painted pavement marking (4" line) (716-05.01) | LM | 22.60 | $930.00 | $1,210.00 | $1,647.00 |
| 27 | Painted pavement marking (stop line) (716-05.05) | LF | 490 | $3.50 | $5.50 | $6.10 |
| 28 | Painted pavement marking (6" line) (716-05.20) | LM | 2.65 | $1,055.00 | $1,375.00 | $1,525.00 |
| 29 | Contrast pavement marking 6" (716-09.86) | LM | 2.65 | $45,640 | $46,700 | $57,950 |
| 30 | Contrast pavement marking 6" dotted (716-09.90) | LF | 1,740 | $8.30 | $13.45 | $14.95 |
| 31 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 22.60 | $6,170.00 | $6,600.00 | $7,930.00 |
| 32 | Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05) | LF | 1,020 | $1.45 | $2.50 | $2.75 |
| 33 | Enhanced flat line thermo (8IN line) (716-12.06) | LF | 2,174 | $2.25 | $2.50 | $2.75 |
| 34 | Mobilization (717-01) | LS | 1 | $150,000 | $95,000 | $45,370 |
| 35 | Saw slot (730-14.02) | LF | 3,390 | $6.00 | $6.60 | $10.37 |
| 36 | Loop wire (730-14.03) | LF | 7,250 | $1.00 | $1.10 | $1.22 |
| 37 | Concrete repairs (604-10.53) | SY | 6 | $1,065.00 | $1,100.00 | $1,195.60 |
| 38 | Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01) | SY | 1,342 | $48.35 | $49.70 | $54.24 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of February 7, 2025. Compiled by Mirage Metrics.