Whaley Construction, LLC: TDOT bid record
Whaley Construction, LLC submitted 17 bids on Tennessee DOT contracts in the data, from 23 MAR 2018 to 02 OCT 2026, and was the low bidder on 8 of them (47%). When it was not low, its total sat a median +33% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $48,778,501
- Latest bid
- 02 OCT 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 1 | 0 | 0% |
| 2020 | 3 | 1 | 33% |
| 2023 | 3 | 1 | 33% |
| 2024 | 2 | 2 | 100% |
| 2025 | 2 | 1 | 50% |
| 2026 | 6 | 3 | 50% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Anderson County | 2 | 2 | 100% |
| Monroe County | 1 | 1 | 100% |
| Roane County | 1 | 1 | 100% |
| Cumberland County | 1 | 0 | 0% |
| Bradley County | 1 | 0 | 0% |
| Hawkins County | 1 | 1 | 100% |
| Knox County | 1 | 0 | 0% |
| Claiborne County | 1 | 0 | 0% |
| Cocke County | 1 | 1 | 100% |
| Campbell | 1 | 0 | 0% |
| Knox | 1 | 0 | 0% |
| Bradley | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Machined rip-rap (class A-1) | 709-05.06 | TON | 13 | 12 (92%) | $55.00 | $70.00 |
| Machined rip-rap (class A-3) | 709-05.05 | TON | 14 | 9 (64%) | $58.98 | $67.50 |
| Granular backfill (bridges) | 303-01.02 | TON | 10 | 9 (90%) | $52.50 | $73.33 |
| Mineral aggregate, type A base, grading D | 303-01 | TON | 15 | 8 (53%) | $50.40 | $45.00 |
| Sediment removal | 209-05 | CY | 14 | 8 (57%) | $19.01 | $31.36 |
| Mineral aggregate (size 57) | 303-10.01 | TON | 14 | 8 (57%) | $53.06 | $65.00 |
| Machined rip-rap (class B) | 709-05.08 | TON | 10 | 8 (80%) | $55.12 | $67.00 |
| Water | 203-06 | MG | 13 | 7 (54%) | $100.00 | $22.20 |
| Placing and spreading topsoil | 203-04 | CY | 11 | 7 (64%) | $15.00 | $23.75 |
| Flexible drums (channelizing) | 712-04.01 | EACH | 15 | 5 (33%) | $38.50 | $34.50 |
| Bituminous material for tack coat (TC) | 403-01 | TON | 15 | 5 (33%) | $1,100.00 | $969.62 |
| Water (seeding & sodding) | 801-03 | MG | 14 | 5 (36%) | $110.00 | $100.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Charles Blalock & Sons, Inc. | 10 | 3 of 10 |
| Southern Constructors, Inc. | 7 | 2 of 7 |
| Summers-Taylor, Inc. | 6 | 2 of 6 |
| Jones Bros. Contractors, LLC | 4 | 2 of 4 |
| Twin K Construction, Inc. | 3 | 2 of 3 |
| Mid-State Construction Company, Inc. | 3 | 2 of 3 |
| Cleary Construction, Inc. | 3 | 2 of 3 |
| King General Contractors, Inc. | 3 | 1 of 3 |
| Wright Brothers Civil Construction, LLC | 2 | 1 of 2 |
| Bell & Associates Construction, LLC | 2 | 0 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 02 OCT 2026 | CN261074 | Claiborne County | The construction of a concrete box beam bridge on s.r. 33 over south fork sycamore creek (l.m. 20.56), including grading, drainage, and pavi | 4 of 5 | $3,498,103 | +32% |
| 02 OCT 2026 | CN261069 | Cocke County | The rehabilitation of the bridge on i-40 over the pigeon river and hartford road near l.m. 15.05 | 1 of 4 | $2,042,519 | Low, 12% under the second |
| 14 AUG 2026 | CN261061 | Knox County | The intersection improvements on s.r. 131 (emory road) at harrell road/carpenter road (l.m. 9.5), including grading, drainage, signals, and | 4 of 4 | $10,499,161 | +33% |
| 26 JUN 2026 | CN261057 | Hawkins County | The grading, drainage, construction of bridges, signals, and paving on s.r. 31 near u.s. 11w (s.r. 1) in mooresburg (l.m. 0.100) to adams la | 1 of 4 | $16,312,114 | Low, 13% under the second |
| 20 MAR 2026 | CN261015 | Anderson County | The grading, drainage, construction of a concrete box bridge, and paving on a s.i.a. route from u.s. 441 (s.r. 71) to sawmill road, serving | 1 of 5 | $4,422,359 | Low, 8.0% under the second |
| 06 FEB 2026 | CN262019 | Bradley County | The construction of a concrete bulb-tee beam bridge on old lower river road over south mouse creek (l.m. 13.09), including grading, drainage | 5 of 5 | $4,731,298 | +131% |
| 15 AUG 2025 | CNZ206 | Cumberland County | The construction of a concrete bulb-tee beam bridge on u.s. 70n (s.r. 24) over the obed river (l.m. 15.37) in crossville, including grading, | 4 of 4 | $9,748,860 | +79% |
| 27 JUN 2025 | CNZ178 | Roane County | The construction of a concrete bulb-tee beam bridge on u.s. 27 (s.r. 29) over u.s. 27 (s.r. 29)/s.r. 61 (l.m. 12.10), including grading, dra | 1 of 7 | $4,478,908 | Low, 0.0% under the second |
| 06 DEC 2024 | CNY279 | Anderson County | The construction of a concrete i-beam bridge on s.r. 61 over brushy creek (l.m. 3.98), including grading, drainage, and paving | 1 of 3 | $8,219,307 | Low, 14% under the second |
| 04 OCT 2024 | CNY221 | Monroe County | The grading, drainage, construction of a concrete bulb-tee beam bridge, signals, and paving on s.r. 322 over i-75, supporting red stag fulfi | 1 of 3 | $10,945,356 | Low, 1.0% under the second |
| 08 DEC 2023 | CNX399 | Blount | The repair of the bridge on s.r. 334 over the csx railroad (l.m. 0.56) in alcoa | 1 of 3 | $1,921,465 | Low, 6.0% under the second |
| 08 DEC 2023 | CNX350 | Hamblen | The grading, drainage, signals and paving on u.s. 25e (s.r. 32) at the intersection of progress parkway/thoroughbred run road in morristown | 2 of 5 | $5,475,509 | +10% |
| 08 DEC 2023 | CNX347 | Polk | The construction of a concrete i-beam bridge on s.r. 68 over brush creek (l.m. 16.39), including grading, drainage, and paving | 2 of 2 | $8,380,535 | +45% |
| 26 JUN 2020 | CNU227 | Bradley | The construction of small drainage structures on s.r. 60 (l.m. 15.85 and l.m. 15.90) | 1 of 2 | $436,472 | Low, 23% under the second |
| 15 MAY 2020 | CNU220 | Campbell | The emergency slope stabilization on i-75 near m.m. 143.2 (l.m. 13.4) | 2 of 3 | $2,227,787 | +24% |
| 15 MAY 2020 | CNU222 | Knox | The emergency slope stabilization on s.r. 332 near l.m. 2.40 | 5 of 5 | $1,475,307 | +43% |
| 23 MAR 2018 | CNS013 | Sevier | The grading, drainage, construction of a concrete i-beam bridge and paving on winfield dunn parkway/snyder road from north of lenz drive to | 2 of 4 | $2,676,165 | +6.0% |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.