TDOT contract CNZ206 bid tabulation
The construction of a concrete bulb-tee beam bridge on u.s. 70n (s.r. 24) over the obed river (l.m. 15.37) in crossville, including grading, drainage, and paving. Let by Tennessee DOT on August 15, 2025, Cumberland County. 4 bids received; low bid $5,442,181 by Mid-State Construction Company, Inc..
- Owner
- Tennessee DOT
- Letting
- 15 AUG 2025
- Pay items
- 191
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Mid-State Construction Company, Inc. | $5,442,181 | Low |
| 2 | Dement Construction Group, LLC | $5,726,562 | +5.0% |
| 3 | Summers-Taylor, Inc. | $5,848,503 | +7.0% |
| 4 | Whaley Construction, LLC | $9,748,860 | +79% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mid-State Construction Company, Inc. | 2. Dement Construction Group, LLC | 3. Summers-Taylor, Inc. | 4. Whaley Construction, LLC |
|---|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $34,500 | $40,000 | $62,600 | $45,000 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $55,207 | $60,000 | $37,200 | $509,810 |
| 3 | Removal of structures and obstructions (202-01.01) | LS | 1 | $3,583.47 | $14,000 | $7,440.00 | $150,000 |
| 4 | Removal of structures (wingwall, LT.63+16.81 sta.) (202-04.01) | LS | 1 | $5,496.22 | $4,000.00 | $20,600 | $50,000 |
| 5 | Road & drainage excavation (unclassified) (203-01) | CY | 8,472 | $28.00 | $38.70 | $40.00 | $125.00 |
| 6 | Water (203-06) | MG | 23 | $28.75 | $47.00 | $57.00 | $140.00 |
| 7 | Furnishing & spreading topsoil (203-07) | CY | 584 | $24.15 | $42.00 | $112.00 | $75.00 |
| 8 | Construction of haul road (203-50) | LS | 1 | $235,303 | $200,000 | $112,000 | $370,000 |
| 9 | 10" temporary slope drain (209-02.04) | LF | 196 | $20.84 | $17.00 | $51.00 | $125.00 |
| 10 | Sediment removal (209-05) | CY | 101 | $23.40 | $40.50 | $52.00 | $15.00 |
| 11 | Temporary silt fence (with backing) (209-08.02) | LF | 3,040 | $6.86 | $4.40 | $5.00 | $5.00 |
| 12 | Enhanced rock check dam (209-08.08) | EACH | 8 | $1,115.55 | $890.00 | $1,550.00 | $980.00 |
| 13 | Filter sock check dam (209-08.09) | EACH | 20 | $341.37 | $290.00 | $328.00 | $320.00 |
| 14 | Sandbags (209-09.01) | BAG | 660 | $10.92 | $8.60 | $6.00 | $5.00 |
| 15 | Sediment filter bag (15' X 15') (209-09.03) | EACH | 6 | $589.10 | $310.00 | $1,300.00 | $1,850.00 |
| 16 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 25 | $13.43 | $10.00 | $6.00 | $15.00 |
| 17 | Catch basin protection (type D) (209-40.33) | EACH | 2 | $696.07 | $575.00 | $651.00 | $632.50 |
| 18 | Temporary in stream diversion (209-65.04) | LF | 100 | $133.18 | $60.00 | $144.00 | $171.00 |
| 19 | Mineral aggregate, type A base, grading D (303-01) | TON | 2,701 | $52.90 | $45.00 | $44.00 | $60.50 |
| 20 | Mineral aggregate (size 57) (303-10.01) | TON | 1,284 | $47.87 | $65.00 | $52.00 | $55.00 |
| 21 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 415 | $166.75 | $145.00 | $164.00 | $198.00 |
| 22 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 306 | $201.25 | $175.00 | $198.00 | $258.50 |
| 23 | Bituminous material for prime coat (PC) (402-01) | TON | 6.40 | $1,265.00 | $1,100.00 | $1,250.00 | $1,595.00 |
| 24 | Aggregate for cover material (PC) (402-02) | TON | 23 | $189.75 | $165.00 | $187.00 | $352.00 |
| 25 | Bituminous material for tack coat (TC) (403-01) | TON | 2.40 | $1,265.00 | $1,100.00 | $1,250.00 | $1,100.00 |
| 26 | Saw cutting asphalt pavement (407-20.05) | LF | 90 | $23.00 | $30.00 | $13.50 | $10.00 |
| 27 | Acs mix(PG64-22) grading D (411-01.10) | TON | 311 | $212.75 | $185.00 | $210.00 | $297.00 |
| 28 | Scoring shoulders (continuous) (16IN width) (411-12.01) | LM | 0.21 | $1,725.00 | $1,500.00 | $1,700.00 | $1,650.00 |
| 29 | Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03) | LM | 0.10 | $1,725.00 | $1,500.00 | $1,700.00 | $1,650.00 |
| 30 | 54" concrete pipe culvert (class III) (607-10.02) | LF | 20 | $508.46 | $418.50 | $612.00 | $500.00 |
| 31 | 18" pipe culvert (side drain) (607-39.02) | LF | 121 | $72.21 | $108.90 | $212.00 | $250.00 |
| 32 | 24" pipe culvert (side drain) (607-39.03) | LF | 73 | $93.65 | $131.50 | $223.00 | $275.00 |
| 33 | 18" pipe drain (bridge drain) (610-07.03) | LF | 80 | $152.11 | $109.00 | $257.00 | $250.00 |
| 34 | Manholes, > 8' - 12' depth (611-01.03) | EACH | 1 | $31,783 | $12,000 | $26,300 | $12,500 |
| 35 | Class A concrete (pipe endwalls) (611-07.01) | CY | 9 | $1,598.81 | $1,790.00 | $2,400.00 | $1,500.00 |
| 36 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 378 | $2.75 | $3.50 | $3.45 | $7.00 |
| 37 | 18IN endwall (side drain) (611-07.31) | EACH | 6 | $4,005.34 | $5,000.00 | $6,400.00 | $7,500.00 |
| 38 | 24IN endwall (side drain) (611-07.32) | EACH | 2 | $6,322.21 | $6,500.00 | $7,780.00 | $8,500.00 |
| 39 | Capping existing catchbasin (611-09.03) | EACH | 1 | $3,439.80 | $1,700.00 | $6,300.00 | $2,500.00 |
| 40 | 24" temporary drainage pipe (621-03.03) | LF | 52 | $90.53 | $90.00 | $229.00 | $300.00 |
| 41 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 250 | $38.53 | $33.50 | $38.00 | $36.85 |
| 42 | GR terminaltrailing end (type 13) MASH TL-3 (705-06.10) | EACH | 2 | $1,811.25 | $1,575.00 | $1,780.00 | $1,732.50 |
| 43 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 2 | $1,725.00 | $1,500.00 | $1,700.00 | $1,650.00 |
| 44 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 4 | $3,392.50 | $2,950.00 | $3,340.00 | $3,245.00 |
| 45 | Thrie beam bridge transition MASH TL-3 (705-06.25) | EACH | 2 | $2,760.00 | $2,400.00 | $2,720.00 | $2,640.00 |
| 46 | Guardrail removed (706-01) | LF | 630 | $0.58 | $0.50 | $2.00 | $2.00 |
| 47 | Michigan and modified michigan end shoe (706-10.80) | EACH | 2 | $57.50 | $50.00 | $56.00 | $55.00 |
| 48 | Chain link fence (6 foot) (707-01.11) | LF | 618 | $26.45 | $20.55 | $26.00 | $25.30 |
| 49 | End & corner post assembly(chain-link fence 6') (707-01.12) | EACH | 12 | $460.00 | $457.80 | $453.00 | $440.00 |
| 50 | Gate - chain-link fence-6 foot (gate) (707-01.13) | EACH | 1 | $2,070.00 | $1,736.90 | $2,040.00 | $1,980.00 |
| 51 | Removal of fence (chain link) (707-06.01) | LF | 568 | $6.90 | $6.20 | $7.00 | $165.00 |
| 52 | Removal of gate (chain-link) (707-06.02) | EACH | 1 | $172.50 | $458.00 | $170.00 | $330.00 |
| 53 | High-visibility construction fence (707-08.11) | LF | 1,800 | $4.33 | $3.20 | $3.60 | $3.30 |
| 54 | Markers (concrete R.O.W. posts) (708-02.01) | EACH | 11 | $345.00 | $375.00 | $340.00 | $1,000.00 |
| 55 | Rubble stone rip-rap (709-01.01) | CY | 5 | $991.58 | $500.00 | $572.00 | $125.00 |
| 56 | Machined rip-rap (class A-3) (709-05.05) | TON | 100 | $57.63 | $80.00 | $68.00 | $50.00 |
| 57 | Machined rip-rap (class A-1) (709-05.06) | TON | 840 | $51.79 | $65.00 | $63.00 | $50.00 |
| 58 | Machined rip-rap (class B) (709-05.08) | TON | 1,548 | $57.52 | $59.00 | $55.00 | $50.00 |
| 59 | Traffic control (712-01) | LS | 1 | $16,741 | $12,100 | $9,700.00 | $50,000 |
| 60 | Warning lights (type A) (712-05.01) | EACH | 16 | $27.60 | $20.00 | $27.00 | $26.40 |
| 61 | Signs (construction) (712-06) | SF | 337 | $8.91 | $7.00 | $9.00 | $8.50 |
| 62 | Temporary barricades (type III) (712-07.03) | LF | 96 | $16.10 | $28.00 | $16.00 | $15.40 |
| 63 | Class A concrete (foundation for sign supports) (713-01.01) | CY | 0.72 | $632.50 | $590.00 | $623.00 | $605.00 |
| 64 | Steel bar reinforcement(foundation for sign supports) (713-01.02) | LB | 195 | $3.74 | $5.81 | $3.70 | $3.60 |
| 65 | Steel I-beams & WF-beams(breakaway) sign support (713-06) | LB | 726 | $6.33 | $7.63 | $6.20 | $6.05 |
| 66 | Perforated/knockout square tube post (713-11.02) | LB | 810 | $4.49 | $3.65 | $4.40 | $4.30 |
| 67 | P post slip base (713-11.21) | EACH | 2 | $747.50 | $870.00 | $736.00 | $715.00 |
| 68 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 42 | $18.98 | $14.21 | $19.00 | $18.70 |
| 69 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 29 | $20.53 | $14.34 | $20.00 | $20.10 |
| 70 | Extruded aluminum panel signs (713-14) | SF | 112 | $32.20 | $35.08 | $32.00 | $30.80 |
| 71 | Removal of signs, posts and footings (713-15) | LS | 1 | $345.00 | $1,126.00 | $340.00 | $330.00 |
| 72 | Changeable message sign unit (713-16.01) | EACH | 2 | $6,095.00 | $5,975.00 | $6,000.00 | $5,830.00 |
| 73 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 32 | $86.25 | $75.00 | $85.00 | $93.50 |
| 74 | Removal of snowplowable reflective marker (716-01.30) | EACH | 12 | $57.50 | $50.00 | $57.00 | $27.50 |
| 75 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 5 | $28.75 | $25.00 | $29.00 | $44.00 |
| 76 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 0.90 | $11,500 | $10,000 | $11,325 | $9,350.00 |
| 77 | Preformed permanent tape (6IN line) (716-15.10) | LF | 952 | $8.05 | $7.00 | $8.00 | $6.05 |
| 78 | Mobilization (717-01) | LS | 1 | $391,641 | $566,800 | $490,000 | $940,400 |
| 79 | Geogrid reinforcement type 2 (740-07.04) | SY | 1,414 | $6.39 | $7.50 | $5.50 | $3.55 |
| 80 | Geotextile (type III)(erosion control) (740-10.03) | SY | 584 | $5.75 | $4.00 | $4.50 | $3.50 |
| 81 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 462 | $6.10 | $66.00 | $6.00 | $5.00 |
| 82 | Temporary seeding (with mulch) (801-01.07) | UNIT | 95 | $40.25 | $35.00 | $40.00 | $38.50 |
| 83 | Natve seed MX final stablizatn of slopes (801-01.38) | UNIT | 5 | $293.25 | $225.00 | $289.00 | $280.50 |
| 84 | Water (seeding & sodding) (801-03) | MG | 47 | $74.75 | $65.00 | $75.00 | $52.00 |
| 85 | Acer negundo (box elder 2-5FT CNTNR GRWN) (802-11.01) | EACH | 7 | $138.00 | $120.00 | $136.00 | $132.00 |
| 86 | Acer rubrum (red maple 2-5FT CNTNR GRWN) (802-11.02) | EACH | 7 | $138.00 | $120.00 | $136.00 | $132.00 |
| 87 | Betula nigra (river birch 2-5FT CNTNR GRWN) (802-11.07) | EACH | 7 | $138.00 | $120.00 | $136.00 | $132.00 |
| 88 | Quercus alba (white oak 2-5FT CNTNR GRWN) (802-11.29) | EACH | 7 | $138.00 | $120.00 | $136.00 | $132.00 |
| 89 | Ulmus americana (american elm 2-5FT CNTNR GRWN) (802-11.44) | EACH | 7 | $138.00 | $120.00 | $136.00 | $132.00 |
| 90 | Sodding (new sod) (803-01) | SY | 3,504 | $7.71 | $6.70 | $7.60 | $7.40 |
| 91 | Removal of structures (existing bridge no. 18-SR24-15.37) (202-04.01) | LS | 1 | $255,749 | $300,000 | $180,000 | $775,118 |
| 92 | Dry excavation (bridges) (204-02.01) | CY | 137 | $29.47 | $40.00 | $53.00 | $82.50 |
| 93 | Wet excavation (bridges) (204-03.01) | CY | 44 | $67.19 | $50.00 | $71.00 | $128.50 |
| 94 | Rock excavation (bridges) (204-04.01) | CY | 200 | $246.00 | $60.00 | $453.00 | $210.10 |
| 95 | Core drilling and sampling (204-05.01) | LF | 62 | $57.50 | $200.00 | $244.00 | $225.00 |
| 96 | Foundation preparation(pier no. 1, sta 59+22.00) (204-10.01) | LS | 1 | $24,556 | $25,000 | $60,000 | $20,000 |
| 97 | Granular backfill (bridges) (303-01.02) | TON | 65 | $51.78 | $60.00 | $60.00 | $55.00 |
| 98 | Class A concrete (leveling) (604-01.32) | CY | 60 | $509.60 | $500.00 | $435.00 | $850.00 |
| 99 | Epoxy coated reinforcing steel (604-02.03) | LB | 83,816 | $1.99 | $1.86 | $1.45 | $2.05 |
| 100 | Class A concrete (bridges) (604-03.01) | CY | 194 | $1,521.57 | $1,500.00 | $1,520.00 | $1,526.80 |
| 101 | Steel bar reinforcement (bridges) (604-03.02) | LB | 33,921 | $1.55 | $1.73 | $1.45 | $2.60 |
| 102 | Pavement @ bridge ends (604-03.04) | SY | 225 | $445.29 | $400.00 | $432.00 | $555.00 |
| 103 | Class D concrete (bridge deck) (604-03.09) | CY | 324 | $1,158.45 | $1,500.00 | $1,250.00 | $1,650.00 |
| 104 | Applied texture finish (new structures) (604-04.01) | SY | 1,938 | $10.93 | $9.50 | $11.00 | $19.00 |
| 105 | Bridge deck grooving (mechanical) (604-05.31) | SY | 1,306 | $10.14 | $5.64 | $7.00 | $21.29 |
| 106 | Prestressed concrete bulb tee beam (6" web)(BT-72) (615-01.12) | LF | 1,168 | $527.06 | $450.00 | $564.00 | $544.00 |
| 107 | Conc parapet single slope (STD-1-1SS) (620-05.01) | LF | 554 | $126.67 | $135.00 | $150.00 | $170.00 |
| 108 | 6" perforated pipe with vertical drain system (710-09.01) | LF | 151 | $62.69 | $70.00 | $36.00 | $45.00 |
| 109 | 6" pipe underdrain (710-09.02) | LF | 88 | $42.62 | $15.00 | $28.00 | $25.00 |
| 110 | Pole 40FT class 2 wood (790-03.01) | EACH | 3 | $2,380.50 | $2,070.00 | $1,600.00 | $2,030.00 |
| 111 | Pole 40FT class 4 wood (790-03.03) | EACH | 3 | $2,213.75 | $1,925.00 | $1,360.00 | $1,795.00 |
| 112 | Pole 55FT class 3 wood (790-06.03) | EACH | 1 | $3,593.75 | $3,125.00 | $2,290.00 | $2,785.00 |
| 113 | 1PH dead end 25KV (790-22.13) | EACH | 1 | $396.75 | $345.00 | $996.00 | $588.50 |
| 114 | 1PH dde tangent 25KV (790-22.16) | EACH | 1 | $695.75 | $605.00 | $1,390.00 | $1,160.50 |
| 115 | 1PH SGL dead end xarm 25KV (790-22.18) | EACH | 1 | $1,276.50 | $1,110.00 | $1,470.00 | $1,240.00 |
| 116 | 3PH crossarm DBL LRG cond 25KV (790-26.02) | EACH | 1 | $2,507.00 | $2,180.00 | $2,520.00 | $2,136.75 |
| 117 | 3PH vertical med angle 25KV (790-26.17) | EACH | 1 | $1,242.00 | $1,080.00 | $1,810.00 | $1,946.00 |
| 118 | 3PH crossarm dde 25KV (790-26.25) | EACH | 1 | $2,972.75 | $2,585.00 | $1,920.00 | $3,527.00 |
| 119 | 3PH crossarm dead end 25KV (790-26.26) | EACH | 1 | $2,116.00 | $1,840.00 | $2,510.00 | $2,345.00 |
| 120 | 3PH crossarm DBL dde 25KV (790-26.27) | EACH | 1 | $5,169.25 | $4,495.00 | $3,050.00 | $3,252.00 |
| 121 | 3PH DBL 10FT xarm dde 25KV (790-26.28) | EACH | 1 | $3,961.75 | $3,445.00 | $2,750.00 | $3,272.00 |
| 122 | 3PH dde unbalanced load 25KV (790-26.29) | EACH | 1 | $4,766.75 | $4,145.00 | $4,230.00 | $3,541.00 |
| 123 | 3PH crossarm 10FT LRG cond 25KV (790-26.38) | EACH | 1 | $1,621.50 | $1,410.00 | $1,400.00 | $1,616.00 |
| 124 | Secondary conductor 2 AL triplex (790-30.13) | LF | 109 | $8.15 | $7.09 | $7.50 | $6.55 |
| 125 | Service assembly-pole type (790-31.02) | EACH | 6 | $126.50 | $110.00 | $406.00 | $163.65 |
| 126 | Service conductor 2 AL triplex (790-31.11) | LF | 29 | $5.75 | $5.00 | $7.50 | $6.60 |
| 127 | Down guy - through bolt type (790-32.01) | EACH | 1 | $356.50 | $310.00 | $345.00 | $433.15 |
| 128 | Down guy - through bolt type heavy duty (790-32.02) | EACH | 1 | $494.50 | $430.00 | $410.00 | $496.50 |
| 129 | Down guy - insulated (790-32.06) | EACH | 13 | $494.50 | $430.00 | $415.00 | $501.90 |
| 130 | Guy guard (790-32.23) | EACH | 13 | $28.75 | $25.00 | $42.00 | $23.40 |
| 131 | Rock anchor guy bolt type (790-33.18) | EACH | 13 | $1,293.75 | $1,125.00 | $971.00 | $728.75 |
| 132 | OH cond 1/0 6/1 acsr raven (790-40.03) | LF | 3,432 | $2.93 | $2.55 | $4.50 | $3.85 |
| 133 | OH cond 3/0 6/1 acsr pigeon (790-40.05) | LF | 638 | $3.61 | $3.14 | $5.00 | $4.45 |
| 134 | OH cond 795 37 aac arbutus (790-40.49) | LF | 1,914 | $8.19 | $7.12 | $9.40 | $9.05 |
| 135 | 1PH transformer conv W/pole MTD fuse & LA (790-46.02) | EACH | 1 | $1,477.75 | $1,285.00 | $2,070.00 | $1,025.75 |
| 136 | 1PH transformer conv W/xarm MTD fuse & LA (790-46.03) | EACH | 2 | $1,477.75 | $1,285.00 | $2,070.00 | $1,080.75 |
| 137 | 10KVA 1PH OH xformer 7.2KV 120/240 (790-52.03) | EACH | 2 | $1,305.25 | $1,135.00 | $1,560.00 | $1,080.75 |
| 138 | 50KVA 1PH OH xformer 7.2KV dual voltage (790-52.12) | EACH | 1 | $1,477.75 | $1,285.00 | $2,960.00 | $1,080.75 |
| 139 | Goab switch 25KV (790-59.06) | EACH | 1 | $11,310 | $9,835.00 | $9,830.00 | $12,560 |
| 140 | GND-assy GND rod with aluminum (790-69.09) | EACH | 5 | $419.75 | $365.00 | $950.00 | $405.75 |
| 141 | Street light (70W LED) (790-70.22) | EACH | 1 | $1,282.25 | $1,115.00 | $600.00 | $460.75 |
| 142 | Remove wire (790-98.01) | LF | 6,023 | $2.09 | $1.82 | $1.15 | $2.20 |
| 143 | Remove poles (790-98.02) | EACH | 8 | $695.75 | $605.00 | $700.00 | $770.00 |
| 144 | Remove framing/associated apparatus (790-98.03) | EACH | 54 | $350.75 | $305.00 | $351.00 | $473.00 |
| 145 | 4IN steel gas main (791-01.04) | LF | 465 | $241.50 | $210.00 | $241.00 | $167.20 |
| 146 | HDD 4IN steel pipe - unconsolidated (791-04.22) | LF | 700 | $373.75 | $325.00 | $373.00 | $434.50 |
| 147 | Connect to 2IN EX. STL main W/ stopple (791-06.31) | EACH | 2 | $11,500 | $10,000 | $11,500 | $18,150 |
| 148 | Connect to 4IN EX. STL main W/ stopple (791-06.32) | EACH | 2 | $14,950 | $13,000 | $14,900 | $24,750 |
| 149 | Regulator station (791-09.04) | EACH | 1 | $12,650 | $11,000 | $12,600 | $7,480.00 |
| 150 | 10M strand (793-03.03) | LF | 277 | $5.51 | $8.00 | $6.70 | $8.80 |
| 151 | Relash/delash cable (793-04.01) | LF | 545 | $3.25 | $10.00 | $3.80 | $11.00 |
| 152 | Transfer aerial cable (793-04.08) | EACH | 1 | $237.19 | $250.00 | $1,350.00 | $275.00 |
| 153 | 36 fiber(material only) (793-07.03) | LF | 1,300 | $3.00 | $3.85 | $1.85 | $4.25 |
| 154 | Fiber optic maintenance loop (793-07.23) | EACH | 1 | $313.38 | $250.00 | $825.00 | $275.00 |
| 155 | Handhole 36IN X 60IN X 30IN (793-11.27) | EACH | 2 | $13,311 | $7,881.50 | $15,000 | $8,670.00 |
| 156 | 1 1/4IN innerduct (793-14.12) | LF | 2,200 | $11.99 | $3.85 | $5.60 | $4.25 |
| 157 | Directional bore 4IN/flex sleeve (793-16.04) | LF | 1,100 | $235.75 | $394.50 | $366.00 | $434.00 |
| 158 | Remove aerial cable and wire (793-98.01) | LF | 268 | $1.87 | $5.00 | $6.50 | $5.50 |
| 159 | 6IN PVC water line (795-03.05) | LF | 400 | $143.75 | $175.00 | $200.00 | $776.00 |
| 160 | 10IN PVC water line (795-03.07) | LF | 450 | $201.25 | $200.00 | $229.00 | $790.00 |
| 161 | Cut/cap existing lines (all sizes) (795-06.30) | EACH | 3 | $3,450.00 | $2,500.00 | $2,870.00 | $4,210.00 |
| 162 | 6IN X 6IN tapping sleeve and valve (795-07.03) | EACH | 1 | $20,700 | $7,800.00 | $8,940.00 | $6,485.00 |
| 163 | 10IN X 10IN tapping sleeve and valve (795-07.10) | EACH | 2 | $23,000 | $11,000 | $12,600 | $11,580 |
| 164 | 6IN gate valve assembly (795-08.04) | EACH | 1 | $5,175.00 | $3,000.00 | $3,440.00 | $4,752.00 |
| 165 | 10IN gate valve assembly (795-08.06) | EACH | 3 | $9,200.00 | $5,500.00 | $6,310.00 | $10,542 |
| 166 | 3/4IN water service meter assembly (795-09.01) | EACH | 3 | $2,875.00 | $1,800.00 | $2,070.00 | $4,621.00 |
| 167 | 3/4IN copper service pipe (795-09.28) | LF | 100 | $34.50 | $49.00 | $56.00 | $358.00 |
| 168 | 1IN copper service pipe (795-09.29) | LF | 40 | $40.25 | $80.00 | $92.00 | $372.00 |
| 169 | Fire hydrant assembly (795-11.02) | EACH | 2 | $17,250 | $9,000.00 | $10,300 | $7,845.00 |
| 170 | Retire in place existing water main (795-11.12) | LF | 832 | $20.70 | $30.00 | $34.50 | $26.00 |
| 171 | Remove water meter (795-12.08) | EACH | 1 | $1,150.00 | $600.00 | $688.00 | $3,541.00 |
| 172 | Creek crossing (#1) (795-13.05) | LS | 1 | $23,000 | $20,000 | $23,000 | $198,542 |
| 173 | 12IN steel casing pipe open cut method (795-15.02) | LF | 100 | $402.50 | $363.00 | $416.00 | $621.00 |
| 174 | 16IN steel casing pipe open cut method (795-15.25) | LF | 50 | $460.00 | $400.00 | $459.00 | $691.00 |
| 175 | Cut and cap 6IN force main (797-09.46) | EACH | 1 | $4,025.00 | $15,000 | $17,200 | $8,512.00 |
| 176 | Fiber optic cable enclosure (798-05.02) | EACH | 8 | $2,009.63 | $1,400.00 | $1,590.00 | $1,523.50 |
| 177 | Fiber optic cable splice (798-05.03) | EACH | 8 | $76.76 | $1,400.00 | $1,530.00 | $1,468.50 |
| 178 | 3/8IN high strength strand (798-05.07) | LF | 1,260 | $5.51 | $3.50 | $4.00 | $3.85 |
| 179 | Fiber optic cable (12F) (798-06.04) | LF | 1,260 | $3.25 | $4.50 | $4.80 | $4.65 |
| 180 | Fiber optic cable (96F) (798-06.11) | LF | 2,520 | $4.76 | $5.50 | $6.00 | $5.85 |
| 181 | Fiber optic cable (48F) (798-06.13) | LF | 1,260 | $4.26 | $4.00 | $4.50 | $4.30 |
| 182 | Fiber storage loop (798-06.48) | EACH | 8 | $313.38 | $1,000.00 | $1,280.00 | $1,226.50 |
| 183 | Remove steel strand (798-09.01) | LF | 1,236 | $1.87 | $1.50 | $1.60 | $1.55 |
| 184 | Remove poles, guys, anchors (798-09.03) | EACH | 2 | $299.00 | $800.00 | $1,000.00 | $965.00 |
| 185 | Remove fiber optic cable (798-09.07) | LF | 4,997 | $1.87 | $1.50 | $1.60 | $1.55 |
| 186 | Remove strand pole framing (798-09.08) | EACH | 6 | $74.75 | $450.00 | $502.00 | $483.00 |
| 187 | Power installed anchor (798-11.31) | EACH | 4 | $977.50 | $1,200.00 | $1,320.00 | $1,265.00 |
| 188 | Downguy - wrap type (798-11.41) | EACH | 4 | $263.06 | $400.00 | $414.00 | $400.00 |
| 189 | Strand tangent assembly (798-13.03) | EACH | 2 | $350.75 | $1,500.00 | $1,760.00 | $1,694.00 |
| 190 | Strand angle assembly (798-13.04) | EACH | 2 | $350.75 | $1,500.00 | $1,600.00 | $1,540.00 |
| 191 | Strand double deadend assembly (798-13.07) | EACH | 3 | $600.88 | $2,500.00 | $2,700.00 | $2,600.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of August 15, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.