RankBidderTotal bidAgainst the low bid
1Whaley Construction, LLC$16,312,114Low
2Summers-Taylor, Inc.$18,433,196+13%
3Charles Blalock & Sons, Inc.$19,774,267+21%
4Southern Constructors, Inc.$21,799,199+34%
TDOT contract CN261057: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Whaley Construction, LLC2. Summers-Taylor, Inc.3. Charles Blalock & Sons, Inc.4. Southern Constructors, Inc.
1Construction stakes, lines and grades (105-01)LS1$161,000$166,226$198,454$200,000
2SMPLNG & TSTNG of potentially acidic mat. (106-04.01)EACH112$1,575.00$623.78$1,182.60$3,500.00
3Trainee (109-10.01)HR1,700$0.80$0.80$0.80$0.80
4Brooming & degrassing shoulders (208-01.05)LM1.35$2,850.00$6,246.01$7,002.68$3,500.00
5Clearing and grubbing (201-01)LS1$901,720$199,868$980,140$750,000
6Removal of structures and obstructions (202-01)LS1$184,107$126,144$69,044$85,000
7Removal of structures (box culvert extension, sta. 10+89.39) (202-04.50)LS1$8,300.00$24,003$16,315$10,000
8Removal of buildings (track no. 17) (202-06.01)LS1$2,040.00$3,283.23$500.00$3,000.00
9Removal of buildings (track no. 18) (202-06.02)LS1$4,748.00$6,912.64$500.00$5,000.00
10Removal of buildings (track no. 20) (202-06.03)LS1$8,000.00$15,426$500.00$12,000
11Removal of buildings (track no. 26) (202-06.04)LS1$2,600.00$3,283.23$500.00$3,000.00
12Removal of buildings (track no. 28) (202-06.05)LS1$14,000$23,869$500.00$15,000
13Removal of buildings (track no. 28A) (202-06.06)LS1$15,515$9,849.62$500.00$3,000.00
14Removal of buildings (track no. 29) (202-06.07)LS1$2,100.00$1,543.10$500.00$4,000.00
15Removal of buildings (track no. 44A) (202-06.08)LS1$2,796.00$1,977.52$500.00$4,000.00
16Removal of buildings (track no. 52) (202-06.09)LS1$6,000.00$3,701.53$500.00$5,000.00
17Removal of buildings (track no. 53) (202-06.10)LS1$2,580.00$2,220.90$500.00$4,000.00
18Removal of buildings (track no. 54) (202-06.11)LS1$10,300$6,047.40$500.00$10,000
19Removal of buildings (track no. 57) (202-06.12)LS1$2,000.00$1,969.92$500.00$3,000.00
20Removal of buildings (track no. 112) (202-06.13)LS1$3,975.00$2,961.20$500.00$3,000.00
21Removal of buildings (track no. 113) (202-06.14)LS1$5,064.00$2,220.90$500.00$5,000.00
22Road & drainage excavation (unclassified) (203-01)CY44,142$29.38$38.00$43.37$32.00
23RD & DRNG excv (acid producing- off site disposal) (203-01.07)CY8,640$55.32$84.07$134.06$95.00
24Borrow excavation (graded solid rock) (203-02.01)TON1,500$58.27$88.26$91.35$125.00
25Placing and spreading topsoil (203-04)CY5,667$15.22$23.03$31.09$35.00
26Undercutting (203-05)CY206$40.58$57.25$87.73$150.00
27Water (203-06)MG152$75.00$125.36$207.15$275.00
28Construction of haul road (203-50)LS1$216,250$321,472$568,501$1,200,000
29Culvert excavation (unclassified) (204-01)CY37$60.81$96.83$66.88$100.00
30Foundation fill material (204-08)CY6$180.00$204.59$374.31$150.00
31Backfill material (flowable fill) (204-08.01)CY15$585.00$487.62$585.41$1,500.00
32Sediment removal (209-05)CY677$18.02$32.79$45.84$50.00
33Plastic pavement marking (8IN line) (716-02.12)LM1$8,690.00$9,855.77$8,532.00$8,000.00
34Temporary silt fence (with backing) (209-08.02)LF443$6.30$12.71$5.40$10.00
35Temporary silt fence (without backing) (209-08.03)LF2,100$3.99$10.52$2.00$7.00
36Rock check dam (209-08.07)EACH36$694.44$1,029.89$907.37$1,000.00
37Sandbags (209-09.01)BAG4,700$5.19$6.19$11.34$22.00
38Sediment filter bag (15' X 15') (209-09.03)EACH2$1,749.00$2,188.52$162.00$1,500.00
39Curb inlet protection (type 1) (209-09.40)EACH18$346.50$1,088.74$189.00$1,000.00
40Temporary dewatering structure (209-10.01)CY298$172.82$107.41$97.67$150.00
41Painted pavement marking (4" line) (716-05.01)LM1$1,650.00$1,559.46$1,350.00$3,000.00
42Polyethylene sheeting (6 mil. minimum) (209-20.03)SY39$50.00$13.09$67.17$25.00
43Polyethylene sheeting (10 mil.) (209-20.04)SY2$150.00$120.26$67.17$150.00
44Catch basin filter assembly(type 1) (209-40.41)EACH7$826.00$665.28$648.00$1,500.00
45Mineral aggregate, type A base, grading D (303-01)TON18,181$58.28$58.62$55.00$65.00
46Granular backfill (roadway) (303-01.01)TON95$61.58$93.78$68.44$85.00
47Mineral aggregate (size 57) (303-10.01)TON261$59.46$124.08$70.93$110.00
48Mineral aggregate (size 67) (303-10.04)TON2,430$56.83$80.00$65.15$80.00
49Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01)TON2,444$199.50$191.55$206.87$210.00
50Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON3,425$186.90$162.40$175.39$200.00
51Bituminous material for prime coat (PC) (402-01)TON27$315.00$2,105.00$227.34$320.00
52Aggregate for cover material (PC) (402-02)TON96$21.00$390.80$422.06$30.00
53Bituminous material for tack coat (TC) (403-01)TON19$1,312.50$1,345.00$1,452.60$1,500.00
54Acs mix (PG64-22) grading E shoulder (411-01.07)TON295$262.50$235.25$254.07$300.00
55Acs mix(PG64-22) grading D (411-01.10)TON1,935$206.85$206.80$223.34$205.00
56Scoring shoulders (continuous) (16IN width) (411-12.01)LM1.60$4,702.50$6,878.03$2,748.34$1,500.00
57Scoring for centerline rumble (4IN width-24IN spacing) (411-12.05)LM1$4,702.50$14,431$2,748.34$1,500.00
58Cold planing bituminous pavement (415-01.01)TON635$92.66$86.25$93.15$95.00
59Structural steel (602-01)LB64$20.00$20.31$150.54$200.00
60Class A concrete (roadway) (604-01.01)CY8$2,825.00$9,331.58$10,645$2,000.00
61Steel bar reinforcement (roadway) (604-01.02)LB1,240$3.38$2.82$8.98$4.00
6218" concrete pipe culvert (class III) (607-03.02)LF1,330$182.50$193.38$232.48$200.00
6324" concrete pipe culvert (class III) (607-05.02)LF1,125$210.50$153.68$255.22$300.00
6436" concrete pipe culvert (class III) (607-07.02)LF178$227.00$350.25$308.31$450.00
6560" concrete pipe culvert (class III) (607-11.03)LF56$732.00$942.14$639.75$750.00
6618" pipe culvert (side drain) (607-39.02)LF495$63.00$111.46$183.31$175.00
6730" pipe culvert (side drain) (607-39.04)LF371$123.00$204.31$220.43$200.00
68Manholes, > 4' - 8' depth (611-01.02)EACH2$11,874$10,834$10,041$12,000
69Manholes, > 8' - 12' depth (611-01.03)EACH1$9,127.00$10,568$11,846$13,000
70Rework manhole (611-01.21)EACH1$4,897.00$4,650.10$12,526$3,000.00
71Class A concrete (pipe endwalls) (611-07.01)CY19.92$2,870.00$2,550.50$2,570.00$2,000.00
72Steel bar reinforcement (pipe endwalls) (611-07.02)LB977$7.00$2.53$3.56$3.00
7318IN endwall (side drain) (611-07.31)EACH10$8,147.00$5,240.98$6,346.45$5,000.00
7430IN endwall (side drain) (611-07.33)EACH1$18,452$10,708$19,380$11,000
7518IN endwall (cross drain) 3:1 (611-07.54)EACH2$6,163.00$5,294.82$4,122.39$4,000.00
7618IN endwall (cross drain) 4:1 (611-07.55)EACH7$6,897.00$5,659.32$2,275.49$4,000.00
7718IN endwall (cross drain) 6:1 (611-07.56)EACH1$7,456.00$6,394.43$5,205.79$5,000.00
7824IN endwall (cross drain) 3:1 (611-07.57)EACH1$7,841.00$4,895.23$2,551.66$5,000.00
7936IN endwall (cross drain) 3:1 (611-07.63)EACH2$15,421$9,662.15$7,388.09$8,000.00
80Capping existing catchbasin (611-09.03)EACH1$4,137.00$4,578.08$3,936.42$2,500.00
81Catch basins, type 25, 0' - 4' depth (611-25.01)EACH4$13,257$10,264$8,317.38$25,000
82Catch basins, type 25, > 4' - 8' depth (611-25.02)EACH15$15,234$11,045$24,598$25,000
83Catch basins, type 38, 0' - 4' depth (611-38.01)EACH3$9,874.00$9,013.36$8,635.44$10,000
84Catch basins, type 38, > 4' - 8' depth (611-38.02)EACH3$10,287$9,239.11$9,711.45$12,000
8518" temporary drainage pipe (621-03.02)LF100$61.00$112.93$103.97$60.00
86Concrete driveway (701-02)SF247$31.00$22.56$186.72$30.00
87Concrete combined curb & gutter (702-03)CY215$770.00$688.49$769.66$800.00
88Portland cement concrete ditch paving (703-01)CY373$726.00$578.61$682.76$760.00
89Metal beam guard fence (705-01.04)LF39$89.25$106.04$113.40$95.00
90W beam GR (type 2) MASH TL-3 (705-06.01)LF2,436$28.35$33.68$30.24$30.00
91Weak-post guardrail attachment to culvert(MASH TL-3) (705-06.09)LF4$367.50$436.65$280.80$400.00
92GR terminal (in-inline) MASH TL-3 (705-06.11)EACH11$1,417.50$1,684.21$1,242.00$2,000.00
93Tangent energy absorbing term MASH TL-3 (705-06.20)EACH7$3,412.50$4,054.59$3,780.00$4,000.00
94Thrie beam bridge transition MASH TL-3 (705-06.25)EACH8$3,570.00$4,241.72$2,484.00$4,500.00
95GR terminal (energy absorbing) MASH TL-2 (705-06.30)EACH2$2,887.50$3,430.80$3,024.00$3,500.00
96Radius rail (706-06.03)LF270$37.28$44.29$61.56$50.00
97Rounded end element (706-10.26)EACH10$183.75$218.32$567.00$400.00
98Chain link fence (6 foot) (707-01.11)LF375$29.00$32.44$28.08$50.00
99Removal of fence (chain-link fence) (707-06.01)LF2,493$7.00$7.49$6.48$5.00
100Fence (barded wire) (707-08.01)LF1,033$8.00$8.73$7.56$20.00
101High-visibility construction fence (707-08.11)LF390$7.00$4.68$2.16$10.00
102Markers (concrete R.O.W. posts) (708-02.01)EACH75$330.00$374.27$324.00$500.00
103Machined rip-rap (class A-1) (709-05.06)TON569$60.14$78.79$88.97$140.00
104Machined rip-rap (class B) (709-05.08)TON1,744$58.12$81.45$88.97$100.00
105Machined rip-rap (class C) (709-05.09)TON350$59.57$82.89$88.97$125.00
1066" pipe underdrain (710-09.02)LF86$86.23$28.63$53.05$75.00
107Traffic control (712-01)LS1$303,000$612,631$414,000$500,000
108Interconnected portable barrier rail (712-02.02)LF510$90.00$136.34$143.80$60.00
109Portable barrier rail (MASH TL-3) (712-02.10)LF220$125.00$182.80$285.89$70.00
110Temporary work zone crash cushion (MASH TL-3) (712-02.60)EACH4$7,350.00$14,699$5,420.19$9,000.00
111Flexible drums (channelizing) (712-04.01)EACH1,233$44.10$52.40$41.04$60.00
112Warning lights (type A) (712-05.01)EACH12$29.40$34.93$23.76$60.00
113Warning lights (type C) (712-05.03)EACH49$29.40$34.93$23.76$60.00
114Signs (construction) (712-06)SF2,064$9.19$10.92$7.83$15.00
115Temporary barricades (type III) (712-07.03)LF160$18.90$22.46$30.78$55.00
116Class A concrete (foundation for sign supports) (713-01.01)CY8$210.00$249.51$218.18$1,500.00
117Steel bar reinforcement(foundation for sign supports) (713-01.02)LB1,863$1.05$1.25$1.09$4.00
118Concrete barrier/parapet delineator (713-02.26)EACH6$6.30$7.48$6.55$60.00
119Perforated/knockout square tube post (713-11.02)LB2,794$4.73$5.61$4.91$6.00
120P post slip base (713-11.21)EACH36$556.50$661.21$578.18$750.00
121U post slip base (713-11.22)EACH1$577.50$686.16$600.00$550.00
122Flat sheet aluminum signs (0.080" thick) (713-13.02)SF212$13.65$16.22$14.18$13.00
123Flat sheet aluminum signs (0.100" thick) (713-13.03)SF446$14.96$17.78$15.55$15.00
124Removal of signs, posts and footings (713-15)LS1$525.00$623.78$545.45$5,000.00
125Removal & relocation of sign & support (713-15.02)EACH12$157.50$187.13$163.64$1,000.00
126Changeable message sign unit (713-16.01)EACH6$9,240.00$10,979$7,398.00$15,000
127Temporary raised pavement marker,yellow (716-01.07)EACH1,002$11.00$12.48$10.80$20.00
128Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH160$44.00$49.90$43.20$50.00
129Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH32$44.00$49.90$43.20$50.00
130Plastic pavement marking(channelization striping) (716-02.04)SY29$27.50$31.19$27.00$30.00
131Plastic pavement marking (stop line) (716-02.05)LF223$11.00$12.48$10.80$12.00
132Plastic pavement marking (turn lane arrow) (716-02.06)EACH14$165.00$187.13$162.00$165.00
133Plastic pavement marking (straight-turn arrow) (716-04.01)EACH3$192.50$218.33$189.00$200.00
134Painted pavement marking (stop line) (716-05.05)LF304$5.78$6.55$5.67$6.00
135Painted pavement marking (6" line) (716-05.20)LM13$1,650.00$1,871.35$1,620.00$1,300.00
136Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM5$6,792.50$7,703.71$6,669.00$6,250.00
137Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05)LF2,213$1.38$1.56$1.35$1.50
138Mobilization (717-01)LS1$773,500$1,145,000$900,000$1,950,000
139Removal of signal equipment (730-01.02)EACH2$1,050.00$3,118.91$2,700.00$10,000
140Electrical service connection (730-05.01)EACH2$8,610.00$4,366.48$3,780.00$5,000.00
141Cabinet (flasher) (730-15.33)EACH2$2,247.00$3,118.91$2,700.00$3,000.00
142Controller (flasher) (730-16.05)EACH2$2,079.00$623.79$540.00$2,000.00
143Pedestal pole (type B) (730-23.29)EACH2$1,575.00$9,980.52$8,640.00$10,000
144Portable traffic signal system (730-40.01)EACH13$16,485$19,587$17,127$17,500
145School speed limit flashing assembly (hard-wired) (730-50.31)EACH2$3,055.50$5,807.73$5,027.67$6,000.00
146Geomembrane (740-06.01)SY3,356$15.25$21.06$25.98$17.50
147Geogrid reinforcement type 2 (740-07.04)SY2,105$6.00$6.67$18.33$15.00
148Geotextile (type III)(erosion control) (740-10.03)SY1,137$5.00$8.27$3.84$12.00
149Geotextile (type IV)(stabilization) (740-10.04)SY22,799$4.00$8.34$0.56$10.00
150Seeding (with mulch) (801-01)UNIT1,084$52.50$61.75$43.20$60.00
151Special wetland seed mixture (801-01.36)UNIT2$210.00$998.05$270.00$900.00
152Natve seed MX final stablizatn of slopes (801-01.38)UNIT35$52.50$86.08$108.00$70.00
153Seeding (without mulch) (801-02)UNIT44$36.75$49.28$27.00$50.00
154Water (seeding & sodding) (801-03)MG22$157.50$155.95$135.00$150.00
155Sodding (new sod) (803-01)SY2,407$8.30$7.49$6.48$12.00
156Erosion control blanket (type I) (805-12.01)SY17,432$1.10$1.25$1.08$2.00
157Project mowing (806-02.03)CYCL6$2,940.00$5,614.04$1,959.64$10,000
158Removal of asbestos (202-01.02)LS1$20,000$31,127$49,356$100,000
159Removal of structures (existing bridge no. 37SR031000) (202-04.01)LS1$62,700$57,244$48,812$100,000
160Removal of structures (existing bridge no. 37-SR031-00.07) (202-04.02)LS1$180,200$214,394$217,203$250,000
161Dry excavation (bridges) (204-02.01)CY636$42.45$75.77$142.52$100.00
162Wet excavation (bridges) (204-03.01)CY98$90.82$74.43$296.57$150.00
163Rock excavation (bridges) (204-04.01)CY130$206.92$525.00$495.60$200.00
164Rock drilling (bridges) (204-05)LF120$64.17$58.31$333.94$60.00
165Foundation preparation(bridge no. 2, pier no. 1, sta 230+68.21) (204-10.02)LS1$82,515$133,000$201,460$200,000
166Foundation preparation(bridge no. 2, pier no. 2, sta 231+19.79) (204-10.03)LS1$82,515$133,000$151,095$200,000
167Core drilling for piles(rock) (204-14)LF165$331.12$1,011.79$502.60$500.00
168Core drilling for piles(soil) (204-15)LF40$130.00$1,156.69$445.88$300.00
169Granular backfill (bridges) (303-01.02)TON147$63.99$102.71$75.35$125.00
170Epoxy coated reinforcing steel (604-02.03)LB100,524$2.16$1.92$1.86$3.00
171Class A concrete (bridges) (604-03.01)CY433$1,798.14$2,436.29$3,069.73$1,500.00
172Steel bar reinforcement (bridges) (604-03.02)LB64,723$2.75$1.87$1.64$2.50
173Pavement @ bridge ends (604-03.04)SY547$458.32$658.03$436.74$650.00
174Class D concrete (bridge deck) (604-03.09)CY339$1,858.56$2,431.92$2,956.72$2,200.00
175Applied texture finish (new structures) (604-04.01)SY1,373$24.00$19.34$17.90$25.00
176Bridge deck grooving (mechanical) (604-05.31)SY1,595$20.86$7.69$5.67$15.00
177Steel piles (10 inch) (606-02.03)LF573$147.99$221.48$146.87$400.00
178Pile tips (steel piles, 10 inch) (606-02.06)EACH22$292.27$325.00$605.25$1,000.00
179Prestressed concrete I-beam (type II) (615-01.02)LF902$290.39$358.43$419.69$500.00
180Prestressed concrete box beam (33" X 36") (615-02.05)LF616$460.34$606.34$621.16$750.00
181Bridge deck crack sealing (617-02)LF239$11.92$8.28$132.88$50.00
182Sealant (HMWM) (617-05)GAL2$500.00$374.56$4,156.36$750.00
183Concrete railing (620-06)LF234$254.21$345.94$471.31$250.00
184Temporary shoring (621-05.02)LS1$92,400$148,126$164,874$200,000
185Pole 35FT class 5 wood (790-02.04)EACH1$2,342.00$2,782.07$946.08$1,500.00
186Pole 40FT class 4 wood (790-03.03)EACH8$2,639.00$3,135.13$1,070.28$1,500.00
187Pole 45FT class 2 wood (790-04.02)EACH4$3,130.00$3,718.64$1,495.80$2,000.00
188Pole 45FT class 3 wood (790-04.03)EACH8$2,996.00$3,718.64$1,398.60$2,000.00
189Pole 50FT class 3 wood (790-05.03)EACH3$3,397.00$4,036.20$1,501.20$2,000.00
190Pole 55FT class 2 wood (790-06.02)EACH2$4,038.00$4,798.09$1,809.00$2,500.00
1911PH SGL support 15KV (790-21.04)EACH2$252.00$299.10$280.80$300.00
1921PH DBL primary support 15KV (790-21.05)EACH3$342.00$406.24$340.20$400.00
1931PH primary med angle 15KV (790-21.06)EACH2$360.00$427.62$351.00$450.00
1941PH deadend 15KV (790-21.08)EACH2$360.00$427.73$277.56$450.00
1951PH vertical dde 15KV (790-21.10)EACH3$920.00$1,092.87$401.76$500.00
1963PH crossarm DBL prim sup LRG cond 15KV (790-25.11)EACH11$1,608.00$1,910.07$1,317.60$1,500.00
1973PH vertical 15KV (790-25.15)EACH7$1,237.00$1,470.05$648.00$1,000.00
1983PH crossarm deadend SGL 15KV (790-25.21)EACH3$2,010.00$2,387.21$1,263.60$2,000.00
1993PH crossarm dde 15KV (790-25.23)EACH2$4,080.00$4,848.58$1,944.00$2,500.00
2003PH crossarm DBL 10FT LRG cond 15KV (790-25.30)EACH4$3,165.00$3,760.29$2,143.80$3,000.00
201Secondary assemblies small angle (790-30.01)EACH3$98.00$115.69$118.80$150.00
202Secondary assemblies deadend (790-30.03)EACH23$117.00$138.37$143.64$200.00
203Secondary conductor 1/0 AL triplex (790-30.14)LF1,145$8.00$9.34$3.42$5.00
204Down guy - through bolt type (790-32.01)EACH33$454.00$514.56$486.00$500.00
205OH guy - through bolt type (790-32.07)EACH2$700.00$793.01$615.60$700.00
206Guy guard (790-32.23)EACH37$30.00$33.15$10.80$20.00
207Screw type anchor 28,000LB (790-33.26)EACH27$943.00$1,068.90$529.20$750.00
208Transfer service (790-36.04)EACH4$298.00$337.31$313.20$500.00
209Transfer light (790-36.06)EACH2$420.00$476.25$194.40$300.00
210Transfer 3-phase assembly (790-36.07)EACH1$6,329.00$7,177.71$3,245.40$5,000.00
211Transfer existing 1PH transformer/recloser (790-36.11)EACH9$1,820.00$2,062.86$815.40$1,000.00
212OH cond 2 7/1 acsr sparate (790-40.02)LF566$3.00$3.59$1.67$3.00
213OH cond 1/0 6/1 acsr raven (790-40.03)LF8,460$5.00$5.79$2.48$4.00
214Secondary pullbox large (790-43.46)EACH1$2,357.00$2,672.61$1,404.00$2,000.00
215Secondary riser W/ 3IN conduit (790-43.51)EACH1$1,868.00$2,118.18$1,263.60$1,500.00
2161PH transformer (790-46.01)EACH3$1,264.00$1,437.71$1,015.20$1,350.00
217Cutout knife switch, SNGL loadbreak 15KV (790-58.03)EACH3$923.00$1,045.60$691.20$1,000.00
218Goab switch 15KV (790-58.06)EACH2$11,184$12,683$7,020.00$10,000
2193PH sectlr or recl W/ bypass SW 25KV (790-61.10)EACH1$11,275$12,787$5,238.00$7,500.00
220Pole ground rod type (790-68.01)EACH40$471.00$533.42$162.00$250.00
221Fiber tangent assembly (790-74.31)EACH18$238.00$428.70$248.40$400.00
222Fiber deadend assembly (790-74.32)EACH1$339.00$919.78$189.00$850.00
223Fiber double deadend assembly (790-74.33)EACH6$523.00$1,442.05$216.00$1,250.00
224Remove wire (790-98.01)LF13,480$2.20$2.50$1.57$2.00
225Remove poles (790-98.02)EACH22$631.00$714.46$275.40$300.00
226Remove framing/associated apparatus (790-98.03)EACH151$316.00$357.23$189.00$200.00
227Pole 35FT class 5 wood (793-01.08)EACH4$2,625.00$2,782.20$1,320.84$1,500.00
228Pole 40FT class 4 wood (793-01.12)EACH1$4,725.00$3,135.36$1,320.84$1,500.00
229Pole 45FT class 2 wood (793-01.16)EACH3$5,775.00$3,718.64$1,320.84$2,000.00
230Pole 45FT class 3 wood (793-01.17)EACH7$5,670.00$3,559.95$1,320.84$2,000.00
231Pole 50FT class 2 wood (793-01.20)EACH1$6,510.00$4,036.20$1,637.05$2,000.00
232Pole 55FT class 2 wood (793-01.24)EACH4$7,980.00$4,798.09$1,637.05$2,500.00
233Push brace (793-01.37)EACH1$1,260.00$4,796.89$1,320.84$2,500.00
234Anchor 1 1/4IN (793-01.42)EACH21$1,260.00$1,169.29$485.37$1,000.00
235Aerial splice closure (793-04.07)EACH2$6,090.00$998.05$1,242.87$1,000.00
236Transfer aerial cable (793-04.08)EACH2$420.00$397.51$176.49$500.00
237144 fiber(material only) (793-07.07)LF548$3.00$3.74$1.74$4.00
238108-144 fiber(installation only) (793-07.17)LF548$3.00$11.60$2.81$12.00
239Fiber optic maintenance loop (793-07.23)EACH2$420.00$982.16$244.08$1,000.00
240Single fiber optic cable splice (793-07.25)EACH288$63.00$69.86$50.19$75.00
241Expose existing cable/conduit (all depths) (793-10.20)LF80$420.00$139.13$17.56$150.00
242Handhole 30INX48IN (793-11.20)EACH1$6,090.00$6,127.75$1,979.10$5,500.00
243Concrete handhole 4FT X 4FT X 4FT (793-11.25)EACH1$22,722$23,386$12,501$20,000
244Remove handhole (793-11.58)EACH1$1,050.00$1,590.03$393.27$1,500.00
2451 duct formation @ 36IN depth (793-13.12)LF350$84.00$44.74$52.38$50.00
2462 duct formation @ 36IN depth (793-13.17)LF20$95.00$89.49$63.18$100.00
2474 duct formation @ 36IN depth (793-13.27)LF150$115.00$99.47$73.98$110.00
248Concrete encasement per duct (793-14.02)LF640$25.00$33.06$16.20$35.00
249Multi duct (793-14.14)LF520$6.00$15.21$5.42$15.00
250Transfer cable attachment (793-15.01)EACH17$840.00$428.70$176.48$450.00
251Transfer dip cable/equipment (793-15.05)EACH1$1,260.00$919.78$2,484.00$1,000.00
252Remove aerial cable and wire (793-98.01)LF634$4.00$2.15$1.06$2.00
253Remove poles all sizes (793-98.04)EACH16$525.00$1,247.57$222.75$750.00
254Remove fiber storage bracket (793-98.10)EACH1$630.00$397.52$1,620.00$400.00
2553IN PVC water line (795-03.03)LF686$53.27$70.39$66.96$100.00
2566IN PVC water line (795-03.05)LF3,869$107.87$103.80$108.00$105.00
257HDD 6IN HDPE casing pipe-uncon (795-05.03)LF52$654.00$756.75$540.00$450.00
258HDD 12IN HDPE casing pipe-uncon (795-05.06)LF145$958.00$1,150.07$540.00$750.00
259Connect to 2IN water line (795-06.01)EACH2$3,114.00$3,822.52$3,240.00$4,500.00
260Connect to 3IN water line (795-06.02)EACH3$3,970.00$4,507.84$3,780.00$5,000.00
261Connect to 4IN water line (795-06.03)EACH2$4,875.00$4,093.49$4,860.00$5,000.00
262Connect to 6IN water line (795-06.04)EACH6$6,120.00$4,580.57$5,400.00$5,500.00
2632IN gate valve assembly (795-08.01)EACH2$3,842.00$2,141.73$2,700.00$3,500.00
2643IN gate valve assembly (795-08.02)EACH6$4,251.00$2,094.51$3,240.00$3,500.00
2656IN gate valve assembly (795-08.04)EACH18$4,878.00$3,449.45$3,888.00$4,000.00
266Relocate/reconnect service assembly (795-09.09)EACH16$3,115.00$1,844.69$1,296.00$2,500.00
267Sample tap (795-09.10)EACH3$4,321.00$1,340.16$540.00$2,000.00
2683/4IN HDPE service pipe (795-09.14)LF616$41.32$38.14$10.80$75.00
269Fire hydrant assembly (795-11.02)EACH1$8,954.00$11,803$8,100.00$12,000
270Retire in place existing water main (795-11.12)LF4,355$4.58$13.11$2.70$2.00
27112IN HDPE casing open cut (795-30.05)LF44$164.39$186.88$540.00$325.00
272Fiber optic cable enclosure (798-05.02)EACH4$2,310.00$1,469.29$1,271.95$1,500.00
273Fiber optic cable splice (798-05.03)EACH48$63.00$76.10$65.88$75.00
2743/8IN high strength strand (798-05.07)LF3,056$5.00$6.10$5.28$5.50
275Trunk/feeder cable .750 (798-05.13)LF2,442$6.00$9.84$8.52$8.50
276Trunk/feeder cable .875 (798-05.16)LF696$7.00$11.09$9.60$9.50
277Communication assembly (loop) (798-05.52)EACH4$1,890.00$584.65$506.12$750.00
278Communication assembly (splice) (798-05.53)EACH4$1,680.00$699.22$605.31$800.00
279Trunk/feeder cable .500 (798-05.57)LF1,389$5.00$9.84$8.52$10.00
280Fiber optic cable (144F) (798-06.20)LF2,331$6.00$8.60$7.44$8.00
281Line extender (798-06.55)EACH1$1,722.00$699.22$605.31$750.00
282Remove steel strand (798-09.01)LF3,062$4.00$2.36$2.04$2.50
283Remove aerial cable/terminals (798-09.02)LF4,475$4.00$2.36$2.04$2.50
284Remove poles, guys, anchors (798-09.03)EACH10$525.00$194.03$167.97$250.00
285Remove strand pole framing (798-09.08)EACH23$525.00$124.73$107.98$200.00
286Remove fiber optic cable (798-09.09)LS1$15,750$2.36$4,468.19$5,500.00
287Amplifier with service tap (798-10.12)EACH1$13,272$1,045.70$905.25$1,250.00
288Amplifier assembly (798-10.15)EACH1$4,725.00$1,045.70$905.25$1,250.00
289Service tap assembly (798-10.16)EACH3$420.00$699.22$605.31$750.00
290Power installed anchor (798-11.31)EACH10$1,260.00$1,170.22$1,207.78$1,200.00
291Downguy - wrap type (798-11.41)EACH10$525.00$229.94$199.06$200.00
292Line extender with service tap (798-12.21)EACH2$1,260.00$1,045.70$905.15$1,250.00
293Splitter (798-12.24)EACH1$262.00$699.22$605.31$750.00
294Strand bond assembly (798-13.01)EACH9$367.00$471.24$407.95$500.00
295Strand angle assembly (798-13.04)EACH3$367.00$471.24$407.95$500.00
296Directional coupler (798-13.05)EACH2$367.00$699.22$605.31$750.00
297Strand double deadend assembly (798-13.07)EACH10$787.00$880.12$761.91$750.00
298Strand deadend assembly (798-13.08)EACH3$367.00$471.24$407.95$500.00
TDOT contract CN261057: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of June 26, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy