TDOT contract CN261057 bid tabulation
The grading, drainage, construction of bridges, signals, and paving on s.r. 31 near u.s. 11w (s.r. 1) in mooresburg (l.m. 0.100) to adams lane (l.m. 4.350). Let by Tennessee DOT on June 26, 2026, Hawkins County. 4 bids received; low bid $16,312,114 by Whaley Construction, LLC.
- Owner
- Tennessee DOT
- Letting
- 26 JUN 2026
- Pay items
- 298
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Whaley Construction, LLC | $16,312,114 | Low |
| 2 | Summers-Taylor, Inc. | $18,433,196 | +13% |
| 3 | Charles Blalock & Sons, Inc. | $19,774,267 | +21% |
| 4 | Southern Constructors, Inc. | $21,799,199 | +34% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Whaley Construction, LLC | 2. Summers-Taylor, Inc. | 3. Charles Blalock & Sons, Inc. | 4. Southern Constructors, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $161,000 | $166,226 | $198,454 | $200,000 |
| 2 | SMPLNG & TSTNG of potentially acidic mat. (106-04.01) | EACH | 112 | $1,575.00 | $623.78 | $1,182.60 | $3,500.00 |
| 3 | Trainee (109-10.01) | HR | 1,700 | $0.80 | $0.80 | $0.80 | $0.80 |
| 4 | Brooming & degrassing shoulders (208-01.05) | LM | 1.35 | $2,850.00 | $6,246.01 | $7,002.68 | $3,500.00 |
| 5 | Clearing and grubbing (201-01) | LS | 1 | $901,720 | $199,868 | $980,140 | $750,000 |
| 6 | Removal of structures and obstructions (202-01) | LS | 1 | $184,107 | $126,144 | $69,044 | $85,000 |
| 7 | Removal of structures (box culvert extension, sta. 10+89.39) (202-04.50) | LS | 1 | $8,300.00 | $24,003 | $16,315 | $10,000 |
| 8 | Removal of buildings (track no. 17) (202-06.01) | LS | 1 | $2,040.00 | $3,283.23 | $500.00 | $3,000.00 |
| 9 | Removal of buildings (track no. 18) (202-06.02) | LS | 1 | $4,748.00 | $6,912.64 | $500.00 | $5,000.00 |
| 10 | Removal of buildings (track no. 20) (202-06.03) | LS | 1 | $8,000.00 | $15,426 | $500.00 | $12,000 |
| 11 | Removal of buildings (track no. 26) (202-06.04) | LS | 1 | $2,600.00 | $3,283.23 | $500.00 | $3,000.00 |
| 12 | Removal of buildings (track no. 28) (202-06.05) | LS | 1 | $14,000 | $23,869 | $500.00 | $15,000 |
| 13 | Removal of buildings (track no. 28A) (202-06.06) | LS | 1 | $15,515 | $9,849.62 | $500.00 | $3,000.00 |
| 14 | Removal of buildings (track no. 29) (202-06.07) | LS | 1 | $2,100.00 | $1,543.10 | $500.00 | $4,000.00 |
| 15 | Removal of buildings (track no. 44A) (202-06.08) | LS | 1 | $2,796.00 | $1,977.52 | $500.00 | $4,000.00 |
| 16 | Removal of buildings (track no. 52) (202-06.09) | LS | 1 | $6,000.00 | $3,701.53 | $500.00 | $5,000.00 |
| 17 | Removal of buildings (track no. 53) (202-06.10) | LS | 1 | $2,580.00 | $2,220.90 | $500.00 | $4,000.00 |
| 18 | Removal of buildings (track no. 54) (202-06.11) | LS | 1 | $10,300 | $6,047.40 | $500.00 | $10,000 |
| 19 | Removal of buildings (track no. 57) (202-06.12) | LS | 1 | $2,000.00 | $1,969.92 | $500.00 | $3,000.00 |
| 20 | Removal of buildings (track no. 112) (202-06.13) | LS | 1 | $3,975.00 | $2,961.20 | $500.00 | $3,000.00 |
| 21 | Removal of buildings (track no. 113) (202-06.14) | LS | 1 | $5,064.00 | $2,220.90 | $500.00 | $5,000.00 |
| 22 | Road & drainage excavation (unclassified) (203-01) | CY | 44,142 | $29.38 | $38.00 | $43.37 | $32.00 |
| 23 | RD & DRNG excv (acid producing- off site disposal) (203-01.07) | CY | 8,640 | $55.32 | $84.07 | $134.06 | $95.00 |
| 24 | Borrow excavation (graded solid rock) (203-02.01) | TON | 1,500 | $58.27 | $88.26 | $91.35 | $125.00 |
| 25 | Placing and spreading topsoil (203-04) | CY | 5,667 | $15.22 | $23.03 | $31.09 | $35.00 |
| 26 | Undercutting (203-05) | CY | 206 | $40.58 | $57.25 | $87.73 | $150.00 |
| 27 | Water (203-06) | MG | 152 | $75.00 | $125.36 | $207.15 | $275.00 |
| 28 | Construction of haul road (203-50) | LS | 1 | $216,250 | $321,472 | $568,501 | $1,200,000 |
| 29 | Culvert excavation (unclassified) (204-01) | CY | 37 | $60.81 | $96.83 | $66.88 | $100.00 |
| 30 | Foundation fill material (204-08) | CY | 6 | $180.00 | $204.59 | $374.31 | $150.00 |
| 31 | Backfill material (flowable fill) (204-08.01) | CY | 15 | $585.00 | $487.62 | $585.41 | $1,500.00 |
| 32 | Sediment removal (209-05) | CY | 677 | $18.02 | $32.79 | $45.84 | $50.00 |
| 33 | Plastic pavement marking (8IN line) (716-02.12) | LM | 1 | $8,690.00 | $9,855.77 | $8,532.00 | $8,000.00 |
| 34 | Temporary silt fence (with backing) (209-08.02) | LF | 443 | $6.30 | $12.71 | $5.40 | $10.00 |
| 35 | Temporary silt fence (without backing) (209-08.03) | LF | 2,100 | $3.99 | $10.52 | $2.00 | $7.00 |
| 36 | Rock check dam (209-08.07) | EACH | 36 | $694.44 | $1,029.89 | $907.37 | $1,000.00 |
| 37 | Sandbags (209-09.01) | BAG | 4,700 | $5.19 | $6.19 | $11.34 | $22.00 |
| 38 | Sediment filter bag (15' X 15') (209-09.03) | EACH | 2 | $1,749.00 | $2,188.52 | $162.00 | $1,500.00 |
| 39 | Curb inlet protection (type 1) (209-09.40) | EACH | 18 | $346.50 | $1,088.74 | $189.00 | $1,000.00 |
| 40 | Temporary dewatering structure (209-10.01) | CY | 298 | $172.82 | $107.41 | $97.67 | $150.00 |
| 41 | Painted pavement marking (4" line) (716-05.01) | LM | 1 | $1,650.00 | $1,559.46 | $1,350.00 | $3,000.00 |
| 42 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 39 | $50.00 | $13.09 | $67.17 | $25.00 |
| 43 | Polyethylene sheeting (10 mil.) (209-20.04) | SY | 2 | $150.00 | $120.26 | $67.17 | $150.00 |
| 44 | Catch basin filter assembly(type 1) (209-40.41) | EACH | 7 | $826.00 | $665.28 | $648.00 | $1,500.00 |
| 45 | Mineral aggregate, type A base, grading D (303-01) | TON | 18,181 | $58.28 | $58.62 | $55.00 | $65.00 |
| 46 | Granular backfill (roadway) (303-01.01) | TON | 95 | $61.58 | $93.78 | $68.44 | $85.00 |
| 47 | Mineral aggregate (size 57) (303-10.01) | TON | 261 | $59.46 | $124.08 | $70.93 | $110.00 |
| 48 | Mineral aggregate (size 67) (303-10.04) | TON | 2,430 | $56.83 | $80.00 | $65.15 | $80.00 |
| 49 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 2,444 | $199.50 | $191.55 | $206.87 | $210.00 |
| 50 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 3,425 | $186.90 | $162.40 | $175.39 | $200.00 |
| 51 | Bituminous material for prime coat (PC) (402-01) | TON | 27 | $315.00 | $2,105.00 | $227.34 | $320.00 |
| 52 | Aggregate for cover material (PC) (402-02) | TON | 96 | $21.00 | $390.80 | $422.06 | $30.00 |
| 53 | Bituminous material for tack coat (TC) (403-01) | TON | 19 | $1,312.50 | $1,345.00 | $1,452.60 | $1,500.00 |
| 54 | Acs mix (PG64-22) grading E shoulder (411-01.07) | TON | 295 | $262.50 | $235.25 | $254.07 | $300.00 |
| 55 | Acs mix(PG64-22) grading D (411-01.10) | TON | 1,935 | $206.85 | $206.80 | $223.34 | $205.00 |
| 56 | Scoring shoulders (continuous) (16IN width) (411-12.01) | LM | 1.60 | $4,702.50 | $6,878.03 | $2,748.34 | $1,500.00 |
| 57 | Scoring for centerline rumble (4IN width-24IN spacing) (411-12.05) | LM | 1 | $4,702.50 | $14,431 | $2,748.34 | $1,500.00 |
| 58 | Cold planing bituminous pavement (415-01.01) | TON | 635 | $92.66 | $86.25 | $93.15 | $95.00 |
| 59 | Structural steel (602-01) | LB | 64 | $20.00 | $20.31 | $150.54 | $200.00 |
| 60 | Class A concrete (roadway) (604-01.01) | CY | 8 | $2,825.00 | $9,331.58 | $10,645 | $2,000.00 |
| 61 | Steel bar reinforcement (roadway) (604-01.02) | LB | 1,240 | $3.38 | $2.82 | $8.98 | $4.00 |
| 62 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 1,330 | $182.50 | $193.38 | $232.48 | $200.00 |
| 63 | 24" concrete pipe culvert (class III) (607-05.02) | LF | 1,125 | $210.50 | $153.68 | $255.22 | $300.00 |
| 64 | 36" concrete pipe culvert (class III) (607-07.02) | LF | 178 | $227.00 | $350.25 | $308.31 | $450.00 |
| 65 | 60" concrete pipe culvert (class III) (607-11.03) | LF | 56 | $732.00 | $942.14 | $639.75 | $750.00 |
| 66 | 18" pipe culvert (side drain) (607-39.02) | LF | 495 | $63.00 | $111.46 | $183.31 | $175.00 |
| 67 | 30" pipe culvert (side drain) (607-39.04) | LF | 371 | $123.00 | $204.31 | $220.43 | $200.00 |
| 68 | Manholes, > 4' - 8' depth (611-01.02) | EACH | 2 | $11,874 | $10,834 | $10,041 | $12,000 |
| 69 | Manholes, > 8' - 12' depth (611-01.03) | EACH | 1 | $9,127.00 | $10,568 | $11,846 | $13,000 |
| 70 | Rework manhole (611-01.21) | EACH | 1 | $4,897.00 | $4,650.10 | $12,526 | $3,000.00 |
| 71 | Class A concrete (pipe endwalls) (611-07.01) | CY | 19.92 | $2,870.00 | $2,550.50 | $2,570.00 | $2,000.00 |
| 72 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 977 | $7.00 | $2.53 | $3.56 | $3.00 |
| 73 | 18IN endwall (side drain) (611-07.31) | EACH | 10 | $8,147.00 | $5,240.98 | $6,346.45 | $5,000.00 |
| 74 | 30IN endwall (side drain) (611-07.33) | EACH | 1 | $18,452 | $10,708 | $19,380 | $11,000 |
| 75 | 18IN endwall (cross drain) 3:1 (611-07.54) | EACH | 2 | $6,163.00 | $5,294.82 | $4,122.39 | $4,000.00 |
| 76 | 18IN endwall (cross drain) 4:1 (611-07.55) | EACH | 7 | $6,897.00 | $5,659.32 | $2,275.49 | $4,000.00 |
| 77 | 18IN endwall (cross drain) 6:1 (611-07.56) | EACH | 1 | $7,456.00 | $6,394.43 | $5,205.79 | $5,000.00 |
| 78 | 24IN endwall (cross drain) 3:1 (611-07.57) | EACH | 1 | $7,841.00 | $4,895.23 | $2,551.66 | $5,000.00 |
| 79 | 36IN endwall (cross drain) 3:1 (611-07.63) | EACH | 2 | $15,421 | $9,662.15 | $7,388.09 | $8,000.00 |
| 80 | Capping existing catchbasin (611-09.03) | EACH | 1 | $4,137.00 | $4,578.08 | $3,936.42 | $2,500.00 |
| 81 | Catch basins, type 25, 0' - 4' depth (611-25.01) | EACH | 4 | $13,257 | $10,264 | $8,317.38 | $25,000 |
| 82 | Catch basins, type 25, > 4' - 8' depth (611-25.02) | EACH | 15 | $15,234 | $11,045 | $24,598 | $25,000 |
| 83 | Catch basins, type 38, 0' - 4' depth (611-38.01) | EACH | 3 | $9,874.00 | $9,013.36 | $8,635.44 | $10,000 |
| 84 | Catch basins, type 38, > 4' - 8' depth (611-38.02) | EACH | 3 | $10,287 | $9,239.11 | $9,711.45 | $12,000 |
| 85 | 18" temporary drainage pipe (621-03.02) | LF | 100 | $61.00 | $112.93 | $103.97 | $60.00 |
| 86 | Concrete driveway (701-02) | SF | 247 | $31.00 | $22.56 | $186.72 | $30.00 |
| 87 | Concrete combined curb & gutter (702-03) | CY | 215 | $770.00 | $688.49 | $769.66 | $800.00 |
| 88 | Portland cement concrete ditch paving (703-01) | CY | 373 | $726.00 | $578.61 | $682.76 | $760.00 |
| 89 | Metal beam guard fence (705-01.04) | LF | 39 | $89.25 | $106.04 | $113.40 | $95.00 |
| 90 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 2,436 | $28.35 | $33.68 | $30.24 | $30.00 |
| 91 | Weak-post guardrail attachment to culvert(MASH TL-3) (705-06.09) | LF | 4 | $367.50 | $436.65 | $280.80 | $400.00 |
| 92 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 11 | $1,417.50 | $1,684.21 | $1,242.00 | $2,000.00 |
| 93 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 7 | $3,412.50 | $4,054.59 | $3,780.00 | $4,000.00 |
| 94 | Thrie beam bridge transition MASH TL-3 (705-06.25) | EACH | 8 | $3,570.00 | $4,241.72 | $2,484.00 | $4,500.00 |
| 95 | GR terminal (energy absorbing) MASH TL-2 (705-06.30) | EACH | 2 | $2,887.50 | $3,430.80 | $3,024.00 | $3,500.00 |
| 96 | Radius rail (706-06.03) | LF | 270 | $37.28 | $44.29 | $61.56 | $50.00 |
| 97 | Rounded end element (706-10.26) | EACH | 10 | $183.75 | $218.32 | $567.00 | $400.00 |
| 98 | Chain link fence (6 foot) (707-01.11) | LF | 375 | $29.00 | $32.44 | $28.08 | $50.00 |
| 99 | Removal of fence (chain-link fence) (707-06.01) | LF | 2,493 | $7.00 | $7.49 | $6.48 | $5.00 |
| 100 | Fence (barded wire) (707-08.01) | LF | 1,033 | $8.00 | $8.73 | $7.56 | $20.00 |
| 101 | High-visibility construction fence (707-08.11) | LF | 390 | $7.00 | $4.68 | $2.16 | $10.00 |
| 102 | Markers (concrete R.O.W. posts) (708-02.01) | EACH | 75 | $330.00 | $374.27 | $324.00 | $500.00 |
| 103 | Machined rip-rap (class A-1) (709-05.06) | TON | 569 | $60.14 | $78.79 | $88.97 | $140.00 |
| 104 | Machined rip-rap (class B) (709-05.08) | TON | 1,744 | $58.12 | $81.45 | $88.97 | $100.00 |
| 105 | Machined rip-rap (class C) (709-05.09) | TON | 350 | $59.57 | $82.89 | $88.97 | $125.00 |
| 106 | 6" pipe underdrain (710-09.02) | LF | 86 | $86.23 | $28.63 | $53.05 | $75.00 |
| 107 | Traffic control (712-01) | LS | 1 | $303,000 | $612,631 | $414,000 | $500,000 |
| 108 | Interconnected portable barrier rail (712-02.02) | LF | 510 | $90.00 | $136.34 | $143.80 | $60.00 |
| 109 | Portable barrier rail (MASH TL-3) (712-02.10) | LF | 220 | $125.00 | $182.80 | $285.89 | $70.00 |
| 110 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 4 | $7,350.00 | $14,699 | $5,420.19 | $9,000.00 |
| 111 | Flexible drums (channelizing) (712-04.01) | EACH | 1,233 | $44.10 | $52.40 | $41.04 | $60.00 |
| 112 | Warning lights (type A) (712-05.01) | EACH | 12 | $29.40 | $34.93 | $23.76 | $60.00 |
| 113 | Warning lights (type C) (712-05.03) | EACH | 49 | $29.40 | $34.93 | $23.76 | $60.00 |
| 114 | Signs (construction) (712-06) | SF | 2,064 | $9.19 | $10.92 | $7.83 | $15.00 |
| 115 | Temporary barricades (type III) (712-07.03) | LF | 160 | $18.90 | $22.46 | $30.78 | $55.00 |
| 116 | Class A concrete (foundation for sign supports) (713-01.01) | CY | 8 | $210.00 | $249.51 | $218.18 | $1,500.00 |
| 117 | Steel bar reinforcement(foundation for sign supports) (713-01.02) | LB | 1,863 | $1.05 | $1.25 | $1.09 | $4.00 |
| 118 | Concrete barrier/parapet delineator (713-02.26) | EACH | 6 | $6.30 | $7.48 | $6.55 | $60.00 |
| 119 | Perforated/knockout square tube post (713-11.02) | LB | 2,794 | $4.73 | $5.61 | $4.91 | $6.00 |
| 120 | P post slip base (713-11.21) | EACH | 36 | $556.50 | $661.21 | $578.18 | $750.00 |
| 121 | U post slip base (713-11.22) | EACH | 1 | $577.50 | $686.16 | $600.00 | $550.00 |
| 122 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 212 | $13.65 | $16.22 | $14.18 | $13.00 |
| 123 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 446 | $14.96 | $17.78 | $15.55 | $15.00 |
| 124 | Removal of signs, posts and footings (713-15) | LS | 1 | $525.00 | $623.78 | $545.45 | $5,000.00 |
| 125 | Removal & relocation of sign & support (713-15.02) | EACH | 12 | $157.50 | $187.13 | $163.64 | $1,000.00 |
| 126 | Changeable message sign unit (713-16.01) | EACH | 6 | $9,240.00 | $10,979 | $7,398.00 | $15,000 |
| 127 | Temporary raised pavement marker,yellow (716-01.07) | EACH | 1,002 | $11.00 | $12.48 | $10.80 | $20.00 |
| 128 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 160 | $44.00 | $49.90 | $43.20 | $50.00 |
| 129 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 32 | $44.00 | $49.90 | $43.20 | $50.00 |
| 130 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 29 | $27.50 | $31.19 | $27.00 | $30.00 |
| 131 | Plastic pavement marking (stop line) (716-02.05) | LF | 223 | $11.00 | $12.48 | $10.80 | $12.00 |
| 132 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 14 | $165.00 | $187.13 | $162.00 | $165.00 |
| 133 | Plastic pavement marking (straight-turn arrow) (716-04.01) | EACH | 3 | $192.50 | $218.33 | $189.00 | $200.00 |
| 134 | Painted pavement marking (stop line) (716-05.05) | LF | 304 | $5.78 | $6.55 | $5.67 | $6.00 |
| 135 | Painted pavement marking (6" line) (716-05.20) | LM | 13 | $1,650.00 | $1,871.35 | $1,620.00 | $1,300.00 |
| 136 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 5 | $6,792.50 | $7,703.71 | $6,669.00 | $6,250.00 |
| 137 | Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05) | LF | 2,213 | $1.38 | $1.56 | $1.35 | $1.50 |
| 138 | Mobilization (717-01) | LS | 1 | $773,500 | $1,145,000 | $900,000 | $1,950,000 |
| 139 | Removal of signal equipment (730-01.02) | EACH | 2 | $1,050.00 | $3,118.91 | $2,700.00 | $10,000 |
| 140 | Electrical service connection (730-05.01) | EACH | 2 | $8,610.00 | $4,366.48 | $3,780.00 | $5,000.00 |
| 141 | Cabinet (flasher) (730-15.33) | EACH | 2 | $2,247.00 | $3,118.91 | $2,700.00 | $3,000.00 |
| 142 | Controller (flasher) (730-16.05) | EACH | 2 | $2,079.00 | $623.79 | $540.00 | $2,000.00 |
| 143 | Pedestal pole (type B) (730-23.29) | EACH | 2 | $1,575.00 | $9,980.52 | $8,640.00 | $10,000 |
| 144 | Portable traffic signal system (730-40.01) | EACH | 13 | $16,485 | $19,587 | $17,127 | $17,500 |
| 145 | School speed limit flashing assembly (hard-wired) (730-50.31) | EACH | 2 | $3,055.50 | $5,807.73 | $5,027.67 | $6,000.00 |
| 146 | Geomembrane (740-06.01) | SY | 3,356 | $15.25 | $21.06 | $25.98 | $17.50 |
| 147 | Geogrid reinforcement type 2 (740-07.04) | SY | 2,105 | $6.00 | $6.67 | $18.33 | $15.00 |
| 148 | Geotextile (type III)(erosion control) (740-10.03) | SY | 1,137 | $5.00 | $8.27 | $3.84 | $12.00 |
| 149 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 22,799 | $4.00 | $8.34 | $0.56 | $10.00 |
| 150 | Seeding (with mulch) (801-01) | UNIT | 1,084 | $52.50 | $61.75 | $43.20 | $60.00 |
| 151 | Special wetland seed mixture (801-01.36) | UNIT | 2 | $210.00 | $998.05 | $270.00 | $900.00 |
| 152 | Natve seed MX final stablizatn of slopes (801-01.38) | UNIT | 35 | $52.50 | $86.08 | $108.00 | $70.00 |
| 153 | Seeding (without mulch) (801-02) | UNIT | 44 | $36.75 | $49.28 | $27.00 | $50.00 |
| 154 | Water (seeding & sodding) (801-03) | MG | 22 | $157.50 | $155.95 | $135.00 | $150.00 |
| 155 | Sodding (new sod) (803-01) | SY | 2,407 | $8.30 | $7.49 | $6.48 | $12.00 |
| 156 | Erosion control blanket (type I) (805-12.01) | SY | 17,432 | $1.10 | $1.25 | $1.08 | $2.00 |
| 157 | Project mowing (806-02.03) | CYCL | 6 | $2,940.00 | $5,614.04 | $1,959.64 | $10,000 |
| 158 | Removal of asbestos (202-01.02) | LS | 1 | $20,000 | $31,127 | $49,356 | $100,000 |
| 159 | Removal of structures (existing bridge no. 37SR031000) (202-04.01) | LS | 1 | $62,700 | $57,244 | $48,812 | $100,000 |
| 160 | Removal of structures (existing bridge no. 37-SR031-00.07) (202-04.02) | LS | 1 | $180,200 | $214,394 | $217,203 | $250,000 |
| 161 | Dry excavation (bridges) (204-02.01) | CY | 636 | $42.45 | $75.77 | $142.52 | $100.00 |
| 162 | Wet excavation (bridges) (204-03.01) | CY | 98 | $90.82 | $74.43 | $296.57 | $150.00 |
| 163 | Rock excavation (bridges) (204-04.01) | CY | 130 | $206.92 | $525.00 | $495.60 | $200.00 |
| 164 | Rock drilling (bridges) (204-05) | LF | 120 | $64.17 | $58.31 | $333.94 | $60.00 |
| 165 | Foundation preparation(bridge no. 2, pier no. 1, sta 230+68.21) (204-10.02) | LS | 1 | $82,515 | $133,000 | $201,460 | $200,000 |
| 166 | Foundation preparation(bridge no. 2, pier no. 2, sta 231+19.79) (204-10.03) | LS | 1 | $82,515 | $133,000 | $151,095 | $200,000 |
| 167 | Core drilling for piles(rock) (204-14) | LF | 165 | $331.12 | $1,011.79 | $502.60 | $500.00 |
| 168 | Core drilling for piles(soil) (204-15) | LF | 40 | $130.00 | $1,156.69 | $445.88 | $300.00 |
| 169 | Granular backfill (bridges) (303-01.02) | TON | 147 | $63.99 | $102.71 | $75.35 | $125.00 |
| 170 | Epoxy coated reinforcing steel (604-02.03) | LB | 100,524 | $2.16 | $1.92 | $1.86 | $3.00 |
| 171 | Class A concrete (bridges) (604-03.01) | CY | 433 | $1,798.14 | $2,436.29 | $3,069.73 | $1,500.00 |
| 172 | Steel bar reinforcement (bridges) (604-03.02) | LB | 64,723 | $2.75 | $1.87 | $1.64 | $2.50 |
| 173 | Pavement @ bridge ends (604-03.04) | SY | 547 | $458.32 | $658.03 | $436.74 | $650.00 |
| 174 | Class D concrete (bridge deck) (604-03.09) | CY | 339 | $1,858.56 | $2,431.92 | $2,956.72 | $2,200.00 |
| 175 | Applied texture finish (new structures) (604-04.01) | SY | 1,373 | $24.00 | $19.34 | $17.90 | $25.00 |
| 176 | Bridge deck grooving (mechanical) (604-05.31) | SY | 1,595 | $20.86 | $7.69 | $5.67 | $15.00 |
| 177 | Steel piles (10 inch) (606-02.03) | LF | 573 | $147.99 | $221.48 | $146.87 | $400.00 |
| 178 | Pile tips (steel piles, 10 inch) (606-02.06) | EACH | 22 | $292.27 | $325.00 | $605.25 | $1,000.00 |
| 179 | Prestressed concrete I-beam (type II) (615-01.02) | LF | 902 | $290.39 | $358.43 | $419.69 | $500.00 |
| 180 | Prestressed concrete box beam (33" X 36") (615-02.05) | LF | 616 | $460.34 | $606.34 | $621.16 | $750.00 |
| 181 | Bridge deck crack sealing (617-02) | LF | 239 | $11.92 | $8.28 | $132.88 | $50.00 |
| 182 | Sealant (HMWM) (617-05) | GAL | 2 | $500.00 | $374.56 | $4,156.36 | $750.00 |
| 183 | Concrete railing (620-06) | LF | 234 | $254.21 | $345.94 | $471.31 | $250.00 |
| 184 | Temporary shoring (621-05.02) | LS | 1 | $92,400 | $148,126 | $164,874 | $200,000 |
| 185 | Pole 35FT class 5 wood (790-02.04) | EACH | 1 | $2,342.00 | $2,782.07 | $946.08 | $1,500.00 |
| 186 | Pole 40FT class 4 wood (790-03.03) | EACH | 8 | $2,639.00 | $3,135.13 | $1,070.28 | $1,500.00 |
| 187 | Pole 45FT class 2 wood (790-04.02) | EACH | 4 | $3,130.00 | $3,718.64 | $1,495.80 | $2,000.00 |
| 188 | Pole 45FT class 3 wood (790-04.03) | EACH | 8 | $2,996.00 | $3,718.64 | $1,398.60 | $2,000.00 |
| 189 | Pole 50FT class 3 wood (790-05.03) | EACH | 3 | $3,397.00 | $4,036.20 | $1,501.20 | $2,000.00 |
| 190 | Pole 55FT class 2 wood (790-06.02) | EACH | 2 | $4,038.00 | $4,798.09 | $1,809.00 | $2,500.00 |
| 191 | 1PH SGL support 15KV (790-21.04) | EACH | 2 | $252.00 | $299.10 | $280.80 | $300.00 |
| 192 | 1PH DBL primary support 15KV (790-21.05) | EACH | 3 | $342.00 | $406.24 | $340.20 | $400.00 |
| 193 | 1PH primary med angle 15KV (790-21.06) | EACH | 2 | $360.00 | $427.62 | $351.00 | $450.00 |
| 194 | 1PH deadend 15KV (790-21.08) | EACH | 2 | $360.00 | $427.73 | $277.56 | $450.00 |
| 195 | 1PH vertical dde 15KV (790-21.10) | EACH | 3 | $920.00 | $1,092.87 | $401.76 | $500.00 |
| 196 | 3PH crossarm DBL prim sup LRG cond 15KV (790-25.11) | EACH | 11 | $1,608.00 | $1,910.07 | $1,317.60 | $1,500.00 |
| 197 | 3PH vertical 15KV (790-25.15) | EACH | 7 | $1,237.00 | $1,470.05 | $648.00 | $1,000.00 |
| 198 | 3PH crossarm deadend SGL 15KV (790-25.21) | EACH | 3 | $2,010.00 | $2,387.21 | $1,263.60 | $2,000.00 |
| 199 | 3PH crossarm dde 15KV (790-25.23) | EACH | 2 | $4,080.00 | $4,848.58 | $1,944.00 | $2,500.00 |
| 200 | 3PH crossarm DBL 10FT LRG cond 15KV (790-25.30) | EACH | 4 | $3,165.00 | $3,760.29 | $2,143.80 | $3,000.00 |
| 201 | Secondary assemblies small angle (790-30.01) | EACH | 3 | $98.00 | $115.69 | $118.80 | $150.00 |
| 202 | Secondary assemblies deadend (790-30.03) | EACH | 23 | $117.00 | $138.37 | $143.64 | $200.00 |
| 203 | Secondary conductor 1/0 AL triplex (790-30.14) | LF | 1,145 | $8.00 | $9.34 | $3.42 | $5.00 |
| 204 | Down guy - through bolt type (790-32.01) | EACH | 33 | $454.00 | $514.56 | $486.00 | $500.00 |
| 205 | OH guy - through bolt type (790-32.07) | EACH | 2 | $700.00 | $793.01 | $615.60 | $700.00 |
| 206 | Guy guard (790-32.23) | EACH | 37 | $30.00 | $33.15 | $10.80 | $20.00 |
| 207 | Screw type anchor 28,000LB (790-33.26) | EACH | 27 | $943.00 | $1,068.90 | $529.20 | $750.00 |
| 208 | Transfer service (790-36.04) | EACH | 4 | $298.00 | $337.31 | $313.20 | $500.00 |
| 209 | Transfer light (790-36.06) | EACH | 2 | $420.00 | $476.25 | $194.40 | $300.00 |
| 210 | Transfer 3-phase assembly (790-36.07) | EACH | 1 | $6,329.00 | $7,177.71 | $3,245.40 | $5,000.00 |
| 211 | Transfer existing 1PH transformer/recloser (790-36.11) | EACH | 9 | $1,820.00 | $2,062.86 | $815.40 | $1,000.00 |
| 212 | OH cond 2 7/1 acsr sparate (790-40.02) | LF | 566 | $3.00 | $3.59 | $1.67 | $3.00 |
| 213 | OH cond 1/0 6/1 acsr raven (790-40.03) | LF | 8,460 | $5.00 | $5.79 | $2.48 | $4.00 |
| 214 | Secondary pullbox large (790-43.46) | EACH | 1 | $2,357.00 | $2,672.61 | $1,404.00 | $2,000.00 |
| 215 | Secondary riser W/ 3IN conduit (790-43.51) | EACH | 1 | $1,868.00 | $2,118.18 | $1,263.60 | $1,500.00 |
| 216 | 1PH transformer (790-46.01) | EACH | 3 | $1,264.00 | $1,437.71 | $1,015.20 | $1,350.00 |
| 217 | Cutout knife switch, SNGL loadbreak 15KV (790-58.03) | EACH | 3 | $923.00 | $1,045.60 | $691.20 | $1,000.00 |
| 218 | Goab switch 15KV (790-58.06) | EACH | 2 | $11,184 | $12,683 | $7,020.00 | $10,000 |
| 219 | 3PH sectlr or recl W/ bypass SW 25KV (790-61.10) | EACH | 1 | $11,275 | $12,787 | $5,238.00 | $7,500.00 |
| 220 | Pole ground rod type (790-68.01) | EACH | 40 | $471.00 | $533.42 | $162.00 | $250.00 |
| 221 | Fiber tangent assembly (790-74.31) | EACH | 18 | $238.00 | $428.70 | $248.40 | $400.00 |
| 222 | Fiber deadend assembly (790-74.32) | EACH | 1 | $339.00 | $919.78 | $189.00 | $850.00 |
| 223 | Fiber double deadend assembly (790-74.33) | EACH | 6 | $523.00 | $1,442.05 | $216.00 | $1,250.00 |
| 224 | Remove wire (790-98.01) | LF | 13,480 | $2.20 | $2.50 | $1.57 | $2.00 |
| 225 | Remove poles (790-98.02) | EACH | 22 | $631.00 | $714.46 | $275.40 | $300.00 |
| 226 | Remove framing/associated apparatus (790-98.03) | EACH | 151 | $316.00 | $357.23 | $189.00 | $200.00 |
| 227 | Pole 35FT class 5 wood (793-01.08) | EACH | 4 | $2,625.00 | $2,782.20 | $1,320.84 | $1,500.00 |
| 228 | Pole 40FT class 4 wood (793-01.12) | EACH | 1 | $4,725.00 | $3,135.36 | $1,320.84 | $1,500.00 |
| 229 | Pole 45FT class 2 wood (793-01.16) | EACH | 3 | $5,775.00 | $3,718.64 | $1,320.84 | $2,000.00 |
| 230 | Pole 45FT class 3 wood (793-01.17) | EACH | 7 | $5,670.00 | $3,559.95 | $1,320.84 | $2,000.00 |
| 231 | Pole 50FT class 2 wood (793-01.20) | EACH | 1 | $6,510.00 | $4,036.20 | $1,637.05 | $2,000.00 |
| 232 | Pole 55FT class 2 wood (793-01.24) | EACH | 4 | $7,980.00 | $4,798.09 | $1,637.05 | $2,500.00 |
| 233 | Push brace (793-01.37) | EACH | 1 | $1,260.00 | $4,796.89 | $1,320.84 | $2,500.00 |
| 234 | Anchor 1 1/4IN (793-01.42) | EACH | 21 | $1,260.00 | $1,169.29 | $485.37 | $1,000.00 |
| 235 | Aerial splice closure (793-04.07) | EACH | 2 | $6,090.00 | $998.05 | $1,242.87 | $1,000.00 |
| 236 | Transfer aerial cable (793-04.08) | EACH | 2 | $420.00 | $397.51 | $176.49 | $500.00 |
| 237 | 144 fiber(material only) (793-07.07) | LF | 548 | $3.00 | $3.74 | $1.74 | $4.00 |
| 238 | 108-144 fiber(installation only) (793-07.17) | LF | 548 | $3.00 | $11.60 | $2.81 | $12.00 |
| 239 | Fiber optic maintenance loop (793-07.23) | EACH | 2 | $420.00 | $982.16 | $244.08 | $1,000.00 |
| 240 | Single fiber optic cable splice (793-07.25) | EACH | 288 | $63.00 | $69.86 | $50.19 | $75.00 |
| 241 | Expose existing cable/conduit (all depths) (793-10.20) | LF | 80 | $420.00 | $139.13 | $17.56 | $150.00 |
| 242 | Handhole 30INX48IN (793-11.20) | EACH | 1 | $6,090.00 | $6,127.75 | $1,979.10 | $5,500.00 |
| 243 | Concrete handhole 4FT X 4FT X 4FT (793-11.25) | EACH | 1 | $22,722 | $23,386 | $12,501 | $20,000 |
| 244 | Remove handhole (793-11.58) | EACH | 1 | $1,050.00 | $1,590.03 | $393.27 | $1,500.00 |
| 245 | 1 duct formation @ 36IN depth (793-13.12) | LF | 350 | $84.00 | $44.74 | $52.38 | $50.00 |
| 246 | 2 duct formation @ 36IN depth (793-13.17) | LF | 20 | $95.00 | $89.49 | $63.18 | $100.00 |
| 247 | 4 duct formation @ 36IN depth (793-13.27) | LF | 150 | $115.00 | $99.47 | $73.98 | $110.00 |
| 248 | Concrete encasement per duct (793-14.02) | LF | 640 | $25.00 | $33.06 | $16.20 | $35.00 |
| 249 | Multi duct (793-14.14) | LF | 520 | $6.00 | $15.21 | $5.42 | $15.00 |
| 250 | Transfer cable attachment (793-15.01) | EACH | 17 | $840.00 | $428.70 | $176.48 | $450.00 |
| 251 | Transfer dip cable/equipment (793-15.05) | EACH | 1 | $1,260.00 | $919.78 | $2,484.00 | $1,000.00 |
| 252 | Remove aerial cable and wire (793-98.01) | LF | 634 | $4.00 | $2.15 | $1.06 | $2.00 |
| 253 | Remove poles all sizes (793-98.04) | EACH | 16 | $525.00 | $1,247.57 | $222.75 | $750.00 |
| 254 | Remove fiber storage bracket (793-98.10) | EACH | 1 | $630.00 | $397.52 | $1,620.00 | $400.00 |
| 255 | 3IN PVC water line (795-03.03) | LF | 686 | $53.27 | $70.39 | $66.96 | $100.00 |
| 256 | 6IN PVC water line (795-03.05) | LF | 3,869 | $107.87 | $103.80 | $108.00 | $105.00 |
| 257 | HDD 6IN HDPE casing pipe-uncon (795-05.03) | LF | 52 | $654.00 | $756.75 | $540.00 | $450.00 |
| 258 | HDD 12IN HDPE casing pipe-uncon (795-05.06) | LF | 145 | $958.00 | $1,150.07 | $540.00 | $750.00 |
| 259 | Connect to 2IN water line (795-06.01) | EACH | 2 | $3,114.00 | $3,822.52 | $3,240.00 | $4,500.00 |
| 260 | Connect to 3IN water line (795-06.02) | EACH | 3 | $3,970.00 | $4,507.84 | $3,780.00 | $5,000.00 |
| 261 | Connect to 4IN water line (795-06.03) | EACH | 2 | $4,875.00 | $4,093.49 | $4,860.00 | $5,000.00 |
| 262 | Connect to 6IN water line (795-06.04) | EACH | 6 | $6,120.00 | $4,580.57 | $5,400.00 | $5,500.00 |
| 263 | 2IN gate valve assembly (795-08.01) | EACH | 2 | $3,842.00 | $2,141.73 | $2,700.00 | $3,500.00 |
| 264 | 3IN gate valve assembly (795-08.02) | EACH | 6 | $4,251.00 | $2,094.51 | $3,240.00 | $3,500.00 |
| 265 | 6IN gate valve assembly (795-08.04) | EACH | 18 | $4,878.00 | $3,449.45 | $3,888.00 | $4,000.00 |
| 266 | Relocate/reconnect service assembly (795-09.09) | EACH | 16 | $3,115.00 | $1,844.69 | $1,296.00 | $2,500.00 |
| 267 | Sample tap (795-09.10) | EACH | 3 | $4,321.00 | $1,340.16 | $540.00 | $2,000.00 |
| 268 | 3/4IN HDPE service pipe (795-09.14) | LF | 616 | $41.32 | $38.14 | $10.80 | $75.00 |
| 269 | Fire hydrant assembly (795-11.02) | EACH | 1 | $8,954.00 | $11,803 | $8,100.00 | $12,000 |
| 270 | Retire in place existing water main (795-11.12) | LF | 4,355 | $4.58 | $13.11 | $2.70 | $2.00 |
| 271 | 12IN HDPE casing open cut (795-30.05) | LF | 44 | $164.39 | $186.88 | $540.00 | $325.00 |
| 272 | Fiber optic cable enclosure (798-05.02) | EACH | 4 | $2,310.00 | $1,469.29 | $1,271.95 | $1,500.00 |
| 273 | Fiber optic cable splice (798-05.03) | EACH | 48 | $63.00 | $76.10 | $65.88 | $75.00 |
| 274 | 3/8IN high strength strand (798-05.07) | LF | 3,056 | $5.00 | $6.10 | $5.28 | $5.50 |
| 275 | Trunk/feeder cable .750 (798-05.13) | LF | 2,442 | $6.00 | $9.84 | $8.52 | $8.50 |
| 276 | Trunk/feeder cable .875 (798-05.16) | LF | 696 | $7.00 | $11.09 | $9.60 | $9.50 |
| 277 | Communication assembly (loop) (798-05.52) | EACH | 4 | $1,890.00 | $584.65 | $506.12 | $750.00 |
| 278 | Communication assembly (splice) (798-05.53) | EACH | 4 | $1,680.00 | $699.22 | $605.31 | $800.00 |
| 279 | Trunk/feeder cable .500 (798-05.57) | LF | 1,389 | $5.00 | $9.84 | $8.52 | $10.00 |
| 280 | Fiber optic cable (144F) (798-06.20) | LF | 2,331 | $6.00 | $8.60 | $7.44 | $8.00 |
| 281 | Line extender (798-06.55) | EACH | 1 | $1,722.00 | $699.22 | $605.31 | $750.00 |
| 282 | Remove steel strand (798-09.01) | LF | 3,062 | $4.00 | $2.36 | $2.04 | $2.50 |
| 283 | Remove aerial cable/terminals (798-09.02) | LF | 4,475 | $4.00 | $2.36 | $2.04 | $2.50 |
| 284 | Remove poles, guys, anchors (798-09.03) | EACH | 10 | $525.00 | $194.03 | $167.97 | $250.00 |
| 285 | Remove strand pole framing (798-09.08) | EACH | 23 | $525.00 | $124.73 | $107.98 | $200.00 |
| 286 | Remove fiber optic cable (798-09.09) | LS | 1 | $15,750 | $2.36 | $4,468.19 | $5,500.00 |
| 287 | Amplifier with service tap (798-10.12) | EACH | 1 | $13,272 | $1,045.70 | $905.25 | $1,250.00 |
| 288 | Amplifier assembly (798-10.15) | EACH | 1 | $4,725.00 | $1,045.70 | $905.25 | $1,250.00 |
| 289 | Service tap assembly (798-10.16) | EACH | 3 | $420.00 | $699.22 | $605.31 | $750.00 |
| 290 | Power installed anchor (798-11.31) | EACH | 10 | $1,260.00 | $1,170.22 | $1,207.78 | $1,200.00 |
| 291 | Downguy - wrap type (798-11.41) | EACH | 10 | $525.00 | $229.94 | $199.06 | $200.00 |
| 292 | Line extender with service tap (798-12.21) | EACH | 2 | $1,260.00 | $1,045.70 | $905.15 | $1,250.00 |
| 293 | Splitter (798-12.24) | EACH | 1 | $262.00 | $699.22 | $605.31 | $750.00 |
| 294 | Strand bond assembly (798-13.01) | EACH | 9 | $367.00 | $471.24 | $407.95 | $500.00 |
| 295 | Strand angle assembly (798-13.04) | EACH | 3 | $367.00 | $471.24 | $407.95 | $500.00 |
| 296 | Directional coupler (798-13.05) | EACH | 2 | $367.00 | $699.22 | $605.31 | $750.00 |
| 297 | Strand double deadend assembly (798-13.07) | EACH | 10 | $787.00 | $880.12 | $761.91 | $750.00 |
| 298 | Strand deadend assembly (798-13.08) | EACH | 3 | $367.00 | $471.24 | $407.95 | $500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of June 26, 2026. Compiled by Mirage Metrics.