Twin K Construction, Inc.: TDOT bid record
Twin K Construction, Inc. submitted 16 bids on Tennessee DOT contracts in the data, from 09 FEB 2018 to 21 MAR 2025, and was the low bidder on 4 of them (25%). When it was not low, its total sat a median +24% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $6,279,203
- Latest bid
- 21 MAR 2025
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 6 | 2 | 33% |
| 2020 | 3 | 1 | 33% |
| 2024 | 5 | 1 | 20% |
| 2025 | 2 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Campbell County | 3 | 1 | 33% |
| Campbell | 3 | 2 | 67% |
| Meigs County | 1 | 0 | 0% |
| Putnam County | 1 | 0 | 0% |
| Anderson County | 1 | 0 | 0% |
| Cumberland County | 1 | 0 | 0% |
| Smith | 1 | 0 | 0% |
| Knox | 1 | 0 | 0% |
| Jefferson | 1 | 0 | 0% |
| Monroe | 1 | 0 | 0% |
| Roane | 1 | 0 | 0% |
| Sevier | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Signs (construction) | 712-06 | SF | 16 | 10 (63%) | $8.35 | $8.00 |
| Sediment removal | 209-05 | CY | 16 | 9 (56%) | $24.00 | $31.36 |
| Geotextile (type III)(erosion control) | 740-10.03 | SY | 13 | 7 (54%) | $4.57 | $4.84 |
| Flexible drums (channelizing) | 712-04.01 | EACH | 16 | 6 (38%) | $32.79 | $34.50 |
| Machined rip-rap (class A-3) | 709-05.05 | TON | 11 | 5 (45%) | $58.10 | $67.50 |
| Changeable message sign unit | 713-16.01 | EACH | 10 | 5 (50%) | $5,165.87 | $6,095.00 |
| Road & drainage excavation (unclassified) | 203-01 | CY | 13 | 4 (31%) | $35.00 | $35.00 |
| Bituminous material for tack coat (TC) | 403-01 | TON | 12 | 4 (33%) | $1,104.51 | $969.62 |
| Temporary silt fence (with backing) | 209-08.02 | LF | 11 | 4 (36%) | $6.00 | $6.00 |
| Arrow board (type C) | 712-08.03 | EACH | 9 | 4 (44%) | $1,323.77 | $1,170.00 |
| Cold planing bituminous pavement | 415-01.02 | SY | 9 | 4 (44%) | $38.84 | $14.00 |
| Guardrail removed | 706-01 | LF | 8 | 4 (50%) | $1.33 | $2.12 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Southern Constructors, Inc. | 8 | 4 of 8 |
| Mid-State Construction Company, Inc. | 4 | 3 of 4 |
| Jamison Construction, LLC | 3 | 2 of 3 |
| Charles Blalock & Sons, Inc. | 3 | 0 of 3 |
| Whaley Construction, LLC | 3 | 1 of 3 |
| Potter South East LLC | 3 | 2 of 3 |
| Bell & Associates Construction, L.P. | 3 | 1 of 3 |
| Jones Bros. Contractors, LLC | 2 | 0 of 2 |
| J. Hill Excavating, LLC | 2 | 2 of 2 |
| Adams Contracting, LLC | 2 | 0 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 21 MAR 2025 | CNZ103 | Cumberland County | The construction of a small drainage structure on s.r. 298 at l.m. 8.5, including retaining walls | 2 of 2 | $2,227,773 | +27% |
| 07 FEB 2025 | CNZ080 | Campbell County | The construction of a small drainage structure on s.r. 63 near i-75 exit 141 (l.m. 6.43) | 2 of 3 | $1,719,999 | +30% |
| 06 DEC 2024 | CNY279 | Anderson County | The construction of a concrete i-beam bridge on s.r. 61 over brushy creek (l.m. 3.98), including grading, drainage, and paving | 2 of 3 | $9,375,028 | +14% |
| 04 OCT 2024 | CNY223 | Campbell County | The slide repair on i-75 northbound near m.m. 156.6 (l.m. 26.79) | 1 of 2 | $1,147,562 | Low, 18% under the second |
| 21 JUN 2024 | CNY172 | Campbell County | The improvement of the intersection on s.r. 63 at s.r. 297, and construction of a truck climbing lane from west of old s.r. 63 to west of st | 2 of 4 | $10,810,499 | +23% |
| 10 MAY 2024 | CNY903 | Putnam County | The construction of a concrete slab bridge on s.r. 135 at l.m. 13.57 | 2 of 6 | $520,688 | +1.0% |
| 22 MAR 2024 | CNY099 | Meigs County | The construction of a concrete box bridge on w memorial drive over decatur branch (l.m. 0.37) in decatur, including grading, drainage, and p | 2 of 3 | $710,000 | +25% |
| 26 JUN 2020 | CNU057 | Campbell | The grading, drainage and paving on s.r. 63 from near myers lane (l.m. 8.18) to frontier road/woodson lane (l.m. 13.10), including signals | 3 of 4 | $20,048,498 | +17% |
| 15 MAY 2020 | CNU220 | Campbell | The emergency slope stabilization on i-75 near m.m. 143.2 (l.m. 13.4) | 1 of 3 | $1,799,999 | Low, 24% under the second |
| 15 MAY 2020 | CNU218 | Smith | The emergency slope stabilization on s.r. 80 near l.m. 4.2 | 2 of 6 | $649,847 | +8.0% |
| 23 MAR 2018 | CNS159 | Roane | The repair of the bridge on warrior drive over i-40 (l.m. 1.20) in harriman | 4 of 7 | $758,490 | +24% |
| 23 MAR 2018 | CNS013 | Sevier | The grading, drainage, construction of a concrete i-beam bridge and paving on winfield dunn parkway/snyder road from north of lenz drive to | 1 of 4 | $2,534,000 | Low, 6.0% under the second |
| 09 FEB 2018 | CNS911 | Campbell | The repair of the bridge on s.r. 90 over clear fork creek (l.m. 5.97) | 1 of 3 | $797,642 | Low, 30% under the second |
| 09 FEB 2018 | CNS913 | Knox | The grading, drainage, signals and paving with portland cement concrete on the i-75 southbound ramp to callahan drive (exit 110, l.m. 1.76) | 2 of 2 | $1,498,397 | +5.0% |
| 09 FEB 2018 | CNS048 | Jefferson | The repair of the bridge on bell road over i-81 (l.m. 0.54) | 5 of 5 | $1,092,281 | +44% |
| 09 FEB 2018 | CNS049 | Monroe | The repair of the bridge on raby road over i-75 (l.m. 2.79) | 4 of 5 | $1,089,496 | +29% |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.