| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $60,500 | $24,500 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $95,450 | $78,500 |
| 3 | Removal of pipe (30 " CMP. sta. 14+19.00) (202-02.01) | LF | 88 | $95.00 | $400.00 |
| 4 | Road & drainage excavation (unclassified) (203-01) | CY | 2,514 | $80.00 | $100.00 |
| 5 | Placing and spreading topsoil (203-04) | CY | 142 | $33.00 | $45.00 |
| 6 | Water (203-06) | MG | 6 | $40.00 | $300.00 |
| 7 | Brooming & degrassing shoulders (208-01.05) | LM | 0.10 | $2,500.00 | $26,500 |
| 8 | Sediment removal (209-05) | CY | 145 | $25.00 | $18.00 |
| 9 | Temporary silt fence (with backing) (209-08.02) | LF | 1,426 | $7.35 | $6.00 |
| 10 | Rock check dam (209-08.07) | EACH | 22 | $785.00 | $1,000.00 |
| 11 | Enhanced rock check dam (209-08.08) | EACH | 6 | $945.00 | $1,500.00 |
| 12 | Sandbags (209-09.01) | BAG | 300 | $16.00 | $15.00 |
| 13 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 30 | $16.65 | $26.00 |
| 14 | Mineral aggregate, type A base, grading D (303-01) | TON | 769 | $55.15 | $67.00 |
| 15 | Mineral aggregate (size 57) (303-10.01) | TON | 13 | $89.00 | $84.00 |
| 16 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 254 | $135.65 | $136.00 |
| 17 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 158 | $187.00 | $176.00 |
| 18 | Bituminous material for prime coat (PC) (402-01) | TON | 2.10 | $1,885.00 | $1,820.00 |
| 19 | Aggregate for cover material (PC) (402-02) | TON | 7 | $370.00 | $307.00 |
| 20 | Bituminous material for tack coat (TC) (403-01) | TON | 0.60 | $1,687.00 | $1,475.00 |
| 21 | Saw cutting asphalt pavement (407-20.05) | LF | 60 | $25.75 | $28.00 |
| 22 | Acs mix(PG64-22) grading D (411-01.10) | TON | 107 | $303.75 | $312.00 |
| 23 | Scoring for rumble stripe (non-continuous) (4IN width) (411-12.04) | LM | 0.20 | $3,000.00 | $2,300.00 |
| 24 | Cold planing bituminous pavement (415-01.01) | TON | 20 | $514.00 | $540.00 |
| 25 | Retaining wall (wall 1) (604-07.01) | SF | 2,573 | $215.00 | $305.00 |
| 26 | Retaining wall (wall 2) (604-07.02) | SF | 450 | $368.00 | $420.00 |
| 27 | 36" concrete pipe culvert (class IV) (607-07.03) | LF | 62 | $185.00 | $900.00 |
| 28 | Horizontal drains (610-12.02) | LF | 300 | $110.55 | $136.00 |
| 29 | Class A concrete (pipe endwalls) (611-07.01) | CY | 3 | $2,585.00 | $7,800.00 |
| 30 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 109 | $6.00 | $10.00 |
| 31 | 24" temporary drainage pipe (621-03.03) | LF | 110 | $79.00 | $125.00 |
| 32 | Guardrail transition 27IN to 31IN (705-02.10) | EACH | 1 | $475.00 | $114.00 |
| 33 | Guardrail terminal (type 12) (705-04.02) | EACH | 2 | $5,600.00 | $5,700.00 |
| 34 | Earth pad for type 38 GR end treatment (705-04.09) | EACH | 1 | $1,555.85 | $900.00 |
| 35 | W beam GR (type 2) MASH TL-3 (long post) (705-06.02) | LF | 675 | $47.65 | $48.00 |
| 36 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 1 | $4,500.00 | $4,000.00 |
| 37 | Guardrail removed (706-01) | LF | 708 | $3.10 | $1.25 |
| 38 | Machined rip-rap (class A-3) (709-05.05) | TON | 120 | $90.00 | $65.00 |
| 39 | Machined rip-rap (class A-1) (709-05.06) | TON | 1,288 | $89.00 | $65.00 |
| 40 | Traffic control (712-01) | LS | 1 | $24,255 | $25,000 |
| 41 | Flexible drums (channelizing) (712-04.01) | EACH | 10 | $45.00 | $32.00 |
| 42 | Warning lights (type A) (712-05.01) | EACH | 14 | $40.00 | $25.00 |
| 43 | Signs (construction) (712-06) | SF | 1,028 | $13.66 | $10.00 |
| 44 | Temporary barricades (type III) (712-07.03) | LF | 48 | $23.00 | $21.00 |
| 45 | Perforated/knockout square tube post (713-11.02) | LB | 340 | $8.00 | $6.00 |
| 46 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 60 | $20.90 | $18.00 |
| 47 | Florescent yellow sign sheeting (713-13.14) | SF | 60 | $10.65 | $7.00 |
| 48 | Removal of signs, posts and footings (713-15) | LS | 1 | $1,899.00 | $1,200.00 |
| 49 | Changeable message sign unit (713-16.01) | EACH | 2 | $8,885.00 | $6,900.00 |
| 50 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 15 | $300.00 | $290.00 |
| 51 | Removal of snowplowable reflective marker (716-01.30) | EACH | 8 | $90.00 | $57.00 |
| 52 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 0.50 | $19,900 | $21,000 |
| 53 | Mobilization (717-01) | LS | 1 | $112,500 | $250,000 |
| 54 | Geotextile (type III)(erosion control) (740-10.03) | SY | 103 | $8.25 | $13.00 |
| 55 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 439 | $6.65 | $7.00 |
| 56 | Temporary sediment tube 12IN (740-11.02) | LF | 447 | $14.00 | $6.00 |
| 57 | By-pass pumping (797-11.38) | LS | 1 | $1,575.00 | $25,000 |
| 58 | Seeding (with mulch) (801-01) | UNIT | 17 | $120.00 | $100.00 |
| 59 | Temporary seeding (with mulch) (801-01.07) | UNIT | 24 | $100.00 | $50.00 |
| 60 | Bonded fiber matrix hydromulch (W/permanent seed) (801-01.16) | UNIT | 10 | $300.00 | $250.00 |
| 61 | Natve seed MX final stablizatn of slopes (801-01.38) | UNIT | 10 | $310.00 | $120.00 |
| 62 | Water (seeding & sodding) (801-03) | MG | 4.40 | $125.00 | $150.00 |
| 63 | Erosion control blanket (type II) (805-12.02) | SY | 586 | $2.72 | $3.00 |