TDOT contract CNZ080 bid tabulation

The construction of a small drainage structure on s.r. 63 near i-75 exit 141 (l.m. 6.43). Let by Tennessee DOT on February 7, 2025, Campbell County. 3 bids received; low bid $1,321,013 by Pave Grade & Aggregate, Inc.

Owner
Tennessee DOT
Letting
07 FEB 2025
Pay items
55
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Pave Grade & Aggregate, Inc$1,321,013Low
2Twin K Construction, Inc.$1,719,999+30%
3Southern Constructors, Inc.$2,546,696+93%
TDOT contract CNZ080: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Pave Grade & Aggregate, Inc2. Twin K Construction, Inc.3. Southern Constructors, Inc.
1Construction stakes, lines and grades (105-01)LS1$14,500$27,232$30,000
2Clearing and grubbing (201-01)LS1$241,000$190,000$18,000
3Road & drainage excavation (unclassified) (203-01)CY747$35.00$70.00$120.00
4Borrow excavation (unclassified) (203-03)CY769$35.00$70.00$135.00
5Water (203-06)MG2$100.00$625.00$200.00
6Furnishing & spreading topsoil (203-07)CY47.37$100.00$105.00$180.00
7Flowable fill (general) (204-06.01)CY90$300.00$550.00$900.00
8Brooming & degrassing shoulders (208-01.05)LM0.10$15,000$46,000$3,000.00
9Filter sock (12 inch) (209-03.21)LF225$12.00$12.00$15.00
10Protected area marker (white with decal) (209-03.99)EACH2$300.00$790.00$1,200.00
11Sediment removal (209-05)CY3$100.00$80.00$80.00
12Temporary silt fence (with backing) (209-08.02)LF133$10.00$14.00$18.00
13Temporary stream diversion (209-65.14)LS1$20,000$70,000$280,000
14Mineral aggregate, type A base, grading D (303-01)TON33$100.00$130.00$80.00
15Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08)TON7$1,000.00$350.00$400.00
16Bituminous material for prime coat (PC) (402-01)TON2$400.00$1,500.00$2,000.00
17Aggregate for cover material (PC) (402-02)TON1$400.00$1,900.00$600.00
18Bituminous material for tack coat (TC) (403-01)TON1$2,000.00$1,200.00$1,200.00
19Acs mix(PG70-22) grading D (411-02.10)TON100$400.00$275.00$350.00
20Cold planing bituminous pavement (415-01.01)TON99$150.00$100.00$130.00
2154" concrete pipe culvert (class IV) (607-10.03)LF63$1,000.00$1,000.00$1,400.00
2254" concrete pipe culvert(class IV)jacked-in-place (607-10.05)LF130$3,000.00$5,000.00$8,000.00
23Manholes, > 20' - 24' depth (611-01.06)EACH1$45,000$100,000$200,000
24Class A concrete (pipe endwalls) (611-07.01)CY11$2,200.00$3,750.00$4,000.00
25Steel bar reinforcement (pipe endwalls) (611-07.02)LB451$4.25$8.00$10.00
2636" temporary drainage pipe (621-03.05)LF100$200.00$140.00$180.00
27High-visibility construction fence (707-08.11)LF300$8.00$5.00$7.00
28Machined rip-rap (class A-3) (709-05.05)TON200$30.00$53.00$140.00
29Traffic control (712-01)LS1$52,000$60,000$47,000
30Interconnected portable barrier rail (712-02.02)LF310$35.00$65.00$90.00
31Temporary work zone crash cushion (MASH TL-3) (712-02.60)EACH4$8,000.00$8,800.00$12,000
32Flexible drums (channelizing) (712-04.01)EACH20$50.00$48.00$60.00
33Barrier rail delineator (712-04.50)EACH15$30.00$25.00$40.00
34Signs (construction) (712-06)SF328$18.00$13.00$20.00
35Signs (R-1) (713-16.20)EACH1$380.00$400.00$680.00
36Remove and replace sign (guide sign sta. 14+15 RT.) (713-16.50)EACH1$9,000.00$9,000.00$14,000
37Plastic pavement marking (stop line) (716-02.05)LF34$20.00$18.00$30.00
38Painted pavement marking (4" line) (716-05.01)LM0.25$3,000.00$2,400.00$3,000.00
39Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM0.25$16,000$12,000$20,000
40Mobilization (717-01)LS1$181,500$155,800$250,000
41Geotextile (type III)(erosion control) (740-10.03)SY186$10.00$10.00$22.00
42Temporary sediment tube 12IN (740-11.02)LF281$10.00$11.00$13.00
43Temporary seeding (with mulch) (801-01.07)UNIT9$1,000.00$175.00$150.00
44Natve seed MX final stablizatn of slopes (801-01.38)UNIT9$200.00$360.00$280.00
45Seeding (without mulch) (801-02)UNIT10$200.00$150.00$80.00
46Water (seeding & sodding) (801-03)MG6$100.00$200.00$200.00
47Acer negundo (box elder 2-5FT CNTNR GRWN) (802-11.01)EACH4$200.00$225.00$300.00
48Acer rubrum (red maple 2-5FT CNTNR GRWN) (802-11.02)EACH4$200.00$250.00$300.00
49Betula nigra (river birch 2-5FT CNTNR GRWN) (802-11.07)EACH4$200.00$250.00$300.00
50Cercis canadensis (redbud 2-5FT CNTNR GRWN) (802-11.11)EACH4$200.00$225.00$310.00
51Cornus florida (flowering dogwood 2-5FT CNTNR GRWN) (802-11.12)EACH4$200.00$250.00$300.00
52Fagus grandifolia (beech 2-5FT CNTNR GRWN) (802-11.15)EACH4$200.00$300.00$300.00
53Platanus occidentalis (sycamore 2-5FT CNTNR GRWN) (802-11.26)EACH4$200.00$275.00$300.00
54Sodding (new sod) (803-01)SY341$15.00$16.00$20.00
55700 gram coir fiber erosion blanket (805-12.08)SY740$8.00$14.00$15.00
TDOT contract CNZ080: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of February 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy