TDOT letting results, February 6, 2026
62 contracts let by Tennessee DOT on February 6, 2026, $130,161,139 in low bids, a median of 3 bidders per contract.
- Owner
- Tennessee DOT
- Contracts
- 62
- Low bids, total
- $130,161,139
- Data through
- 02 OCT 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| CN261011 | The new construction on the s.r. 449 extension (veteran's boulevard) from u.s. 411 (s.r. 35) to near robert henderson road, and miscellaneous improvements on u. | Sevier County | 1 | Charles Blalock & Sons, Inc. | $25,993,101 | TDOT | ||
| CN261005 | The repair of the bridges on u.s. 321 (s.r. 73) over tellico lake and s.r. 444 (l.m. 8.72) | Loudon County | 5 | Mid-State Construction Company, Inc. | $5,082,040 | $5,500,751 | +8.0% | TDOT |
| CN264001 | The retracing of pavement markings with spray thermoplastic and random on-call pavement marking on various interstate and state routes | Counties Benton, Carroll, Chester, Crockett, Decatur, Dyer, Fayette, Gibson, Hardeman, Hardin, Haywood, Henderson, Henry, Lake, Lauderdale, Madison, Mcnairy, Obion, Shelby, Tipton, And Weakley | 1 | Traf-Mark Industries, L.L.C. | $4,993,915 | TDOT | ||
| CN261008 | The resurfacing on u.s. 11e (u.s. 19, s.r. 34) from the washington county line (l.m. 0.00) to near weaver branch road (l.m. 6.10), including bridge expansion jo | Sullivan County | 2 | Summers-Taylor, Inc. | $4,397,293 | $5,162,684 | +17% | TDOT |
| CN264014 | The resurfacing with cold in-place recycling (microsurface or thin mix overlay) on s.r. 224 from u.s. 64 (s.r. 15) (l.m. 12.15) in mcnairy county to s.r. 22a (l | Chester And Mcnairy Counties | 1 | Standard Construction Company, Inc. | $4,335,182 | TDOT | ||
| CN261004 | The resurfacing on u.s. 11w (s.r. 1) from near afg road (l.m. 30.60) to near garland avenue (l.m. 36.05), and on s.r. 346 at various sections between l.m. 8.17 | Hawkins County | 1 | W-L Construction & Paving, Inc. | $4,271,649 | TDOT | ||
| CN263010 | The resurfacing on s.r. 12 from near cato road (l.m. 6.09) to the cheatham county line (l.m. 13.27) | Davidson County | 4 | Eubank Asphalt Paving & Sealing, LLC | $3,912,693 | $4,111,957 | +5.0% | TDOT |
| CN263022 | The resurfacing on u.s. 41a (s.r. 12) from u.s. 31e (s.r. 6) (l.m. 0.00) to near s.r. 112 (l.m. 4.30), including bridge deck repair and thin epoxy overlay | Davidson County | 3 | Vulcan Construction Materials, LLC | $3,487,173 | $3,695,698 | +6.0% | TDOT |
| CN261007 | The retracing of pavement markings with spray thermoplastic and random on-call pavement marking on various interstate and state routes | Counties Anderson, Blount, Campbell, Carter, Claiborne, Cocke, Grainger, Greene, Hamblen, Hancock, Hawkins, Jefferson, Johnson, Knox, Loudon, Monroe, Morgan, Roane, Scott, Sevier, Sullivan, Unicoi, Union, And Washington | 3 | Mullen's Markings, Inc | $3,176,070 | $3,536,548 | +11% | TDOT |
| CN263006 | The resurfacing on s.r. 50 from park plus drive (l.m. 16.57) to near seavy hight road (l.m. 24.05) | Maury County | 4 | Eubank Asphalt Paving & Sealing, LLC | $2,662,248 | $2,850,699 | +7.0% | TDOT |
| CN262008 | The resurfacing on s.r. 26 from near old snow hill road (l.m. 15.90) to west of curtis road (l.m. 20.30) | Dekalb County | 3 | Rogers Group, Inc. | $2,635,592 | $2,682,047 | +2.0% | TDOT |
| CN263015 | The resurfacing with hot in-place recycling (microsurface or thin mix overlay) on s.r. 373 from s.r. 50 (l.m. 0.00) to kirkland road (l.m. 8.21) | Maury County | 3 | Lincoln Paving, LLC | $2,597,150 | $2,677,629 | +3.0% | TDOT |
| CN262012 | The resurfacing with cold in-place recycling on s.r. 111 from near lewis chapel road (l.m. 4.32) to near east valley road (l.m. 7.57) | Sequatchie County | 3 | Tinsley Asphalt, LLC | $2,595,572 | $2,682,827 | +3.0% | TDOT |
| CN263021 | The resurfacing on s.r. 265 (central pike) from s.r. 109 (l.m. 10.47) to s.r. 266 (l.m. 20.20) | Wilson County | 3 | Wiregrass Construction Company, Inc | $2,575,169 | $2,743,555 | +7.0% | TDOT |
| CN263004 | The retracing of pavement markings with spray thermoplastic and random on-call pavement marking on various interstate and state routes | Counties Bedford, Cheatham, Davidson, Dickson, Giles, Hickman, Houston, Humphreys, Lawrence, Lewis, Lincoln, Macon, Marshall, Maury, Montgomery, Moore, Perry, Robertson, Rutherford, Smith, Stewart, Sumner, Trousdale, Wayne, Williamson, And Wilson | 2 | Reynolds Sealing & Striping, Inc. | $2,551,810 | $2,693,435 | +6.0% | TDOT |
| CN264013 | The resurfacing (microsurface or thin mix overlay) on s.r. 54 from near thomas street (l.m. 13.62) to the crockett county line (l.m. 24.63), including repair wo | Haywood County | 3 | Ford Construction Company | $2,415,468 | $2,559,296 | +6.0% | TDOT |
| CN262013 | 002,89s055-f8-002 the resurfacing (microsurface or thin mix overlay) on s.r. 55 from s.r. 379 (l.m. 1.10) to east of hallum lane (l.m. 8.55) and on s.r. 55 bus | Warren County | 3 | Asphalt Paving Systems, Inc. | $2,347,281 | $2,905,511 | +24% | TDOT |
| CN264004 | The construction of a concrete bulb-tee beam bridge on s.r. 180 over lost creek (l.m. 4.75) and a concrete box beam bridge over overflow (l.m. 4.57), including | Haywood County | 3 | Ford Construction Company | $2,284,348 | $2,752,259 | +20% | TDOT |
| CN263005 | The resurfacing on s.r. 7 from near the bridge over snow creek (l.m. 23.11) to the bridge over leipers creek (l.m. 29.30) | Maury County | 5 | Eubank Asphalt Paving & Sealing, LLC | $2,185,981 | $2,323,628 | +6.0% | TDOT |
| CN262019 | The construction of a concrete bulb-tee beam bridge on old lower river road over south mouse creek (l.m. 13.09), including grading, drainage, and paving | Bradley County | 5 | Wright Brothers Civil Construction, LLC | $2,047,777 | $2,392,255 | +17% | TDOT |
| CN262014 | The resurfacing (microsurface or thin mix overlay) on u.s. 70s (s.r. 1) from the van buren county line (l.m. 0.00) to s.r. 111 (l.m. 7.70), including concrete r | White County | 3 | Asphalt Paving Systems, Inc. | $1,772,621 | $1,904,855 | +7.0% | TDOT |
| CN262009 | The resurfacing with cold in-place recycling on u.s. 72 (s.r. 27) from north of s.r. 156 (l.m. 2.73) to i-24 (l.m. 4.22) | Marion County | 2 | Tinsley Asphalt, LLC | $1,673,742 | $2,019,400 | +21% | TDOT |
| CN263013 | The resurfacing on s.r. 261 from antioch road (l.m. 6.88) to the kentucky state line (l.m. 13.41) | Macon County | 2 | Rogers Group, Inc. | $1,599,467 | $1,698,177 | +6.0% | TDOT |
| CN262015 | 289(5),93s289-f3-002,93s289-f8-002 the resurfacing on s.r. 135 from s.r. 289 (l.m. 0.00) to south of s.r. 111 (l.m. 2.10), including bridge expansion joint repa | White County | 2 | Rogers Group, Inc. | $1,545,281 | $1,628,372 | +5.0% | TDOT |
| CN263009 | The interchange lighting along i-40 at golden bear gateway/beckwith road (exit 229) | Wilson County | 4 | S & W Contracting Company, LLC | $1,512,176 | $1,585,153 | +5.0% | TDOT |
| CN263003 | The retracing of painted pavement marking lines on various interstate and state routes | Counties Bedford, Cheatham, Dickson, Giles, Hickman, Houston, Humphreys, Lewis, Lincoln, Macon, Marshall, Maury, Montgomery, Moore, Perry, Robertson, Rutherford, Smith, Stewart, Sumner, Trousdale, Wayne, Williamson, And Wilson | 2 | Oglesby Construction, Inc. | $1,469,792 | $1,555,050 | +6.0% | TDOT |
| CN264009 | The resurfacing on s.r. 188 from s.r. 104 (l.m. 2.55) to s.r. 77 (l.m. 10.19), including thin epoxy overlay on bridges | Gibson County | 1 | Pavement Restorations, Inc. | $1,460,173 | TDOT | ||
| CN263023 | The resurfacing on s.r. 242 from west gaines street (l.m. 22.90) to near flatwoods road (l.m. 28.20), including repair work on bridges | Lawrence County | 2 | Rogers Group, Inc. | $1,419,282 | $1,836,325 | +29% | TDOT |
| CN264008 | The resurfacing on s.r. 105 from the dyer county line (l.m. 0.00) to u.s. 45w (s.r. 5) (l.m. 8.98) | Gibson County | 1 | Pavement Restorations, Inc. | $1,396,045 | TDOT | ||
| CN262003 | R2bvar-m3-062,r2bvar-m3-063 the retracing of pavement markings with spray thermoplastic and random on-call pavement marking on various interstate and state rout | Counties Bledsoe, Bradley, Cannon, Clay, Coffee, Cumberland, Dekalb, Fentress, Franklin, Grundy, Hamilton, Jackson, Marion, Mcminn, Meigs, Overton, Pickett, Polk, Putnam, Rhea, Sequatchie, Van Buren, Warren, And White | 3 | Mullen's Markings, Inc | $1,395,890 | $1,399,725 | 0.0% | TDOT |
| CN262016 | The resurfacing (microsurface or thin mix overlay) on s.r. 64 from the coffee county line to south of u.s. 70s (s.r. 1) and on s.r. 99 from the rutherford count | Cannon County | 5 | Asphalt Paving Systems, Inc. | $1,393,298 | $1,839,062 | +32% | TDOT |
| CN263020 | The resurfacing (microsurface or thin mix overlay) on s.r. 99 from west of mt. herman road (l.m. 24.50) to the cannon county line (l.m. 33.10) | Rutherford County | 6 | Asphalt Paving Systems, Inc. | $1,386,279 | $1,541,231 | +11% | TDOT |
| CN263008 | The resurfacing on s.r. 227 from the wayne county line (l.m. 0.00) to u.s. 43 (s.r. 6) (l.m. 6.70) | Lawrence County | 2 | Rogers Group, Inc. | $1,363,482 | $1,491,814 | +9.0% | TDOT |
| CN262017 | The resurfacing on s.r. 58 from s.r. 17 (l.m. 2.17) to near 21st street west (l.m. 4.55) | Hamilton County | 2 | Wright Brothers Construction Company, Inc. | $1,350,888 | $1,550,117 | +15% | TDOT |
| CN264007 | The resurfacing on s.r. 105 from shiloh road (l.m. 23.65) to near wayne lloyd road (l.m. 28.51), including thin epoxy overlay on bridges | Gibson County | 2 | Murray Paving, Inc. | $1,295,078 | $1,314,520 | +2.0% | TDOT |
| CN263011 | The resurfacing on s.r. 82 from west of couch lane (l.m. 16.70) to s.r. 64 (l.m. 22.16) | Bedford County | 3 | Hawkins Asphalt Paving, LLC | $1,265,644 | $1,318,523 | +4.0% | TDOT |
| CN263012 | The resurfacing on s.r. 48 from u.s. 412 (s.r. 20) (l.m. 10.71) to the hickman county line (l.m. 17.03) | Lewis County | 2 | Eubank Asphalt Paving & Sealing, LLC | $1,245,740 | $1,481,282 | +19% | TDOT |
| CN263007 | The resurfacing on s.r. 166 from the giles county line (l.m. 0.00) to s.r. 243 (l.m. 7.60) | Maury County | 4 | Rogers Group, Inc. | $1,229,882 | $1,248,454 | +2.0% | TDOT |
| CN264006 | The resurfacing on s.r. 103 from near s.r. 181 (l.m. 1.55) to s.r. 78 (l.m. 8.37), including thin epoxy overlay on bridges | Dyer County | 1 | Pavement Restorations, Inc. | $1,216,728 | TDOT | ||
| CN261010 | The resurfacing on s.r. 81 from near s.r. 75 (l.m. 17.99) to near s.r. 93 (l.m. 23.42) | Washington County | 1 | Summers-Taylor, Inc. | $1,203,412 | TDOT | ||
| CN263018 | The resurfacing on s.r. 128 from holder cemetery road (l.m. 6.05) to s.r. 13 (l.m. 12.12), including thin epoxy overlay on the bridge at l.m. 6.78 | Perry County | 3 | Eubank Asphalt Paving & Sealing, LLC | $1,146,862 | $1,194,533 | +4.0% | TDOT |
| CN264012 | The resurfacing (microsurface or thin mix overlay) on s.r. 179 from s.r. 54 (l.m. 0.00) to s.r. 14 (l.m. 5.76) | Tipton County | 2 | Asphalt Paving Systems, Inc. | $1,102,296 | $1,223,038 | +11% | TDOT |
| CN262005 | The microsurfacing on s.r. 52 from near poor house road to the overton county line, and from the clay county line to west of robbins lane, including bridge expa | Clay And Overton Counties | 3 | Asphalt Paving Systems, Inc. | $1,090,060 | $1,264,476 | +16% | TDOT |
| CN263019 | The resurfacing on s.r. 102 from near brackin court (l.m. 11.62) to s.r. 266 (l.m. 13.04) | Rutherford County | 4 | Vulcan Construction Materials, LLC | $1,077,549 | $1,118,676 | +4.0% | TDOT |
| CN262002 | The retracing of painted pavement marking lines on various interstate and state routes | Counties Bledsoe, Bradley, Cannon, Clay, Coffee, Cumberland, Dekalb, Fentress, Franklin, Grundy, Hamilton, Jackson, Marion, Mcminn, Overton, Pickett, Polk, Putnam, Rhea, Van Buren, Warren, And White | 4 | The Aero-Mark Company, LLC | $1,050,000 | $1,087,800 | +4.0% | TDOT |
| CN262011 | The resurfacing on s.r. 314 from u.s. 64 (u.s. 74, s.r. 40) (l.m. 0.00) to u.s. 411 (s.r. 33) (l.m. 6.08) | Polk County | 2 | Wright Brothers Construction Company, Inc. | $999,555 | $1,138,716 | +14% | TDOT |
| CN264005 | The retracing of painted pavement marking lines on various interstate and state routes | Counties Fayette, Lauderdale, Shelby, And Tipton | 2 | Oglesby Construction, Inc. | $914,132 | $953,054 | +4.0% | TDOT |
| CN262004 | The microsurfacing on s.r. 145 from u.s. 70s (s.r. 1) (l.m. 0.00) to s.r. 96 (l.m. 9.67) | Cannon County | 2 | Asphalt Paving Systems, Inc. | $832,743 | $1,095,204 | +32% | TDOT |
| CN263014 | The resurfacing on s.r. 270 from u.s. 31a (s.r. 11) (l.m. 0.00) to the bedford county line (l.m. 3.08) | Marshall County | 4 | Eubank Asphalt Paving & Sealing, LLC | $788,390 | $800,948 | +2.0% | TDOT |
| CN263017 | The resurfacing on s.r. 12 from near robin hill drive (l.m. 5.90) to east old ashland city road (l.m. 8.43) | Montgomery County | 3 | Eubank Asphalt Paving & Sealing, LLC | $709,537 | $870,966 | +23% | TDOT |
| CN262007 | The upgrade of interchange lighting on i-24 at exit 110 (s.r. 53, l.m. 13.00) and exit 114 (u.s. 41/s.r. 2, l.m. 17.25) in manchester | Coffee County | 4 | S & W Contracting Company, LLC | $696,025 | $734,380 | +6.0% | TDOT |
| CN262001 | R2bvar-m3-065 the relensing of snowplowable pavement markers on various interstate and state routes | Counties Bledsoe, Cannon, Coffee, Franklin, Grundy, Marion, Sequatchie, Van Buren, And Warren | 3 | W. L. Markers, Inc. | $651,610 | $708,136 | +9.0% | TDOT |
| CN263016 | The resurfacing on u.s. 41 (s.r. 11) from the robertson county line (l.m. 0.00) to the kentucky state line (l.m. 2.97) | Montgomery County | 3 | Eubank Asphalt Paving & Sealing, LLC | $635,858 | $659,506 | +4.0% | TDOT |
| CN261003 | The microsurfacing on s.r. 107 from the cocke county line (l.m. 0.00) to s.r. 70 (l.m. 7.87) | Greene County | 2 | Asphalt Paving Systems, Inc. | $604,752 | $1,050,184 | +74% | TDOT |
| CN261001 | The retracing of painted pavement marking lines on various interstate and state routes | Counties Anderson, Blount, Campbell, Carter, Claiborne, Cocke, Grainger, Greene, Hamblen, Hancock, Hawkins, Jefferson, Johnson, Knox, Loudon, Monroe, Morgan, Roane, Scott, Sevier, And Washington | 4 | Oglesby Construction, Inc. | $547,030 | $550,000 | +1.0% | TDOT |
| CN262010 | The microsurfacing on s.r. 111 from south of twin oaks road (l.m. 15.94) to near wildwood lane (l.m. 20.07) | Overton County | 3 | Asphalt Paving Systems, Inc. | $543,495 | $651,495 | +20% | TDOT |
| CN263002 | The relensing of snowplowable pavement markers on various interstate and state routes | Counties Bedford, Cheatham, Davidson, Dickson, Giles, Hickman, Houston, Humphreys, Lawrence, Lewis, Lincoln, Macon, Marshall, Maury, Montgomery, Moore, Perry, Robertson, Rutherford, Smith, Sumner, Trousdale, Williamson, And Wilson | 2 | A & A Safety, Inc. | $505,374 | $509,055 | +1.0% | TDOT |
| CN264003 | R4bvar-m3-088 the relensing of snowplowable pavement markers on various interstate and state routes | Counties Benton, Carroll, Decatur, Dyer, Fayette, Haywood, Henderson, Madison, Obion, And Shelby | 2 | W. L. Markers, Inc. | $393,785 | $454,906 | +16% | TDOT |
| CN261002 | The relensing of snowplowable pavement markers on various interstate and state routes | Counties Anderson, Blount, Campbell, Claiborne, Cocke, Greene, Jefferson, Knox, Morgan, Roane, Scott, Sullivan, And Washington | 3 | A & A Safety, Inc. | $367,619 | $372,332 | +1.0% | TDOT |
| CN263001 | The miscellaneous safety improvements on various local roads | Houston And Stewart Counties | 4 | Mountain Home Construction LLC | $287,811 | $304,449 | +6.0% | TDOT |
| CN264011 | The crack sealing at various locations on various state routes | Crockett County | 5 | Etchmark Pavement Maintenance Experts, LLC | $245,615 | $247,245 | +1.0% | TDOT |
| CN264010 | The crack sealing at various locations on various state routes | Carroll County | 5 | Etchmark Pavement Maintenance Experts, LLC | $228,630 | $235,599 | +3.0% | TDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.