TDOT contract CN264004 bid tabulation
The construction of a concrete bulb-tee beam bridge on s.r. 180 over lost creek (l.m. 4.75) and a concrete box beam bridge over overflow (l.m. 4.57), including grading, drainage, and paving. Let by Tennessee DOT on February 6, 2026, Haywood County. 3 bids received; low bid $2,284,348 by Ford Construction Company.
- Owner
- Tennessee DOT
- Letting
- 06 FEB 2026
- Pay items
- 76
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ford Construction Company | $2,284,348 | Low |
| 2 | Dement Construction Group, LLC | $2,752,259 | +20% |
| 3 | Bell & Associates Construction, LLC | $3,564,548 | +56% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ford Construction Company | 2. Dement Construction Group, LLC | 3. Bell & Associates Construction, LLC |
|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $21,000 | $65,000 | $14,370 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $15,000 | $60,000 | $93,093 |
| 3 | Road & drainage excavation (unclassified) (203-01) | CY | 2,219 | $12.00 | $18.00 | $40.00 |
| 4 | Borrow excavation (unclassified) (203-03) | CY | 5,504 | $12.00 | $23.00 | $50.00 |
| 5 | Placing and spreading topsoil (203-04) | CY | 708 | $3.50 | $19.00 | $32.00 |
| 6 | Water (203-06) | MG | 7 | $35.00 | $10.00 | $55.00 |
| 7 | Sediment removal (209-05) | CY | 126 | $25.00 | $10.00 | $30.00 |
| 8 | Temporary silt fence (with backing) (209-08.02) | LF | 8,498 | $3.40 | $3.40 | $6.00 |
| 9 | Rock check dam (209-08.07) | EACH | 4 | $900.00 | $900.00 | $1,200.00 |
| 10 | Enhanced rock check dam (209-08.08) | EACH | 2 | $1,030.00 | $1,200.00 | $1,400.00 |
| 11 | Temporary diversion channel (209-65.03) | LF | 192 | $15.00 | $40.00 | $450.00 |
| 12 | Mineral aggregate, type A base, grading D (303-01) | TON | 1,450 | $53.00 | $50.00 | $70.00 |
| 13 | Mineral aggregate (size 57) (303-10.01) | TON | 1,058 | $61.50 | $55.00 | $75.00 |
| 14 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 742 | $160.00 | $160.00 | $178.00 |
| 15 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 542 | $170.00 | $170.00 | $189.00 |
| 16 | Bituminous material for prime coat (PC) (402-01) | TON | 8 | $200.00 | $200.00 | $222.00 |
| 17 | Aggregate for cover material (PC) (402-02) | TON | 26 | $5.00 | $5.00 | $5.00 |
| 18 | Bituminous material for tack coat (TC) (403-01) | TON | 4 | $1,000.00 | $1,000.00 | $1,110.00 |
| 19 | Saw cutting asphalt pavement (407-20.05) | LF | 524 | $12.00 | $12.00 | $10.00 |
| 20 | Acs mix(PG64-22) grading D (411-01.10) | TON | 344 | $180.00 | $180.00 | $200.00 |
| 21 | Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03) | LM | 0.60 | $14,955 | $14,955 | $20,807 |
| 22 | Cold planing bituminous pavement (415-01.02) | SY | 409 | $45.00 | $35.00 | $27.00 |
| 23 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 350 | $31.00 | $29.25 | $34.50 |
| 24 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 8 | $3,250.00 | $3,100.00 | $3,607.00 |
| 25 | Thrie beam agt (long span) MASH TL-3 (705-06.28) | EACH | 8 | $6,150.00 | $5,000.00 | $6,825.00 |
| 26 | Guardrail removed (706-01) | LF | 537 | $3.00 | $1.00 | $1.00 |
| 27 | High-visibility construction fence (707-08.11) | LF | 1,730 | $2.25 | $2.25 | $3.50 |
| 28 | Markers (concrete R.O.W. posts) (708-02.01) | EACH | 20 | $350.00 | $500.00 | $300.00 |
| 29 | Machined rip-rap (class A-3) (709-05.05) | TON | 200 | $60.00 | $45.00 | $50.00 |
| 30 | Machined rip-rap (class A-1) (709-05.06) | TON | 503 | $60.00 | $55.00 | $90.00 |
| 31 | Machined rip-rap (class B) (709-05.08) | TON | 975 | $60.00 | $55.00 | $80.00 |
| 32 | Traffic control (712-01) | LS | 1 | $27,000 | $25,000 | $15,163 |
| 33 | Warning lights (type A) (712-05.01) | EACH | 6 | $25.00 | $19.00 | $28.00 |
| 34 | Signs (construction) (712-06) | SF | 709 | $7.50 | $9.00 | $8.50 |
| 35 | Temporary barricades (type III) (712-07.03) | LF | 80 | $12.00 | $14.00 | $13.00 |
| 36 | Class A concrete (foundation for sign supports) (713-01.01) | CY | 1 | $750.00 | $600.00 | $832.00 |
| 37 | Steel bar reinforcement(foundation for sign supports) (713-01.02) | LB | 194 | $3.25 | $3.00 | $3.50 |
| 38 | Steel I-beams & WF-beams(breakaway) sign support (713-06) | LB | 408 | $9.20 | $10.00 | $17.00 |
| 39 | Perforated/knockout square tube post (713-11.02) | LB | 261 | $4.65 | $4.50 | $5.00 |
| 40 | P post slip base (713-11.21) | EACH | 5 | $520.00 | $500.00 | $577.00 |
| 41 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 3 | $16.00 | $15.00 | $18.00 |
| 42 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 116 | $16.85 | $15.00 | $18.00 |
| 43 | Removal of signs, posts and footings (713-15) | LS | 1 | $250.00 | $500.00 | $277.00 |
| 44 | Changeable message sign unit (713-16.01) | EACH | 3 | $2,000.00 | $5,000.00 | $5,771.00 |
| 45 | Raised PVMT markers (BI-directional) (1 color lens) (716-01.11) | EACH | 29 | $30.00 | $30.00 | $33.00 |
| 46 | Removal of snowplowable reflective marker (716-01.30) | EACH | 7 | $35.00 | $100.00 | $10.00 |
| 47 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 1.60 | $12,500 | $12,500 | $13,872 |
| 48 | Mobilization (717-01) | LS | 1 | $80,000 | $246,742 | $356,454 |
| 49 | Geogrid reinforcement type 2 (740-07.04) | SY | 489 | $30.00 | $6.00 | $7.00 |
| 50 | Geotextile (type III)(erosion control) (740-10.03) | SY | 514 | $5.00 | $3.00 | $4.00 |
| 51 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 540 | $4.00 | $6.00 | $6.00 |
| 52 | Seeding (with mulch) (801-01) | UNIT | 84 | $50.00 | $50.00 | $83.00 |
| 53 | Temporary seeding (with mulch) (801-01.07) | UNIT | 84 | $40.00 | $40.00 | $67.00 |
| 54 | Fertilizer (801-02.15) | TON | 2 | $1,500.00 | $1,500.00 | $833.00 |
| 55 | Water (seeding & sodding) (801-03) | MG | 59 | $50.00 | $50.00 | $22.00 |
| 56 | Sodding (new sod) (803-01) | SY | 4,166 | $3.25 | $3.25 | $8.50 |
| 57 | Erosion control blanket (type I) (805-12.01) | SY | 200 | $2.50 | $2.50 | $8.00 |
| 58 | Removal of asbestos (202-01.02) | LS | 1 | $10,000 | $25,000 | $15,000 |
| 59 | Removal of structures (exist. bridge no. 38-SR180-0457) (202-04.02) | LS | 1 | $5,000.00 | $70,000 | $23,500 |
| 60 | Removal of structures (superstructure) (202-04.01) | LS | 1 | $8,000.00 | $70,000 | $35,000 |
| 61 | Dry excavation (bridges) (204-02.01) | CY | 273 | $18.00 | $28.00 | $50.00 |
| 62 | Granular backfill (bridges) (303-01.02) | TON | 82 | $77.00 | $77.00 | $55.00 |
| 63 | Epoxy coated reinforcing steel (604-02.03) | LB | 53,256 | $1.74 | $2.00 | $1.75 |
| 64 | Class A concrete (bridges) (604-03.01) | CY | 148 | $926.00 | $1,300.00 | $1,200.00 |
| 65 | Steel bar reinforcement (bridges) (604-03.02) | LB | 22,726 | $1.64 | $1.75 | $1.50 |
| 66 | Pavement @ bridge ends (604-03.04) | SY | 302 | $372.00 | $400.00 | $500.00 |
| 67 | Class D concrete (bridge deck) (604-03.09) | CY | 184 | $1,200.00 | $1,300.00 | $1,400.00 |
| 68 | Applied texture finish (new structures) (604-04.01) | SY | 961 | $15.99 | $16.00 | $18.00 |
| 69 | Bridge deck grooving (mechanical) (604-05.31) | SY | 802 | $7.70 | $8.00 | $8.50 |
| 70 | Test piles (steel pipe piles, 14-inch) (606-18.01) | LF | 379 | $133.00 | $127.00 | $150.00 |
| 71 | Loading test (steel pipe piles, 14-inch) (606-18.02) | EACH | 3 | $7,000.00 | $6,500.00 | $17,100 |
| 72 | Steel pipe piles (14-inch) (606-18.03) | LF | 3,273 | $118.00 | $93.00 | $157.00 |
| 73 | Erection of bridge beams (615-01.20) | LS | 1 | $53,000 | $50,000 | $110,000 |
| 74 | Conc parapet single slope (STD-1-1SS) (620-05.01) | LF | 508 | $170.00 | $175.00 | $160.00 |
| 75 | 6" perforated pipe with vertical drain system (710-09.01) | LF | 248 | $26.00 | $44.00 | $80.00 |
| 76 | 6" pipe underdrain (710-09.02) | LF | 68 | $15.00 | $17.00 | $37.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of February 6, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.