Ford Construction Company: TDOT bid record
Ford Construction Company submitted 62 bids on Tennessee DOT contracts in the data, from 09 FEB 2018 to 14 AUG 2026, and was the low bidder on 38 of them (61%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $169,480,497
- Latest bid
- 14 AUG 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 9 | 5 | 56% |
| 2020 | 5 | 4 | 80% |
| 2023 | 2 | 2 | 100% |
| 2024 | 18 | 10 | 56% |
| 2025 | 11 | 5 | 45% |
| 2026 | 17 | 12 | 71% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Dyer County | 7 | 7 | 100% |
| Obion County | 5 | 5 | 100% |
| Madison County | 5 | 3 | 60% |
| Haywood County | 5 | 3 | 60% |
| Weakley County | 4 | 4 | 100% |
| Chester County | 4 | 0 | 0% |
| Dyer | 3 | 2 | 67% |
| Madison | 3 | 1 | 33% |
| Fayette County | 2 | 0 | 0% |
| Shelby County | 2 | 1 | 50% |
| Lake County | 2 | 2 | 100% |
| Tipton County | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Signs (construction) | 712-06 | SF | 34 | 25 (74%) | $7.00 | $8.00 |
| Enhanced flatline thermo PVMT MRKNG (6IN line) | 716-12.02 | LM | 31 | 24 (77%) | $8,250.00 | $7,425.00 |
| Plastic pavement marking (stop line) | 716-02.05 | LF | 27 | 23 (85%) | $30.00 | $17.30 |
| Flexible drums (channelizing) | 712-04.01 | EACH | 22 | 16 (73%) | $35.00 | $34.50 |
| Arrow board (type C) | 712-08.03 | EACH | 19 | 15 (79%) | $939.75 | $1,170.00 |
| Bituminous material for tack coat (TC) | 403-01 | TON | 24 | 14 (58%) | $1,000.00 | $969.62 |
| Painted pavement marking (6" line) | 716-05.20 | LM | 20 | 14 (70%) | $2,150.00 | $1,400.00 |
| Bituminous material for prime coat (PC) | 402-01 | TON | 17 | 14 (82%) | $500.00 | $1,175.00 |
| Plastic pavement marking(channelization striping) | 716-02.04 | SY | 15 | 14 (93%) | $35.00 | $29.75 |
| Road & drainage excavation (unclassified) | 203-01 | CY | 18 | 13 (72%) | $18.50 | $35.00 |
| Plastic pavement marking (turn lane arrow) | 716-02.06 | EACH | 16 | 13 (81%) | $225.00 | $200.68 |
| Tangent energy absorbing term MASH TL-3 | 705-06.20 | EACH | 16 | 13 (81%) | $3,325.00 | $3,468.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Delta Contracting Company, LLC | 21 | 13 of 21 |
| Jones Bros. Contractors, LLC | 7 | 2 of 7 |
| Dement Construction Company, LLC | 5 | 3 of 5 |
| Volunteer Bridge Construction, Inc. | 4 | 1 of 4 |
| Bell & Associates Construction, LLC | 4 | 0 of 4 |
| Thomson & Thomson, Inc. | 4 | 3 of 4 |
| Dement Construction Group, LLC | 4 | 1 of 4 |
| Martin Paving Company, Inc. | 2 | 2 of 2 |
| Harold Coffey Construction Co., Inc. | 1 | 0 of 1 |
| Rowe Construction Group, Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 14 AUG 2026 | CN264048 | Dyer County | The intersection improvements on s.r. 78 at s.r. 182 (l.m. 4.9) | 1 of 1 | $3,530,883 | Low |
| 14 AUG 2026 | CN264052 | Tipton County | The miscellaneous safety improvements on u.s. 51 (s.r. 3) at the intersection of rialto/leighs chapel road (l.m. 20.97 - l.m. 21.50) | 2 of 2 | $3,223,106 | +15% |
| 26 JUN 2026 | CN264041 | Chester County | The construction of turn lanes on s.r. 100 at the intersection of s.r. 225 (l.m. 7.78), including grading, drainage, and paving | 2 of 2 | $1,261,463 | +20% |
| 26 JUN 2026 | CN264043 | Dyer County | The resurfacing on s.r. 210 from near the lauderdale county line (l.m. 0.00) to u.s. 412 (s.r. 20) (l.m. 6.71), including bridge expansion j | 1 of 1 | $4,271,034 | Low |
| 26 JUN 2026 | CN264903 | Dyer County | The construction of a multimodal path along s.r. 211 from samaria bend road (l.m. 0.47) to horner road (l.m. 1.09) in dyersburg | 1 of 2 | $2,063,677 | Low, 19% under the second |
| 26 JUN 2026 | CN264049 | Dyer County | The construction of a concrete bulb-tee beam bridges on s.r. 211 over overflow (l.m. 1.31) and over the north fork forked deer river (l.m. 1 | 1 of 3 | $18,762,364 | Low, 4.0% under the second |
| 26 JUN 2026 | CN264045 | Haywood County | The resurfacing on u.s. 70 (s.r. 1) from u.s. 70a (u.s. 79, s.r. 76) (l.m. 17.31) to the madison county line (l.m. 28.09), including thin ep | 2 of 2 | $6,799,878 | +5.0% |
| 26 JUN 2026 | CN264037 | Lake County | The grading, drainage, and paving on s.r. 22 and cates landing road serving project sonic | 1 of 1 | $4,125,618 | Low |
| 26 JUN 2026 | CN264042 | Tipton County | The grading, drainage, and paving on u.s. 51 (s.r. 3) from north of myron creek (l.m. 7.00) to south of old hwy 51 south (l.m. 8.00) | 1 of 3 | $2,022,557 | Low, 4.0% under the second |
| 08 MAY 2026 | CN264035 | Obion County | The resurfacing on s.r. 184 from church street (l.m. 0.17) to catron road (l.m. 7.57) | 1 of 1 | $3,687,955 | Low |
| 20 MAR 2026 | CN264024 | Haywood County | The resurfacing on s.r. 76 from north washington avenue (l.m. 13.90) to alsey williams road (l.m. 18.39), including bridge expansion joint r | 2 of 2 | $2,386,746 | +23% |
| 20 MAR 2026 | CN264021 | Obion County | The resurfacing on u.s. 45w (s.r. 5) from the gibson county line (l.m. 0.00) to polk station road (l.m. 7.15) | 1 of 1 | $4,373,504 | Low |
| 20 MAR 2026 | CN264022 | Obion County | The resurfacing on s.r. 43 from the weakley county line (l.m. 0.00) to the kentucky state line (l.m. 6.60) | 1 of 1 | $8,056,626 | Low |
| 20 MAR 2026 | CN264026 | Shelby County | The repair of bridges on i-40 (eb and wb) over chester street (l.m. 29.74) | 2 of 6 | $1,596,107 | +2.0% |
| 20 MAR 2026 | CN264023 | Weakley County | The resurfacing on s.r. 54 from cane creek (l.m. 6.21) to s.r. 22 (l.m. 10.74) | 1 of 2 | $2,397,873 | Low, 8.0% under the second |
| 06 FEB 2026 | CN264004 | Haywood County | The construction of a concrete bulb-tee beam bridge on s.r. 180 over lost creek (l.m. 4.75) and a concrete box beam bridge over overflow (l. | 1 of 3 | $2,284,348 | Low, 20% under the second |
| 06 FEB 2026 | CN264013 | Haywood County | The resurfacing (microsurface or thin mix overlay) on s.r. 54 from near thomas street (l.m. 13.62) to the crockett county line (l.m. 24.63), | 1 of 3 | $2,415,468 | Low, 6.0% under the second |
| 05 DEC 2025 | CNZ336 | Dyer County | 3(181),23s003-f3-008,23s003-f8-008 the resurfacing on u.s. 51 (s.r. 3) from near ragan levee road (l.m. 6.10) to near u.s. 412 (s.r. 20) (l. | 1 of 1 | $10,406,465 | Low |
| 05 DEC 2025 | CNZ307 | Gibson County | The construction of a concrete box beam bridge on salem street over roe creek (l.m. 0.68), including grading, drainage, and paving | 2 of 5 | $1,907,131 | +17% |
| 05 DEC 2025 | CNZ334 | Madison County | The resurfacing on u.s. 70 (s.r. 1) from near s.r. 186 (l.m. 13.83) to near mobile street (l.m. 16.05) (includes s. church street and s.r. 1 | 2 of 3 | $3,503,148 | +13% |
| 03 OCT 2025 | CNZ268 | Weakley County | The miscellaneous safety improvements including resurfacing on various local roads | 1 of 1 | $1,688,595 | Low |
| 15 AUG 2025 | CNZ215 | Benton County | The construction of a concrete box culvert on fern avenue over cane creek (l.m. 1.26) in camden | 2 of 2 | $1,067,419 | +7.0% |
| 15 AUG 2025 | CNZ219 | Counties Carroll, Gibson, Henderson, And Madison | The ada curb ramp upgrades on various state routes | 3 of 3 | $538,271 | +63% |
| 25 JUL 2025 | CNZ239 | Haywood County | The resurfacing on u.s. 70 (u.s. 79, s.r. 1) from near big muddy creek canal (l.m. 6.28) to s.r. 19 (l.m. 14.84), including thin epoxy overl | 1 of 1 | $3,305,733 | Low |
| 27 JUN 2025 | CNZ182 | Crockett County | The grading, drainage, construction of a concrete i-beam bridge, and paving on u.s. 79 (s.r. 76) for industrial access support serving proje | 3 of 3 | $21,367,676 | +20% |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way