| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $66,000 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $87,000 |
| 3 | Removal of structures and obstructions (202-01) | LS | 1 | $35,000 |
| 4 | Removal of buildings (tract no. 7) (202-06.01) | LS | 1 | $22,000 |
| 5 | Road & drainage excavation (unclassified) (203-01) | CY | 28,015 | $20.00 |
| 6 | Placing and spreading topsoil (203-04) | CY | 1,358 | $8.00 |
| 7 | Water (203-06) | MG | 170 | $35.00 |
| 8 | Furnishing & spreading topsoil (203-07) | CY | 1,360 | $8.00 |
| 9 | Foundation fill material (204-08) | CY | 10 | $90.00 |
| 10 | Backfill material (flowable fill) (204-08.01) | CY | 10 | $900.00 |
| 11 | Brooming & degrassing shoulders (208-01.05) | LM | 1 | $1,500.00 |
| 12 | Filter sock (24 inch) (209-03.23) | LF | 780 | $7.00 |
| 13 | Sediment removal (209-05) | CY | 255 | $20.00 |
| 14 | Temporary silt fence (without backing) (209-08.03) | LF | 4,510 | $1.75 |
| 15 | Enhanced rock check dam (209-08.08) | EACH | 26 | $1,200.00 |
| 16 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 200 | $5.00 |
| 17 | Catch basin protection (type D) (209-40.33) | EACH | 1 | $400.00 |
| 18 | Temporary diversion channel (209-65.03) | LF | 110 | $20.00 |
| 19 | Mineral aggregate, type B base, grading (see plans) (303-02) | TON | 9,580 | $56.00 |
| 20 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 530 | $262.00 |
| 21 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 2,025 | $158.00 |
| 22 | Bituminous material for prime coat (PC) (402-01) | TON | 27 | $500.00 |
| 23 | Aggregate for cover material (PC) (402-02) | TON | 81 | $5.00 |
| 24 | Bituminous material for tack coat (TC) (403-01) | TON | 12 | $1,375.00 |
| 25 | Acs mix(PG64-22) grading D (411-01.10) | TON | 1,100 | $215.00 |
| 26 | Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03) | LM | 0.34 | $12,500 |
| 27 | Cold planing bituminous pavement (415-01.01) | TON | 108 | $150.00 |
| 28 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 196 | $200.00 |
| 29 | 24" concrete pipe culvert (class III) (607-05.02) | LF | 70 | $250.00 |
| 30 | 24" concrete pipe culvert (class V) trenchless (607-05.11) | LF | 110 | $1,200.00 |
| 31 | 42" concrete pipe culvert (class V) trenchless (607-08.11) | LF | 93 | $2,109.33 |
| 32 | 18" pipe culvert (side drain) (607-39.02) | LF | 301 | $145.50 |
| 33 | 18IN endwall (side drain) (611-07.31) | EACH | 2 | $5,000.00 |
| 34 | 18IN endwall (cross drain) 3:1 (611-07.54) | EACH | 4 | $2,000.00 |
| 35 | 18IN endwall (cross drain) 4:1 (611-07.55) | EACH | 1 | $2,500.00 |
| 36 | 18IN endwall (cross drain) 6:1 (611-07.56) | EACH | 1 | $3,000.00 |
| 37 | 24IN endwall (cross drain) 3:1 (611-07.57) | EACH | 1 | $2,500.00 |
| 38 | 24IN endwall (cross drain) 6:1 (611-07.59) | EACH | 3 | $4,500.00 |
| 39 | 42IN endwall (cross drain) 3:1 (611-07.66) | EACH | 2 | $12,500 |
| 40 | Catch basins, type 42, > 8' - 12' depth (611-42.03) | EACH | 1 | $12,500 |
| 41 | 18" temporary drainage pipe (621-03.02) | LF | 101 | $100.00 |
| 42 | Concrete driveway (701-02) | SF | 3,940 | $22.00 |
| 43 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 300 | $34.00 |
| 44 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 2 | $3,400.00 |
| 45 | Guardrail removed (706-01) | LF | 217 | $6.65 |
| 46 | High-visibility construction fence (707-08.11) | LF | 520 | $2.75 |
| 47 | Markers (concrete R.O.W. posts) (708-02.01) | EACH | 31 | $400.00 |
| 48 | Machined rip-rap (class A-3) (709-05.05) | TON | 350 | $70.00 |
| 49 | Machined rip-rap (class B) (709-05.08) | TON | 420 | $70.00 |
| 50 | Traffic control (712-01) | LS | 1 | $50,000 |
| 51 | Interconnected portable barrier rail (712-02.02) | LF | 5,180 | $35.00 |
| 52 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 10 | $6,700.00 |
| 53 | Flexible drums (channelizing) (712-04.01) | EACH | 186 | $35.00 |
| 54 | Barrier rail delineator (712-04.50) | EACH | 267 | $12.00 |
| 55 | Warning lights (type A) (712-05.01) | EACH | 14 | $15.00 |
| 56 | Signs (construction) (712-06) | SF | 374 | $6.00 |
| 57 | Temporary barricades (type III) (712-07.03) | LF | 32 | $15.00 |
| 58 | Temporary transverse rumble strips (712-10.02) | LF | 192 | $37.50 |
| 59 | Sign post delineation enhancement (713-02.21) | LF | 42 | $5.50 |
| 60 | Perforated/knockout square tube post (713-11.02) | LB | 998 | $4.00 |
| 61 | P post slip base (713-11.21) | EACH | 7 | $350.00 |
| 62 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 1 | $12.00 |
| 63 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 130 | $14.00 |
| 64 | Extruded aluminum panel signs (713-14) | SF | 15 | $35.00 |
| 65 | Removal of signs, posts and footings (713-15) | LS | 1 | $350.00 |
| 66 | Dead end sign and support (713-16.06) | EACH | 1 | $250.00 |
| 67 | Temporary raised pavement marker,yellow (716-01.07) | EACH | 43 | $30.00 |
| 68 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 13 | $100.00 |
| 69 | Removal of snowplowable reflective marker (716-01.30) | EACH | 10 | $25.00 |
| 70 | Plastic pavement marking (stop line) (716-02.05) | LF | 142 | $35.00 |
| 71 | Painted pavement marking (4" line) (716-05.01) | LM | 2.40 | $3,200.00 |
| 72 | Painted pavement marking (8" barrier line) (716-05.02) | LF | 3,750 | $1.15 |
| 73 | Painted pavement marking (6" line) (716-05.20) | LM | 2.10 | $3,200.00 |
| 74 | Removal of pavement marking (line) (716-08.01) | LF | 3,000 | $1.50 |
| 75 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 1 | $15,000 |
| 76 | Spray thermo PVMT MRKNG (60 mil) (4IN line) (716-13.01) | LM | 1 | $9,500.00 |
| 77 | Mobilization (717-01) | LS | 1 | $175,000 |
| 78 | Geotextile (type III)(erosion control) (740-10.03) | SY | 700 | $5.00 |
| 79 | Temporary sediment tube 24IN (740-11.05) | LF | 4,200 | $5.00 |
| 80 | Seeding (with mulch) (801-01) | UNIT | 10 | $50.00 |
| 81 | Temporary seeding (with mulch) (801-01.07) | UNIT | 60 | $35.00 |
| 82 | Temporary mulch (801-01.65) | UNIT | 20 | $50.00 |
| 83 | Water (seeding & sodding) (801-03) | MG | 303 | $20.00 |
| 84 | Sodding (new sod) (803-01) | SY | 29,630 | $3.50 |
| 85 | Turf reinforcement mat (class I) (805-01.01) | SY | 90 | $4.50 |
| 86 | Erosion control blanket (type IV) (805-12.04) | SY | 90 | $4.50 |