TDOT contract CN264049 bid tabulation
The construction of a concrete bulb-tee beam bridges on s.r. 211 over overflow (l.m. 1.31) and over the north fork forked deer river (l.m. 1.71), including grading, drainage, retaining wall, and paving. Let by Tennessee DOT on June 26, 2026, Dyer County. 3 bids received; low bid $18,762,364 by Ford Construction Company.
- Owner
- Tennessee DOT
- Letting
- 26 JUN 2026
- Pay items
- 123
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ford Construction Company | $18,762,364 | Low |
| 2 | Louis-Company, LLC | $19,486,217 | +4.0% |
| 3 | Dement Construction Group, LLC | $19,677,753 | +5.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ford Construction Company | 2. Louis-Company, LLC | 3. Dement Construction Group, LLC |
|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $149,934 | $269,328 | $200,000 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $75,941 | $156,281 | $150,000 |
| 3 | Removal of rigid pavement, sidewalk, etc. (202-03) | SY | 531 | $38.67 | $52.77 | $15.00 |
| 4 | Removal of asphalt pavement (202-03.01) | SY | 252 | $43.63 | $172.50 | $15.00 |
| 5 | Road & drainage excavation (unclassified) (203-01) | CY | 6,050 | $13.86 | $28.98 | $18.00 |
| 6 | Placing and spreading topsoil (203-04) | CY | 227 | $7.96 | $37.99 | $25.00 |
| 7 | Water (203-06) | MG | 15 | $33.49 | $574.88 | $40.00 |
| 8 | Construction of haul road (203-50) | LS | 1 | $408,000 | $216,649 | $600,000 |
| 9 | Brooming & degrassing shoulders (208-01.05) | LM | 0.90 | $1,292.40 | $16,818 | $1,500.00 |
| 10 | Sediment removal (209-05) | CY | 18 | $25.43 | $479.07 | $60.00 |
| 11 | Temporary silt fence (with backing) (209-08.02) | LF | 5,392 | $3.80 | $4.79 | $5.50 |
| 12 | Enhanced rock check dam (209-08.08) | EACH | 9 | $1,032.86 | $598.51 | $750.00 |
| 13 | Sediment filter bag(15' X 10') (209-09.04) | EACH | 1 | $601.86 | $109.82 | $500.00 |
| 14 | Curb inlet protection (type 4) (209-09.43) | EACH | 20 | $400.00 | $62.84 | $350.00 |
| 15 | Catch basin filter assembly(type 2) (209-40.42) | EACH | 9 | $750.00 | $418.95 | $850.00 |
| 16 | Temporary in stream diversion (209-65.04) | LF | 149 | $291.35 | $1,165.02 | $60.00 |
| 17 | Mineral aggregate, type A base, grading D (303-01) | TON | 301 | $63.82 | $83.20 | $70.00 |
| 18 | Mineral aggregate (size 57) (303-10.01) | TON | 58 | $64.93 | $77.14 | $100.00 |
| 19 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 783 | $153.00 | $183.14 | $153.00 |
| 20 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 285 | $260.00 | $311.22 | $260.00 |
| 21 | Bituminous material for prime coat (PC) (402-01) | TON | 11 | $500.00 | $598.51 | $500.00 |
| 22 | Aggregate for cover material (PC) (402-02) | TON | 2 | $5.00 | $5.99 | $5.00 |
| 23 | Bituminous material for tack coat (TC) (403-01) | TON | 7 | $500.00 | $598.51 | $500.00 |
| 24 | Saw cutting asphalt pavement (407-20.05) | LF | 747 | $12.10 | $30.96 | $30.00 |
| 25 | Acs mix(PG64-22) grading D (411-01.10) | TON | 625 | $190.00 | $227.43 | $190.00 |
| 26 | Cold planing bituminous pavement (415-01.01) | TON | 848 | $43.88 | $106.07 | $57.18 |
| 27 | Retaining wall (R1, S.R. 211 sta. 514+40.32 - sta. 514+92.35) (604-07.01) | SF | 231 | $222.11 | $325.95 | $300.00 |
| 28 | 18" pipe culvert (607-03.30) | LF | 346 | $120.28 | $177.07 | $90.00 |
| 29 | Class A concrete (pipe endwalls) (611-07.01) | CY | 7 | $1,961.18 | $3,572.62 | $2,000.00 |
| 30 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 315 | $3.83 | $12.15 | $3.00 |
| 31 | Catch basins, type 10, > 4' - 8' depth (611-10.02) | EACH | 4 | $8,469.84 | $5,614.67 | $7,000.00 |
| 32 | Catch basin, 48IN round,> 4FT-8FT depth (611-60.01) | EACH | 4 | $7,045.97 | $6,007.67 | $8,500.00 |
| 33 | Manhole structure, 48IN round,> 4FT-8FT depth (611-62.01) | EACH | 2 | $5,407.67 | $6,655.36 | $9,000.00 |
| 34 | Manhole structure, 48IN round,> 8FT-12FT depth (611-62.02) | EACH | 1 | $9,986.87 | $7,473.63 | $10,000 |
| 35 | Manhole structure, 48IN round,> 12FT-16FT depth (611-62.03) | EACH | 1 | $11,040 | $8,819.46 | $12,000 |
| 36 | Concrete parapet with structural tubing (620-05) | LF | 52 | $350.00 | $359.10 | $400.00 |
| 37 | 18" temporary drainage pipe (621-03.02) | LF | 57 | $74.27 | $180.88 | $50.00 |
| 38 | Temporary shoring (grading work) (621-05.10) | LS | 1 | $1.00 | $30,973 | $10,000 |
| 39 | Concrete sidewalk (4 ") (701-01.01) | SF | 3,624 | $12.06 | $9.28 | $8.50 |
| 40 | Concrete curb (702-01) | CY | 3 | $1,466.38 | $1,425.07 | $900.00 |
| 41 | Concrete combined curb & gutter (702-03) | CY | 42 | $1,216.57 | $1,090.13 | $850.00 |
| 42 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 375 | $33.50 | $41.90 | $33.50 |
| 43 | GR terminaltrailing end (type 13) MASH TL-3 (705-06.10) | EACH | 1 | $1,250.00 | $2,663.35 | $1,250.00 |
| 44 | Short-radius guardrail system (24FT radius) MASH TL-3 (705-06.16) | EACH | 1 | $16,000 | $23,940 | $16,000 |
| 45 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 5 | $3,200.00 | $4,189.54 | $3,200.00 |
| 46 | Thrie beam bridge transition MASH TL-3 (705-06.25) | EACH | 7 | $2,650.00 | $3,591.04 | $2,650.00 |
| 47 | GR terminal (energy absorbing) MASH TL-2 (705-06.30) | EACH | 1 | $3,000.00 | $3,890.29 | $3,000.00 |
| 48 | High-visibility construction fence (707-08.11) | LF | 7,544 | $2.50 | $7.13 | $2.75 |
| 49 | Machined rip-rap (class A-3) (709-05.05) | TON | 200 | $58.56 | $72.31 | $70.00 |
| 50 | Machined rip-rap (class A-1) (709-05.06) | TON | 25 | $61.18 | $90.75 | $65.00 |
| 51 | Machined rip-rap (class B) (709-05.08) | TON | 2,188 | $59.98 | $72.11 | $60.00 |
| 52 | Traffic control (712-01) | LS | 1 | $31,072 | $18,554 | $25,850 |
| 53 | Flexible drums (channelizing) (712-04.01) | EACH | 40 | $38.00 | $53.87 | $45.00 |
| 54 | Warning lights (type A) (712-05.01) | EACH | 8 | $40.00 | $29.93 | $25.00 |
| 55 | Signs (construction) (712-06) | SF | 591 | $6.50 | $8.74 | $7.30 |
| 56 | Temporary barricades (type II) (712-07.02) | LF | 25 | $21.00 | $29.92 | $25.00 |
| 57 | Temporary barricades (type III) (712-07.03) | LF | 340 | $19.00 | $17.96 | $15.00 |
| 58 | "U" section steel posts (713-11.01) | LB | 373 | $4.50 | $5.39 | $4.50 |
| 59 | U post slip base (713-11.22) | EACH | 4 | $450.00 | $538.66 | $450.00 |
| 60 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 35 | $15.00 | $17.96 | $15.00 |
| 61 | Removal of signs, posts and footings (713-15) | LS | 1 | $250.00 | $299.26 | $250.00 |
| 62 | Changeable message sign unit (713-16.01) | EACH | 8 | $2,500.00 | $6,583.57 | $5,500.00 |
| 63 | Barrier mounted sign support (railroad crossing on parapet) (713-30.09) | EACH | 1 | $3,000.00 | $5,985.06 | $500.00 |
| 64 | Jacked or bored conduit (714-03) | LF | 100 | $39.39 | $80.38 | $39.39 |
| 65 | Direct burial conduit (2" PVC, schedule 40) (714-03.01) | LF | 335 | $16.99 | $17.63 | $16.99 |
| 66 | Pull boxes (type C) (714-05.04) | EACH | 8 | $1,076.96 | $1,284.81 | $1,076.96 |
| 67 | Cable (1/C # 10 AWG) (714-06.03) | LF | 9,630 | $1.13 | $1.76 | $1.13 |
| 68 | Cable (#10 copper soft drawn bare) (714-06.12) | LF | 3,210 | $1.13 | $2.85 | $1.13 |
| 69 | Light standards (14' M.H. post top) (714-08.09) | EACH | 30 | $2,919.30 | $3,709.54 | $2,919.30 |
| 70 | Removal of light standard (714-08.34) | EACH | 14 | $687.50 | $432.70 | $687.50 |
| 71 | LED luminaires (56 watt) (714-09.47) | EACH | 30 | $2,967.53 | $4,632.66 | $2,967.53 |
| 72 | Control center (no. 1) (714-12.01) | LS | 1 | $16,875 | $33,834 | $16,875 |
| 73 | Control center (no. 2) (714-12.02) | LS | 1 | $16,875 | $33,834 | $16,875 |
| 74 | Electrical connection (to control center no. 1) (714-25.01) | LS | 1 | $3,125.00 | $7,275.81 | $3,125.00 |
| 75 | Electrical connection (to control center no. 2) (714-25.02) | LS | 1 | $3,125.00 | $7,275.81 | $3,125.00 |
| 76 | Plastic pavement marking (stop line) (716-02.05) | LF | 41 | $35.00 | $2,394.02 | $35.00 |
| 77 | Plastic word pavement marking (RXR) (716-03.02) | EACH | 1 | $2,000.00 | $2,394.03 | $2,000.00 |
| 78 | Painted pavement marking (RXR) (716-05.10) | EACH | 1 | $1,000.00 | $5,985.06 | $1,000.00 |
| 79 | Contrast pavement marking 6" (716-09.86) | LM | 1.10 | $45,000 | $37,921 | $45,000 |
| 80 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 1.70 | $12,800 | $50,562 | $12,800 |
| 81 | Mobilization (717-01) | LS | 1 | $704,672 | $225,000 | $1,753,400 |
| 82 | Geogrid reinforcement type 2 (740-07.04) | SY | 1,946 | $12.73 | $1.77 | $7.50 |
| 83 | Geotextile (type III)(erosion control) (740-10.03) | SY | 544 | $4.92 | $1.32 | $6.00 |
| 84 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 728 | $5.95 | $2.32 | $6.00 |
| 85 | Temporary sediment tube 18IN (740-11.03) | LF | 44 | $5.00 | $2.39 | $7.50 |
| 86 | Seeding (with mulch) (801-01) | UNIT | 31 | $60.00 | $6.74 | $75.00 |
| 87 | Temporary seeding (with mulch) (801-01.07) | UNIT | 35 | $40.00 | $2.30 | $65.00 |
| 88 | Special wetland seed mixture (801-01.36) | UNIT | 39 | $130.00 | $159.38 | $100.00 |
| 89 | Natve seed MX final stablizatn of slopes (801-01.38) | UNIT | 3 | $300.00 | $38.42 | $100.00 |
| 90 | Water (seeding & sodding) (801-03) | MG | 19.60 | $50.00 | $299.25 | $25.00 |
| 91 | Sodding (new sod) (803-01) | SY | 455 | $4.50 | $2.39 | $5.50 |
| 92 | Turf reinforcement mat (class III) (805-01.03) | SY | 86 | $8.00 | $3.17 | $9.50 |
| 93 | Project mowing (806-02.03) | CYCL | 6 | $6,000.00 | $2,874.40 | $15,000 |
| 94 | Removal of structures (exist. BR. no. 23-SR211-1.31) (202-04.01) | LS | 1 | $358,017 | $450,000 | $500,000 |
| 95 | Removal of structures (exist. BR. no. 23-SR211-1.71) (202-04.02) | LS | 1 | $950,000 | $800,000 | $800,000 |
| 96 | Dry excavation (bridges) (204-02.01) | CY | 840 | $18.32 | $27.72 | $18.00 |
| 97 | Granular backfill (bridges) (303-01.02) | TON | 165 | $76.73 | $53.65 | $100.00 |
| 98 | Epoxy coated reinforcing steel (604-02.03) | LB | 728,662 | $1.74 | $1.92 | $1.76 |
| 99 | Class A concrete (bridges) (604-03.01) | CY | 993 | $1,276.85 | $900.00 | $1,650.00 |
| 100 | Steel bar reinforcement (bridges) (604-03.02) | LB | 124,638 | $1.64 | $1.74 | $1.63 |
| 101 | Pavement @ bridge ends (604-03.04) | SY | 456 | $390.16 | $274.57 | $400.00 |
| 102 | Class A concrete (sidewalks) (604-03.07) | CY | 403 | $672.20 | $482.83 | $800.00 |
| 103 | Class DS concrete (604-03.32) | CY | 1,861 | $1,352.99 | $925.00 | $1,200.00 |
| 104 | Applied texture finish (new structures) (604-04.01) | SY | 7,448 | $15.99 | $59.85 | $13.50 |
| 105 | Bridge deck grooving (mechanical) (604-05.31) | SY | 4,675 | $3.28 | $5.99 | $3.28 |
| 106 | Steel pipe piles (20 in) (606-22.01) | LF | 4,438 | $188.24 | $203.49 | $190.00 |
| 107 | Test piles (steel pipe piles 20 in) (606-22.03) | LF | 357 | $212.94 | $215.46 | $225.00 |
| 108 | Load testing (steel pipe piles 20 in) (606-22.04) | EACH | 4 | $9,360.00 | $5,985.06 | $5,000.00 |
| 109 | Steel pipe piles (24 in) (606-22.13) | LF | 8,772 | $276.69 | $235.81 | $210.00 |
| 110 | Test piles (steel pipe piles 24 in) (606-22.15) | LF | 1,319 | $300.86 | $235.81 | $250.00 |
| 111 | Prestressed concrete wide bulb tee beam (WBT-42) (615-01.30) | LF | 7,822 | $515.00 | $730.55 | $500.00 |
| 112 | Concrete parapet with structural tubing (620-05) | LF | 1,382 | $350.00 | $326.36 | $400.00 |
| 113 | Conc parapet single slope (STD-1-1SS) (620-05.01) | LF | 1,382 | $130.00 | $113.72 | $130.00 |
| 114 | 6" perforated pipe with vertical drain system (710-09.01) | LF | 258 | $26.40 | $131.17 | $70.00 |
| 115 | 6" pipe underdrain (710-09.02) | LF | 52 | $22.58 | $68.85 | $15.00 |
| 116 | Structural lighting (bridge no. 1) (714-01.01) | LS | 1 | $16,663 | $23,940 | $16,663 |
| 117 | Structural lighting (bridge no. 2) (714-01.02) | LS | 1 | $18,939 | $23,940 | $18,939 |
| 118 | Pda testing (930-01.01) | EACH | 11 | $5,523.58 | $598.51 | $9,325.00 |
| 119 | Pda RE-strike (930-01.02) | EACH | 11 | $2,717.64 | $598.51 | $2,700.00 |
| 120 | Pole 35FT class 5 wood (793-01.08) | EACH | 1 | $2,500.00 | $5,985.06 | $2,500.00 |
| 121 | Anchor 1IN (793-01.41) | EACH | 2 | $1,875.00 | $3,449.29 | $1,875.00 |
| 122 | Remove poles all sizes (793-98.04) | EACH | 1 | $1,000.00 | $3,449.27 | $1,000.00 |
| 123 | Remove pedestals (793-98.06) | EACH | 3 | $312.50 | $1,149.76 | $312.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of June 26, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.