Louis-Company, LLC: TDOT bid record

Louis-Company, LLC submitted 10 bids on Tennessee DOT contracts in the data, from 16 AUG 2024 to 02 OCT 2026, and was the low bidder on 1 of them (10%). When it was not low, its total sat a median +29% above the low bid.

Owner
Tennessee DOT
Low bid volume
$1,498,823
Latest bid
02 OCT 2026
Data through
02 OCT 2026
10Bids
1Low bids
10Win rate, percent
+29%Median gap to the low bid when not low, 9 bids

By year

YearBidsLow bidsWin rate
2024200%
2025100%
20267114%
Louis-Company, LLC, TDOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
Meigs And Rhea Counties100%
Hamilton County100%
Greene County100%
Knox County100%
Dyer County100%
Hardin County11100%
Roane County100%
Meigs County100%
Polk County100%
Humphreys County100%
Louis-Company, LLC, TDOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Type 1 thin epoxy overlay (epoxy-urethane)617-04.01SY62 (33%)$46.63$42.00
Concrete repairs604-10.54SF62 (33%)$357.68$400.00
Flexible drums (channelizing)712-04.01EACH71 (14%)$50.55$34.50
Temporary silt fence (with backing)209-08.02LF71 (14%)$7.23$6.00
Bridge deck repairs (partial depth of slab)604-10.50SY61 (17%)$659.85$685.00
Water (seeding & sodding)801-03MG51 (20%)$250.00$100.00
Louis-Company, LLC, TDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Mid-State Construction Company, Inc.64 of 6
Southern Constructors, Inc.54 of 5
Jones Bros. Contractors, LLC42 of 4
Southern Road & Bridge, LLC40 of 4
Bell & Associates Construction, LLC31 of 3
Jamison Construction, LLC31 of 3
RAM Construction Services of Michigan Inc.31 of 3
Dement Construction Group, LLC31 of 3
The Truesdell Corporation22 of 2
Dement Construction Company, LLC10 of 1
Louis-Company, LLC, TDOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
02 OCT 2026CN263065Humphreys CountyThe construction of a concrete bulb-tee beam bridge on cedar grove road over hurricane creek (l.m. 0.49), including grading, drainage, and p4 of 6$4,887,633+14%
14 AUG 2026CN262060Meigs CountyThe repair of the bridge on s.r. 60 over the tennessee river (l.m. 3.10)3 of 5$8,582,807+29%
14 AUG 2026CN262055Polk CountyThe miscellaneous safety improvements including high friction surface treatment (hfst) on s.r. 68 from the monroe county line (l.m. 0.00) to4 of 7$439,412+24%
26 JUN 2026CN264049Dyer CountyThe construction of a concrete bulb-tee beam bridges on s.r. 211 over overflow (l.m. 1.31) and over the north fork forked deer river (l.m. 12 of 3$19,486,217+4.0%
26 JUN 2026CN264044Hardin CountyThe repair of the bridge on u.s. 641 (s.r. 114) over the tennessee river (l.m. 3.22)1 of 8$1,498,823Low, 6.0% under the second
26 JUN 2026CN261902Roane CountyThe repair of the bridge on pansy hill drive over the emory river (l.m. 0.28) in harriman4 of 4$3,874,033+166%
08 MAY 2026CN261039Knox CountyThe repair of the bridge on i-40/s.r. 158 (james white parkway) over norfolk southern railroad, willow avenue, and jackson avenue (l.m. 19.34 of 5$2,929,872+62%
27 JUN 2025CNZ191Greene CountyThe repair of the bridges on u.s. 11e (s.r. 34) over snapps ferry road and nfs railway (l.m. 17.25)2 of 5$1,636,497+7.0%
18 DEC 2024CNY316Hamilton CountyThe repair of bridges on i-24 over missionary ridge ravine (l.m. 11.07 and l.m. 11.13)3 of 6$11,447,415+70%
16 AUG 2024CNY201Meigs And Rhea CountiesThe repair of the bridge on s.r. 30 over the tennessee river (l.m. 17.28)4 of 5$4,968,859+43%
Louis-Company, LLC: latest TDOT bids in the data

How this record was read

TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

  • Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.