TDOT contract CN261902 bid tabulation
The repair of the bridge on pansy hill drive over the emory river (l.m. 0.28) in harriman. Let by Tennessee DOT on June 26, 2026, Roane County. 4 bids received; low bid $1,455,708 by Mid-State Construction Company, Inc..
- Owner
- Tennessee DOT
- Letting
- 26 JUN 2026
- Pay items
- 42
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Mid-State Construction Company, Inc. | $1,455,708 | Low |
| 2 | Southern Constructors, Inc. | $1,497,016 | +3.0% |
| 3 | Jones Bros. Contractors, LLC | $1,970,310 | +35% |
| 4 | Louis-Company, LLC | $3,874,033 | +166% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Mid-State Construction Company, Inc. | 2. Southern Constructors, Inc. | 3. Jones Bros. Contractors, LLC | 4. Louis-Company, LLC |
|---|---|---|---|---|---|---|---|
| 1 | Vegetation removal (201-05.31) | LS | 1 | $26,532 | $15,000 | $30,000 | $45,231 |
| 2 | Temporary silt fence (with backing) (209-08.02) | LF | 300 | $9.24 | $15.00 | $8.00 | $21.67 |
| 3 | Bituminous material for tack coat (TC) (403-01) | TON | 0.20 | $1,620.00 | $1,700.00 | $1,500.00 | $2,166.55 |
| 4 | Acs mix(PG64-22) grading D (411-01.10) | TON | 16 | $864.00 | $1,250.00 | $800.00 | $1,155.49 |
| 5 | Cold planing bituminous pavement (415-01.02) | SY | 240 | $70.20 | $100.00 | $65.00 | $93.88 |
| 6 | Bearing device (repair) (602-10.12) | LS | 1 | $12,737 | $20,000 | $30,000 | $23,870 |
| 7 | Repainting existing steel structures (BR. no. 73-1226-0.28) (603-02.01) | LS | 1 | $108,000 | $140,000 | $128,000 | $497,963 |
| 8 | Containment & disposal of waste(BR. no. 73-1226-0.28) (603-05.20) | LS | 1 | $32,400 | $45,000 | $32,000 | $14,444 |
| 9 | Applied texture finish (existing structures) (604-04.02) | SY | 5,460 | $19.44 | $16.00 | $15.00 | $57.77 |
| 10 | Concrete (604-10.05) | SF | 197 | $458.59 | $400.00 | $480.00 | $892.54 |
| 11 | Non-penetrating concrete seal (604-10.17) | SY | 514 | $21.60 | $25.00 | $25.00 | $51.16 |
| 12 | Bridge deck repairs (full depth of slab) (604-10.30) | SY | 10 | $997.22 | $1,350.00 | $600.00 | $8,073.92 |
| 13 | Expansion joint repairs (type A) (604-10.32) | LF | 43 | $1,648.80 | $1,800.00 | $2,500.00 | $2,416.11 |
| 14 | Concrete repairs (604-10.42) | CF | 3 | $1,353.04 | $2,000.00 | $3,500.00 | $28,622 |
| 15 | Expansion joint repairs (type G) (604-10.46) | LF | 45 | $1,413.52 | $1,500.00 | $2,500.00 | $2,395.02 |
| 16 | Bridge deck repairs (partial depth of slab) (604-10.50) | SY | 25 | $472.39 | $600.00 | $500.00 | $1,107.30 |
| 17 | Concrete repairs (604-10.54) | SF | 196 | $458.45 | $400.00 | $480.00 | $1,108.81 |
| 18 | Concrete (foundation repairs) (604-10.55) | CY | 4 | $10,950 | $12,000 | $60,000 | $178,956 |
| 19 | Concrete repairs (cracks) (604-10.63) | LF | 26 | $216.00 | $300.00 | $180.00 | $1,463.12 |
| 20 | Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01) | SY | 3,360 | $38.77 | $40.00 | $35.50 | $48.26 |
| 21 | Guardrail at bridge ends (705-01.01) | LF | 27 | $118.80 | $115.00 | $92.80 | $134.04 |
| 22 | Guardrail transition 27IN to 31IN (705-02.10) | EACH | 1 | $162.00 | $110.00 | $100.00 | $144.44 |
| 23 | Earth pad for guard rail end treatment (705-04.10) | EACH | 2 | $1,080.00 | $810.00 | $800.00 | $1,155.49 |
| 24 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 69 | $34.56 | $40.00 | $35.00 | $50.55 |
| 25 | GR terminal (energy absorbing) MASH TL-2 (705-06.30) | EACH | 2 | $3,348.00 | $3,500.00 | $3,250.00 | $4,694.18 |
| 26 | Guardrail removed (706-01) | LF | 154 | $1.08 | $1.50 | $1.10 | $1.59 |
| 27 | Sacked sand cement riprap (709-02.02) | CY | 29 | $6,716.88 | $3,000.00 | $12,000 | $15,632 |
| 28 | Traffic control (712-01) | LS | 1 | $82,786 | $75,000 | $30,000 | $16,394 |
| 29 | Flagman (712-01.05) | HR | 224 | $39.76 | $60.00 | $80.00 | $279.85 |
| 30 | Portable barrier rail, reduced deflection (MASH TL-3) (712-02.12) | LF | 940 | $38.63 | $85.00 | $80.00 | $83.77 |
| 31 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 2 | $7,560.00 | $8,500.00 | $7,000.00 | $20,221 |
| 32 | Flexible drums (channelizing) (712-04.01) | EACH | 44 | $43.20 | $50.00 | $40.00 | $50.55 |
| 33 | Barrier rail delineator (712-04.50) | EACH | 47 | $9.72 | $40.00 | $9.00 | $10.90 |
| 34 | Signs (construction) (712-06) | SF | 628 | $8.37 | $15.00 | $7.75 | $7.94 |
| 35 | Removable pavement marking (8" barrier line) (712-09.02) | LF | 3,600 | $5.40 | $4.00 | $4.75 | $7.22 |
| 36 | Removable pavement marking (stop line) (712-09.04) | LF | 48 | $27.00 | $30.00 | $25.00 | $36.11 |
| 37 | Removable pavement marking (6" line) (712-09.08) | LF | 6,000 | $3.51 | $4.00 | $3.25 | $4.69 |
| 38 | Changeable message sign unit (713-16.01) | EACH | 3 | $6,372.00 | $9,000.00 | $5,900.00 | $6,355.20 |
| 39 | Spray thermo PVMT MRKNG (60 mil) (6IN line) (716-13.02) | LM | 1 | $8,100.00 | $9,000.00 | $7,500.00 | $10,833 |
| 40 | Mobilization (717-01) | LS | 1 | $94,441 | $149,000 | $200,000 | $323,784 |
| 41 | Temporary traffic signal system (730-40.02) | LS | 1 | $75,181 | $75,000 | $50,000 | $77,996 |
| 42 | Geotextile - type V (railroad protection) (740-10.05) | SY | 44 | $133.17 | $15.00 | $100.00 | $492.40 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of June 26, 2026. Compiled by Mirage Metrics.