TDOT contract CNZ191 bid tabulation
The repair of the bridges on u.s. 11e (s.r. 34) over snapps ferry road and nfs railway (l.m. 17.25). Let by Tennessee DOT on June 27, 2025, Greene County. 5 bids received; low bid $1,525,025 by King General Contractors, Inc..
- Owner
- Tennessee DOT
- Letting
- 27 JUN 2025
- Pay items
- 37
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | King General Contractors, Inc. | $1,525,025 | Low |
| 2 | Louis-Company, LLC | $1,636,497 | +7.0% |
| 3 | Southern Constructors, Inc. | $1,765,796 | +16% |
| 4 | Summers-Taylor, Inc. | $1,795,498 | +18% |
| 5 | Jamison Construction, LLC | $1,944,845 | +28% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. King General Contractors, Inc. | 2. Louis-Company, LLC | 3. Southern Constructors, Inc. | 4. Summers-Taylor, Inc. | 5. Jamison Construction, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201-01) | LS | 1 | $15,080 | $17,382 | $40,000 | $18,052 | $46,500 |
| 2 | Water (203-06) | MG | 0.32 | $2,741.76 | $27,160 | $300.00 | $960.94 | $500.00 |
| 3 | Temporary silt fence (with backing) (209-08.02) | LF | 150 | $8.23 | $11.34 | $12.00 | $9.02 | $7.00 |
| 4 | Acs mix(PG70-22) grading D (411-02.10) | TON | 65 | $548.35 | $850.76 | $450.00 | $905.00 | $430.00 |
| 5 | Cold planing bituminous pavement (415-01.02) | SY | 977 | $47.98 | $42.54 | $30.00 | $46.66 | $30.00 |
| 6 | Applied texture finish (existing structures) (604-04.02) | SY | 2,110 | $30.16 | $34.03 | $22.00 | $19.50 | $22.00 |
| 7 | Concrete (604-10.05) | SF | 502 | $308.45 | $370.04 | $450.00 | $658.07 | $410.00 |
| 8 | Bridge deck repairs (full depth of slab) (604-10.30) | SY | 10 | $1,782.14 | $1,746.87 | $1,500.00 | $1,997.70 | $1,250.00 |
| 9 | Concrete overlayed bridge deck repair (full depth) (604-10.34) | SY | 300 | $719.71 | $1,112.72 | $1,900.00 | $1,413.54 | $2,210.00 |
| 10 | Expansion joint repairs (604-10.44) | LF | 82 | $411.26 | $719.64 | $650.00 | $812.72 | $665.00 |
| 11 | Bridge deck repairs (partial depth of slab) (604-10.50) | SY | 10 | $1,028.16 | $716.05 | $500.00 | $1,661.83 | $500.00 |
| 12 | Concrete repairs (604-10.54) | SF | 109 | $479.81 | $375.32 | $450.00 | $699.68 | $410.00 |
| 13 | Concrete (foundation repairs) (604-10.55) | CY | 5 | $3,015.94 | $1,074.89 | $2,500.00 | $5,635.40 | $2,600.00 |
| 14 | Concrete overlayed bridge deck repair (partial depth) (604-10.56) | SY | 40 | $548.35 | $596.21 | $600.00 | $1,165.00 | $900.00 |
| 15 | Epoxy injection (injection) (604-10.58) | GAL | 5 | $274.18 | $229.70 | $250.00 | $318.43 | $200.00 |
| 16 | Epoxy injection repair (complete and in place) (604-10.62) | LF | 103 | $102.82 | $214.95 | $260.00 | $212.29 | $250.00 |
| 17 | Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01) | SY | 1,604 | $82.25 | $52.15 | $65.00 | $57.37 | $62.50 |
| 18 | GR terminaltrailing end (type 13) MASH TL-3 (705-06.10) | EACH | 2 | $2,741.76 | $2,552.28 | $2,200.00 | $1,939.67 | $2,225.00 |
| 19 | Chain-link fence (bridges) (707-07.01) | SF | 2,230 | $43.87 | $42.54 | $35.00 | $28.37 | $36.00 |
| 20 | High-visibility construction fence (707-08.11) | LF | 150 | $9.60 | $7.44 | $10.00 | $5.31 | $7.00 |
| 21 | Machined rip-rap (class A-1) (709-05.06) | TON | 387 | $100.07 | $114.19 | $120.00 | $141.63 | $75.00 |
| 22 | Traffic control (712-01) | LS | 1 | $75,398 | $38,568 | $60,000 | $52,063 | $105,000 |
| 23 | Interconnected portable barrier rail (712-02.02) | LF | 950 | $182.33 | $82.24 | $50.00 | $122.18 | $60.00 |
| 24 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 2 | $10,967 | $19,142 | $9,000.00 | $16,810 | $8,800.00 |
| 25 | Flexible drums (channelizing) (712-04.01) | EACH | 130 | $54.84 | $53.17 | $45.00 | $41.65 | $42.00 |
| 26 | Barrier rail delineator (712-04.50) | EACH | 48 | $34.27 | $26.23 | $35.00 | $15.09 | $20.00 |
| 27 | Signs (construction) (712-06) | SF | 2,044 | $13.71 | $10.99 | $15.00 | $8.61 | $12.00 |
| 28 | Temporary barricades (type III) (712-07.03) | LF | 30 | $20.56 | $19.85 | $16.00 | $15.55 | $24.00 |
| 29 | Arrow board (type C) (712-08.03) | EACH | 2 | $1,919.23 | $1,985.11 | $3,000.00 | $1,554.94 | $1,600.00 |
| 30 | Removable pavement marking (8" barrier line) (712-09.02) | LF | 13,220 | $5.14 | $5.32 | $3.50 | $3.98 | $4.50 |
| 31 | Removable black-out tape (8IN) (712-09.31) | LF | 8,000 | $5.48 | $5.32 | $3.50 | $3.98 | $4.90 |
| 32 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 0.30 | $17,821 | $10,635 | $12,000 | $7,960.73 | $14,000 |
| 33 | Mobilization (717-01) | LS | 1 | $109,670 | $189,262 | $140,000 | $60,000 | $190,500 |
| 34 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 535 | $13.71 | $19.81 | $12.00 | $8.44 | $8.00 |
| 35 | Temporary sediment tube 20IN (740-11.04) | LF | 300 | $13.71 | $12.69 | $9.00 | $5.04 | $8.00 |
| 36 | Seeding (without mulch) (801-02) | UNIT | 3.20 | $205.63 | $957.10 | $800.00 | $74.30 | $140.00 |
| 37 | Erosion control blanket (type I) (805-12.01) | SY | 354 | $4.80 | $4.25 | $5.00 | $3.18 | $6.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of June 27, 2025. Compiled by Mirage Metrics.