TDOT contract CN261039 bid tabulation

The repair of the bridge on i-40/s.r. 158 (james white parkway) over norfolk southern railroad, willow avenue, and jackson avenue (l.m. 19.30). Let by Tennessee DOT on May 8, 2026, Knox County. 5 bids received; low bid $1,808,808 by The Truesdell Corporation.

Owner
Tennessee DOT
Letting
08 MAY 2026
Pay items
32
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1The Truesdell Corporation$1,808,808Low
2RAM Construction Services of Michigan Inc.$1,993,644+10%
3Southern Constructors, Inc.$2,335,420+29%
4Louis-Company, LLC$2,929,872+62%
5Mid-State Construction Company, Inc.$2,998,454+66%
TDOT contract CN261039: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. The Truesdell Corporation2. RAM Construction Services of Michigan Inc.3. Southern Constructors, Inc.4. Louis-Company, LLC5. Mid-State Construction Company, Inc.
1Applied texture finish (existing structures) (604-04.02)SY3,265$16.00$16.00$20.00$22.08$30.85
2Concrete (604-10.05)SF71$215.00$764.13$550.00$693.58$580.21
3Concrete repairs (604-10.42)CF3$750.00$5,793.76$3,000.00$913.61$11,099
4Expansion joint repairs (604-10.44)LF402$650.00$209.19$425.00$331.89$386.43
5Bridge deck repairs (partial depth of slab) (604-10.50)SY10$799.00$2,507.69$1,500.00$561.78$1,427.68
6Concrete repairs (604-10.54)SF71$215.00$822.62$550.00$561.52$580.01
7Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01)SY18,841$35.00$43.53$39.00$61.23$55.52
8Chain-link fence (bridges) (707-07.01)SF1,845$39.00$29.00$40.00$40.02$59.73
9Traffic control (712-01)LS1$150,000$306,000$425,000$241,512$442,699
10Flexible drums (channelizing) (712-04.01)EACH489$31.00$30.00$55.00$41.40$57.85
11Warning lights (type A) (712-05.01)EACH24$11.00$10.00$50.00$13.80$19.28
12Signs (construction) (712-06)SF1,780$16.00$15.00$20.00$20.70$28.92
13Temporary barricades (type III) (712-07.03)LF234$15.00$14.00$50.00$19.32$27.00
14Arrow board (type C) (712-08.03)EACH2$850.00$800.00$5,000.00$1,104.06$1,542.64
15Queue protection truck (712-08.11)HR1,800$115.00$70.00$135.00$158.71$221.75
16Removable pavement marking (8" barrier line) (712-09.02)LF12,682$5.50$4.75$5.00$7.25$9.16
17Removable black-out tape (8IN) (712-09.31)LF4,836$5.50$5.00$5.50$7.25$9.64
18Changeable message sign unit (713-16.01)EACH6$3,100.00$3,000.00$15,000$4,140.21$5,784.90
19Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23)EACH107$80.00$50.00$60.00$103.51$96.42
20Plastic pavement marking (turn lane arrow) (716-02.06)EACH3$300.00$300.00$350.00$345.02$578.49
21Plastic pavement marking (24" barrier line) (716-02.07)LF93$16.00$8.00$10.00$20.70$15.43
22Plastic word pavement marking (only) (716-03.01)EACH6$350.00$250.00$300.00$448.52$482.08
23Plastic word pavement marking (west) (716-03.09)EACH2$550.00$500.00$550.00$690.04$964.15
24Plastic word pavement marking (east) (716-03.10)EACH2$550.00$500.00$550.00$690.04$964.15
25Plastic word pavement marking (north) (716-03.11)EACH2$550.00$600.00$650.00$690.04$1,156.98
26Plastic pavement marking (straight-turn arrow) (716-04.01)EACH4$350.00$450.00$500.00$448.53$867.74
27Plastic pavement marking (exit only arrow) (716-04.07)EACH2$500.00$450.00$500.00$586.53$867.74
28Preformed plastic pavement marking (interstate shield) (716-10.50)EACH6$2,600.00$2,500.00$2,750.00$3,450.18$4,820.75
29Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM1.30$13,000$12,000$12,500$17,251$23,140
30Enhanced flat line thermo (8IN line) (716-12.06)LF378$3.00$3.00$4.00$3.80$5.78
31Enhanced flat line thermo (12IN line) (716-12.09)LF701$8.00$5.00$6.00$10.35$9.64
32Mobilization (717-01)LS1$144,056$198,000$200,000$580,578$231,500
TDOT contract CN261039: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of May 8, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy