Dement Construction Company, LLC: TDOT bid record
Dement Construction Company, LLC submitted 36 bids on Tennessee DOT contracts in the data, from 09 FEB 2018 to 18 DEC 2024, and was the low bidder on 10 of them (28%). When it was not low, its total sat a median +31% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $217,879,398
- Latest bid
- 18 DEC 2024
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 6 | 2 | 33% |
| 2019 | 1 | 0 | 0% |
| 2020 | 5 | 1 | 20% |
| 2023 | 2 | 0 | 0% |
| 2024 | 22 | 7 | 32% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Franklin County | 3 | 2 | 67% |
| Chester County | 3 | 1 | 33% |
| Williamson | 3 | 0 | 0% |
| Shelby | 3 | 0 | 0% |
| Hamilton County | 2 | 0 | 0% |
| Davidson County | 2 | 0 | 0% |
| Humphreys County | 2 | 0 | 0% |
| Shelby County | 2 | 1 | 50% |
| Perry County | 2 | 1 | 50% |
| Fayette County | 1 | 1 | 100% |
| Dickson County | 1 | 0 | 0% |
| Maury County | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Signs (construction) | 712-06 | SF | 35 | 26 (74%) | $7.50 | $8.00 |
| Flexible drums (channelizing) | 712-04.01 | EACH | 32 | 25 (78%) | $34.00 | $34.50 |
| Enhanced flatline thermo PVMT MRKNG (6IN line) | 716-12.02 | LM | 26 | 21 (81%) | $11,000 | $7,425.00 |
| Bituminous material for tack coat (TC) | 403-01 | TON | 27 | 19 (70%) | $1,100.00 | $969.62 |
| Changeable message sign unit | 713-16.01 | EACH | 25 | 18 (72%) | $6,750.00 | $6,095.00 |
| Acs mix(PG64-22) grading D | 411-01.10 | TON | 21 | 16 (76%) | $245.00 | $171.29 |
| Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 | 307-01.08 | TON | 20 | 15 (75%) | $224.50 | $163.00 |
| Barrier rail delineator | 712-04.50 | EACH | 19 | 15 (79%) | $12.00 | $14.95 |
| Warning lights (type A) | 712-05.01 | EACH | 19 | 14 (74%) | $30.00 | $24.00 |
| Temporary silt fence (with backing) | 209-08.02 | LF | 27 | 13 (48%) | $5.00 | $6.00 |
| Applied texture finish (new structures) | 604-04.01 | SY | 16 | 13 (81%) | $10.95 | $15.99 |
| Temporary barricades (type III) | 712-07.03 | LF | 21 | 12 (57%) | $15.80 | $20.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Jones Bros. Contractors, LLC | 16 | 9 of 16 |
| Bell & Associates Construction, LLC | 15 | 8 of 15 |
| Mid-State Construction Company, Inc. | 8 | 4 of 8 |
| Thomson & Thomson, Inc. | 6 | 5 of 6 |
| Ford Construction Company | 5 | 2 of 5 |
| Bell & Associates Construction, L.P. | 5 | 2 of 5 |
| Kiewit Infrastructure South Co. | 4 | 2 of 4 |
| Civil Constructors, LLC | 3 | 2 of 3 |
| Volunteer Bridge Construction, Inc. | 2 | 1 of 2 |
| Vulcan Construction Materials, LLC | 2 | 2 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 DEC 2024 | CNY316 | Hamilton County | The repair of bridges on i-24 over missionary ridge ravine (l.m. 11.07 and l.m. 11.13) | 6 of 6 | $14,134,914 | +110% |
| 06 DEC 2024 | CNY906 | Humphreys County | The construction of a welded steel plate girder bridge on bakerville road over the duck river (l.m. 15.71), including grading, drainage, and | 3 of 3 | $20,424,147 | +14% |
| 04 OCT 2024 | CNY188 | Chester County | The construction of a concrete bulb-tee beam bridge on s.r. 100 over the south fork forked deer river (l.m. 14.16), and a concrete i-beam br | 1 of 3 | $15,348,359 | Low, 4.0% under the second |
| 04 OCT 2024 | CNY233 | Chester County | The construction of bridges on talley store road over jacks creek (l.m. 2.51, l.m. 2.59, and l.m. 2.64), including grading, drainage, and pa | 3 of 3 | $5,599,331 | +8.0% |
| 04 OCT 2024 | CNY251 | Coffee County | The construction of a steel bridge on campground lane over the duck river in old stone fort state park, including grading, drainage, relocat | 1 of 4 | $5,865,386 | Low, 36% under the second |
| 04 OCT 2024 | CNY224 | Franklin County | The construction of a concrete i-beam bridge on crownover road over crow creek (l.m. 0.19), including grading, drainage, and paving | 1 of 1 | $2,876,687 | Low |
| 04 OCT 2024 | CNY229 | Perry County | The construction of a concrete bulb-tee beam bridge on south mill street over the buffalo river (l.m. 0.22) in linden, including grading, dr | 1 of 3 | $8,851,389 | Low, 36% under the second |
| 16 AUG 2024 | CNY191 | Chester County | The repair of bridges on u.s. 45 (s.r. 5) over overflow (l.m. 8.38), turkey creek (l.m. 8.50), and dry creek (l.m. 9.36) | 3 of 4 | $2,024,994 | +43% |
| 16 AUG 2024 | CNY202 | Davidson County | The repair of the bridge on i-40 over the harpeth river (l.m. 3.23), including grading, drainage, and paving | 4 of 4 | $23,682,691 | +75% |
| 16 AUG 2024 | CNY167 | Dickson County | The repair of bridges on i-40 over east piney road (l.m. 5.13) | 2 of 3 | $1,179,841 | +88% |
| 16 AUG 2024 | CNY200 | Maury County | The repair of the bridges on u.s. 43 (s.r. 6) over the duck river (l.m. 22.24) | 2 of 3 | $2,326,819 | +66% |
| 16 AUG 2024 | CNY193 | Perry County | The repair of the bridge on u.s. 412 (s.r. 20) over the buffalo river and short creek (l.m. 12.61) | 2 of 3 | $1,650,622 | +27% |
| 16 AUG 2024 | CNY001 | Rutherford County | The repair of the bridges on s.r. 102 over u.s. 70 (s.r. 1) and the csxt railroad (l.m. 10.34) | 2 of 3 | $2,094,798 | +18% |
| 16 AUG 2024 | CNY195 | Shelby County | The repair of the bridge on s.r. 14 over the csx railroad (l.m. 18.27), and on monroe avenue over u.s. 51 (s.r. 1, danny thomas boulevard) ( | 3 of 3 | $2,331,690 | +75% |
| 16 AUG 2024 | CNY196 | Warren County | The repair of the bridges on u.s. 70s (s.r. 1) over s.r. 55 (l.m. 10.53) | 3 of 3 | $3,278,171 | +69% |
| 21 JUN 2024 | CNY097 | Franklin County | The repair of the bridges on u.s. 64 (s.r. 50) over old alto highway (l.m. 16.93) | 4 of 4 | $1,906,547 | +53% |
| 10 MAY 2024 | CNY159 | Fayette County | The construction of a concrete box beam bridge on s.r. 222 over little laurel creek (l.m. 3.66), including grading, drainage, and paving | 1 of 3 | $1,982,293 | Low, 5.0% under the second |
| 10 MAY 2024 | CNY146 | Shelby County | The grading, drainage, construction of bridges and retaining walls, signals, and paving on u.s. 78 (s.r. 4, lamar avenue) from south of shel | 1 of 2 | $149,823,833 | Low, 13% under the second |
| 09 FEB 2024 | CNY900 | Hamilton County | The landscaping on i-124 (u.s. 27, s.r. 29) from the i-24/i-124 interchange (l.m. 1.15) to south of the tennessee river (olgiati) bridge (l. | 2 of 2 | $4,809,688 | +58% |
| 09 FEB 2024 | CNY037 | Davidson County | The repair of the bridge on s.r. 100 over the harpeth river (l.m. 7.36) | 3 of 3 | $2,299,774 | +22% |
| 09 FEB 2024 | CNY068 | Franklin County | The construction of a concrete i-beam bridge on old decherd road over wagner creek (l.m. 0.25), including grading, drainage, and paving | 1 of 2 | $3,540,341 | Low, 41% under the second |
| 09 FEB 2024 | CNY065 | Humphreys County | The repair of the bridge on s.r. 13 over hurricane creek (l.m. 11.42) | 5 of 6 | $478,813 | +130% |
| 08 DEC 2023 | CNX412 | Coffee | The repair of the bridge on s.r. 55 over the little duck river (l.m. 14.03) | 2 of 3 | $5,897,036 | +34% |
| 08 DEC 2023 | CNX394 | Giles | The repair of the bridge on s.r. 11 over shoal creek (l.m. 6.91) | 2 of 3 | $1,815,279 | +3.0% |
| 26 JUN 2020 | CNU011 | Hamilton | The grading, drainage, bridges, retaining walls and paving on i-24 at the interchanges of u.s. 11 (u.s. 41, u.s. 72, s.r. 2, broad street) a | 3 of 5 | $34,804,026 | +9.0% |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.