Civil Constructors, LLC: TDOT bid record
Civil Constructors, LLC submitted 25 bids on Tennessee DOT contracts in the data, from 09 FEB 2018 to 26 JUN 2026, and was the low bidder on 1 of them (4%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $123,233,326
- Latest bid
- 26 JUN 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 2 | 0 | 0% |
| 2020 | 3 | 0 | 0% |
| 2024 | 10 | 0 | 0% |
| 2025 | 7 | 0 | 0% |
| 2026 | 3 | 1 | 33% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Rutherford County | 7 | 1 | 14% |
| Dickson County | 2 | 0 | 0% |
| Robertson County | 2 | 0 | 0% |
| Sumner County | 2 | 0 | 0% |
| Williamson | 2 | 0 | 0% |
| Davidson County | 1 | 0 | 0% |
| Bedford County | 1 | 0 | 0% |
| Giles County | 1 | 0 | 0% |
| Williamson County | 1 | 0 | 0% |
| Wilson County | 1 | 0 | 0% |
| Dickson And Hickman Counties | 1 | 0 | 0% |
| Maury County | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trainee | 109-10.01 | HR | 10 | 10 (100%) | $0.80 | $0.80 |
| Temporary silt fence (with backing) | 209-08.02 | LF | 19 | 5 (26%) | $5.90 | $6.00 |
| Water | 203-06 | MG | 18 | 5 (28%) | $15.00 | $22.20 |
| Temporary barricades (type III) | 712-07.03 | LF | 16 | 5 (31%) | $19.20 | $20.00 |
| Signs (construction) | 712-06 | SF | 25 | 4 (16%) | $8.80 | $8.00 |
| Water (seeding & sodding) | 801-03 | MG | 25 | 4 (16%) | $115.00 | $100.00 |
| Flexible drums (channelizing) | 712-04.01 | EACH | 23 | 4 (17%) | $37.50 | $34.50 |
| Mineral aggregate (size 57) | 303-10.01 | TON | 22 | 4 (18%) | $67.50 | $65.00 |
| Enhanced rock check dam | 209-08.08 | EACH | 22 | 4 (18%) | $928.00 | $1,000.00 |
| High-visibility construction fence | 707-08.11 | LF | 18 | 4 (22%) | $2.38 | $3.30 |
| Machined rip-rap (class A-1) | 709-05.06 | TON | 17 | 4 (24%) | $64.50 | $70.00 |
| Seeding (with mulch) | 801-01 | UNIT | 15 | 4 (27%) | $58.50 | $84.63 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Jones Bros. Contractors, LLC | 13 | 6 of 13 |
| Rogers Group, Inc. | 9 | 7 of 9 |
| Vulcan Construction Materials, LLC | 8 | 5 of 8 |
| Cleary Construction, Inc. | 8 | 4 of 8 |
| Adams Contracting, LLC | 7 | 0 of 7 |
| Eubank Asphalt Paving & Sealing, LLC | 6 | 5 of 6 |
| Sessions Paving Company | 5 | 3 of 5 |
| Wiregrass Construction Company, Inc | 4 | 0 of 4 |
| Volunteer Paving, LLC | 4 | 4 of 4 |
| Capital City Construction Services, LLC | 4 | 4 of 4 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 26 JUN 2026 | CN263059 | Dickson And Hickman Counties | The grading, drainage, and paving on i-40 from approximately 0.5 miles west and east of the s.r. 48 overpass (l.m. 2.25 in hickman county to | 2 of 3 | $12,720,913 | +7.0% |
| 26 JUN 2026 | CN263052 | Maury County | The grading, drainage, and paving on a s.i.a. route (including u.s. 43/s.r. 6) serving project leeward | 4 of 8 | $3,131,531 | +45% |
| 26 JUN 2026 | CN263057 | Rutherford County | The widening on s.r. 268 from u.s. 41 (u.s. 70s, s.r. 1, nw broad street) (l.m. 0.00) to u.s. 231 (s.r. 10, memorial boulevard) (l.m. 4.39), | 1 of 4 | $123,233,326 | Low, 3.0% under the second |
| 27 JUN 2025 | CNZ193 | Rutherford County | The interchange improvement on i-24 at medical center parkway (l.m. 12.74 - l.m. 13.34), including grading, drainage, paving with portland c | 2 of 4 | $6,821,837 | +3.0% |
| 09 MAY 2025 | CNZ147 | Bedford County | The construction of turn lanes on u.s. 231 (s.r. 10) at the intersection of s.r. 82 (sawney webb memorial highway) (l.m. 17.52), including s | 4 of 6 | $2,413,427 | +29% |
| 09 MAY 2025 | CNZ076 | Giles County | The grading, drainage, and paving on a s.i.a. route serving integrity mold and murco wall products in pulaski | 2 of 3 | $3,198,675 | +14% |
| 09 MAY 2025 | CNZ164 | Williamson County | The construction of pedestrian facilities on s.r. 100 from the fairview community center (l.m. 3.08) to bowie lake road (l.m. 5.19), includi | 3 of 4 | $7,992,414 | +14% |
| 09 MAY 2025 | CNZ153 | Wilson County | The grading, drainage, signals, and paving on u.s. 70 (s.r. 24) from terrace hill road (l.m. 5.90) to adeles garden road (l.m. 6.49) | 2 of 5 | $1,848,358 | +13% |
| 21 MAR 2025 | CNZ101 | Rutherford County | The grading, drainage, signals, and paving on u.s. 41 (s.r. 1) from near jefferson pike (l.m. 3.38) to near s.r. 266 (sam ridley parkway) (l | 3 of 5 | $6,509,521 | +7.0% |
| 07 FEB 2025 | CNZ018 | Davidson County | The miscellaneous safety improvements including signals on hamilton church road from east of u.s. 41 (u.s. 70s, s.r. 1) to west of calumet d | 3 of 3 | $934,441 | +4.0% |
| 06 DEC 2024 | CNY292 | Sumner County | The grading, drainage, signals, and paving on a s.i.a. route serving project woolhawk (facebook data center), including u.s. 31e (s.r. 6) an | 3 of 6 | $3,393,935 | +22% |
| 04 OCT 2024 | CNY232 | Dickson County | The culvert replacement adjacent to s.r. 46 and barbecue road in dickson, including grading, drainage, and paving | 3 of 4 | $3,843,613 | +102% |
| 04 OCT 2024 | CNY216 | Rutherford County | The grading, drainage, and paving on s.r. 96 at the intersection of north thompson lane in murfreesboro (l.m. 9.66 - l.m. 9.79) | 4 of 5 | $679,101 | +48% |
| 04 OCT 2024 | CNY234 | Rutherford County | The grading, drainage, construction of concrete box bridges, signals, and paving on s.r. 99 (new salem highway) from west of veterans parkwa | 5 of 5 | $59,617,241 | +13% |
| 04 OCT 2024 | CNY161 | Sumner County | The grading, drainage, construction of a concrete box bridge, paving, and signals on walton ferry road/old shackle island road from nokes dr | 3 of 4 | $24,852,800 | +20% |
| 21 JUN 2024 | CNY171 | Robertson County | The i-65 weigh station improvements near the kentucky state line (l.m. 15.10 - l.m. 16.01) | 3 of 3 | $31,843,186 | +7.0% |
| 21 JUN 2024 | CNY170 | Rutherford County | The miscellaneous safety improvements on u.s. 231 (s.r. 10) at the intersection of rock springs midland road (l.m. 3.44 to l.m. 3.82), inclu | 3 of 7 | $1,225,550 | +6.0% |
| 21 JUN 2024 | CNY157 | Rutherford County | The i-24 ramp improvements at u.s. 231 (s.r. 10, south church street) (exit 81) in murfreesboro, including grading, drainage, signals, light | 4 of 5 | $8,078,201 | +33% |
| 10 MAY 2024 | CNY142 | Dickson County | The grading, drainage, and paving on a s.i.a. route serving project dv | 3 of 3 | $1,454,697 | +56% |
| 10 MAY 2024 | CNY129 | Robertson County | The grading, drainage, and paving on a s.i.a. route serving project commodore (dorman products) | 5 of 6 | $3,846,468 | +59% |
| 26 JUN 2020 | CNU032 | Williamson | The grading, drainage, construction of bridges, paving and signals on s.r. 96 from east of arno road (l.m. 14.72) to s.r. 252 (wilson pike) | 3 of 6 | $53,628,782 | +8.0% |
| 15 MAY 2020 | CNU029 | Perry | The grading, drainage and paving at 4 locations on s.r. 13 from u.s. 412 (s.r. 20) (l.m. 13.02) to south of the humphreys county line (l.m. | 4 of 4 | $13,184,813 | +15% |
| 15 MAY 2020 | CNU218 | Smith | The emergency slope stabilization on s.r. 80 near l.m. 4.2 | 3 of 6 | $749,814 | +24% |
| 23 MAR 2018 | CNS127 | Rutherford | The grading, drainage, construction of bridges, signals and paving on s.r. 99 from cason lane (l.m. 15.97) to i-24 in murfreesboro (l.m. 18. | 2 of 5 | $28,716,724 | 0.0% |
| 09 FEB 2018 | CNS005 | Williamson | The grading, drainage and paving on u.s. 31a (s.r. 11) at the intersection of s.r. 96 (l.m. 7.40) in triune | 5 of 7 | $2,528,743 | +3.0% |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.