TDOT contract CNZ193 bid tabulation
The interchange improvement on i-24 at medical center parkway (l.m. 12.74 - l.m. 13.34), including grading, drainage, paving with portland cement concrete, retaining wall, its, signals, and lighting. Let by Tennessee DOT on June 27, 2025, Rutherford County. 4 bids received; low bid $6,599,647 by Capital City Construction Services, LLC.
- Owner
- Tennessee DOT
- Letting
- 27 JUN 2025
- Pay items
- 154
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Capital City Construction Services, LLC | $6,599,647 | Low |
| 2 | Civil Constructors, LLC | $6,821,837 | +3.0% |
| 3 | Bell & Associates Construction, LLC | $7,056,523 | +7.0% |
| 4 | MasTec Civil, LLC | $7,215,420 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Capital City Construction Services, LLC | 2. Civil Constructors, LLC | 3. Bell & Associates Construction, LLC | 4. MasTec Civil, LLC |
|---|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $110,000 | $62,730 | $42,895 | $160,000 |
| 2 | Trainee (109-10.01) | HR | 1,180 | $0.80 | $0.80 | $0.80 | $0.80 |
| 3 | Clearing and grubbing (201-01) | LS | 1 | $87,588 | $66,110 | $98,257 | $260,000 |
| 4 | Removal of structures and obstructions (202-01) | LS | 1 | $32,594 | $48,710 | $91,828 | $350,000 |
| 5 | Removal of pipe (24" at sta. 321+08) (202-01.13) | LF | 19 | $214.44 | $115.00 | $156.09 | $90.00 |
| 6 | Removal of rigid pavement, sidewalk, etc. (202-03) | SY | 647 | $45.77 | $35.00 | $60.13 | $20.00 |
| 7 | Road & drainage excavation (unclassified) (203-01) | CY | 3,055 | $36.77 | $72.00 | $56.91 | $17.00 |
| 8 | Borrow excavation (unclassified) (203-03) | CY | 6,571 | $79.07 | $27.00 | $49.68 | $30.00 |
| 9 | Furnishing & spreading topsoil (203-07) | CY | 767 | $45.00 | $77.00 | $67.62 | $43.00 |
| 10 | Sediment removal (209-05) | CY | 35 | $88.40 | $25.00 | $50.85 | $22.00 |
| 11 | Curb inlet protection (type 4) (209-09.43) | EACH | 14 | $140.00 | $155.00 | $303.79 | $312.00 |
| 12 | Catch basin protection (type D) (209-40.33) | EACH | 8 | $165.00 | $756.00 | $320.36 | $315.00 |
| 13 | Catch basin filter assembly(type 6) (209-40.46) | EACH | 4 | $980.00 | $687.00 | $762.23 | $780.00 |
| 14 | Mineral aggregate, type A base, grading D (303-01) | TON | 2,667 | $47.72 | $52.00 | $52.45 | $49.00 |
| 15 | Mineral aggregate (size 57) (303-10.01) | TON | 22 | $44.68 | $55.00 | $74.85 | $87.00 |
| 16 | Treated permeable base (313-03) | SY | 5,651 | $36.12 | $44.00 | $37.28 | $39.00 |
| 17 | Bituminous material for tack coat (TC) (403-01) | TON | 2.60 | $1,925.00 | $1,510.00 | $1,325.62 | $1,300.00 |
| 18 | Acs mix(PG70-22) grading D (411-02.10) | TON | 321 | $256.00 | $221.00 | $193.32 | $200.00 |
| 19 | Cold planing bituminous pavement (415-01.02) | SY | 6,175 | $4.05 | $5.00 | $4.42 | $4.00 |
| 20 | Portland cement concrete pavement (plain) 10" (501-01.03) | SY | 5,111 | $149.89 | $202.00 | $170.64 | $170.00 |
| 21 | Sawing concrete pavement (full depth) (502-04.01) | LF | 2,689 | $6.00 | $25.20 | $3.31 | $4.50 |
| 22 | Load transfer dowels (502-04.02) | EACH | 2,172 | $10.00 | $4.55 | $3.98 | $4.00 |
| 23 | Transverse tie-bars (502-04.03) | EACH | 517 | $10.00 | $45.50 | $39.77 | $39.00 |
| 24 | Grinding concrete pavement (503-01) | SY | 350 | $25.00 | $78.00 | $22.09 | $59.00 |
| 25 | Class A concrete (roadway) (604-01.01) | CY | 15 | $750.00 | $1,760.00 | $1,596.17 | $512.00 |
| 26 | Applied texture finish (new structures) (604-04.01) | SY | 776 | $14.00 | $7.90 | $24.86 | $12.50 |
| 27 | Retaining wall (no. 1) (604-07.01) | SF | 9,541 | $137.50 | $147.00 | $216.82 | $155.00 |
| 28 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 10 | $265.06 | $925.00 | $372.32 | $320.00 |
| 29 | 42" concrete pipe culvert (class III) (607-08.02) | LF | 38 | $371.71 | $897.00 | $639.01 | $360.00 |
| 30 | Class A concrete (pipe endwalls) (611-07.01) | CY | 7 | $1,500.00 | $859.00 | $2,582.09 | $3,000.00 |
| 31 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 154 | $2.50 | $8.90 | $7.94 | $3.20 |
| 32 | 18IN endwall (cross drain) 4:1 (611-07.55) | EACH | 1 | $4,025.29 | $4,170.00 | $4,757.98 | $5,500.00 |
| 33 | Catch basins, type 12, > 4' - 8' depth (611-12.02) | EACH | 3 | $10,078 | $11,320 | $11,969 | $5,500.00 |
| 34 | Conc parapet single slope (STD-1-1SS) (620-05.01) | LF | 821 | $98.00 | $152.00 | $123.03 | $123.00 |
| 35 | Concrete sidewalk (4 ") (701-01.01) | SF | 1,226 | $10.00 | $12.50 | $11.58 | $12.00 |
| 36 | Concrete curb ramp (701-02.03) | SF | 511 | $30.00 | $36.00 | $34.73 | $35.00 |
| 37 | Concrete combined curb & gutter (702-03) | CY | 54 | $650.00 | $812.00 | $752.40 | $707.00 |
| 38 | Guardrail delineation enhancement (705-04.21) | LF | 82 | $3.06 | $3.85 | $3.38 | $8.00 |
| 39 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 245 | $42.79 | $54.00 | $47.27 | $35.00 |
| 40 | Thrie beam bridge transition MASH TL-3 (705-06.25) | EACH | 4 | $2,375.00 | $2,990.00 | $2,623.61 | $3,600.00 |
| 41 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 2 | $1,063.00 | $1,340.00 | $1,174.28 | $1,600.00 |
| 42 | Guardrail removed (706-01) | LF | 587 | $1.00 | $2.20 | $1.10 | $1.00 |
| 43 | Radius rail (706-06.03) | LF | 37 | $49.10 | $62.00 | $54.24 | $36.00 |
| 44 | Chain link fence (6 foot) (707-01.11) | LF | 495 | $20.00 | $39.00 | $35.35 | $23.00 |
| 45 | End & corner post assembly(chain-link fence 6') (707-01.12) | EACH | 3 | $500.00 | $315.00 | $497.11 | $380.00 |
| 46 | Removal of fence (removal of existing R.O.W. fence along tract 7) (707-06.05) | LS | 1 | $5,704.00 | $4,180.00 | $6,296.67 | $5,200.00 |
| 47 | Markers (concrete R.O.W. posts) (708-02.01) | EACH | 3 | $1,185.48 | $1,480.00 | $359.02 | $355.00 |
| 48 | Machined rip-rap (class A-1) (709-05.06) | TON | 663 | $94.86 | $59.50 | $67.43 | $94.00 |
| 49 | Machined rip-rap (class B) (709-05.08) | TON | 327 | $95.51 | $78.00 | $78.27 | $137.00 |
| 50 | Filter cloth underdrain (with pipe) (710-04) | LF | 2,029 | $12.90 | $18.90 | $16.57 | $15.00 |
| 51 | Lateral underdrain (710-05) | LF | 400 | $11.20 | $15.10 | $13.26 | $12.50 |
| 52 | Lateral underdrain endwall (3:1) (710-06.12) | EACH | 10 | $1,428.57 | $1,510.00 | $1,325.62 | $2,200.00 |
| 53 | Removal & disposal of concrete median barrier (711-05.01) | LF | 821 | $49.63 | $69.50 | $72.63 | $70.00 |
| 54 | 51IN single slope concrete barrier wall (711-05.71) | LF | 76 | $425.00 | $315.00 | $516.87 | $340.00 |
| 55 | Traffic control (712-01) | LS | 1 | $199,850 | $194,410 | $70,269 | $300,000 |
| 56 | Interconnected portable barrier rail (712-02.02) | LF | 3,621 | $49.28 | $65.00 | $28.08 | $62.00 |
| 57 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 4 | $8,500.00 | $8,190.00 | $7,180.42 | $7,000.00 |
| 58 | Flexible drums (channelizing) (712-04.01) | EACH | 100 | $32.50 | $41.00 | $35.90 | $35.00 |
| 59 | Barrier rail delineator (712-04.50) | EACH | 91 | $10.00 | $12.60 | $11.05 | $10.00 |
| 60 | Warning lights (type A) (712-05.01) | EACH | 2 | $20.00 | $25.20 | $22.10 | $23.00 |
| 61 | Signs (construction) (712-06) | SF | 648 | $7.50 | $9.50 | $8.29 | $8.50 |
| 62 | Temporary barricades (type III) (712-07.03) | LF | 24 | $19.00 | $24.00 | $20.99 | $21.00 |
| 63 | Arrow board (type C) (712-08.03) | EACH | 2 | $1,100.00 | $1,390.00 | $1,215.15 | $1,250.00 |
| 64 | Removable pavement marking (8" barrier line) (712-09.02) | LF | 400 | $5.00 | $7.60 | $6.63 | $5.50 |
| 65 | Steel overhead sign structure (span 84'-2") (713-09.01) | EACH | 1 | $145,403 | $183,270 | $150,983 | $150,000 |
| 66 | Steel overhead sign structure (span 64'-3") (713-09.02) | EACH | 1 | $125,835 | $158,600 | $130,692 | $145,000 |
| 67 | Perforated/knockout square tube post (713-11.02) | LB | 2,410 | $5.30 | $6.70 | $5.94 | $5.00 |
| 68 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 128 | $13.23 | $16.70 | $14.82 | $22.00 |
| 69 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 440 | $14.35 | $18.10 | $16.07 | $22.00 |
| 70 | Extruded aluminum panel signs (713-14) | SF | 928 | $28.43 | $36.00 | $31.84 | $34.00 |
| 71 | Removal of signs, posts and footings (713-15) | LS | 1 | $1,625.00 | $2,050.00 | $1,820.16 | $7,500.00 |
| 72 | Changeable message sign unit (713-16.01) | EACH | 2 | $5,750.00 | $7,250.00 | $6,351.91 | $6,000.00 |
| 73 | Signs (R10-11A) (713-16.21) | EACH | 6 | $135.00 | $630.00 | $607.57 | $240.00 |
| 74 | Signs (R10-12) (713-16.22) | EACH | 1 | $135.00 | $630.00 | $607.57 | $252.00 |
| 75 | Structural LIGHTING1 (714-01.20) | LS | 1 | $19,700 | $25,210 | $22,094 | $25,000 |
| 76 | Jacked or bored conduit (714-03) | LF | 310 | $41.00 | $13.50 | $11.79 | $11.75 |
| 77 | Direct burial conduit (2" PVC, schedule 40) (714-03.01) | LF | 2,590 | $24.00 | $16.30 | $14.24 | $14.00 |
| 78 | Pull boxes (type C) (714-05.04) | EACH | 4 | $1,550.00 | $3,530.00 | $3,093.10 | $3,080.00 |
| 79 | Cable (1/C # 6 AWG) (714-06.05) | LF | 11,000 | $2.20 | $3.15 | $2.77 | $2.75 |
| 80 | Cable (#6 solid copper soft drawn) (714-06.08) | LF | 965 | $2.20 | $2.00 | $1.75 | $1.75 |
| 81 | Cable (#6 copper soft drawn bare) (714-06.09) | LF | 2,850 | $2.10 | $2.00 | $1.75 | $1.75 |
| 82 | Light standards (45' M.H., aluminium) (714-08.09) | EACH | 11 | $5,450.00 | $3,530.00 | $3,093.10 | $3,100.00 |
| 83 | Light standards (45' M.H., aluminium) (714-08.10) | EACH | 4 | $5,600.00 | $3,150.00 | $2,761.70 | $3,000.00 |
| 84 | Foundation (only) for light standard (714-08.20) | EACH | 11 | $5,890.00 | $2,520.00 | $3,461.28 | $2,500.00 |
| 85 | Removal of light standard & foundation (714-08.32) | EACH | 9 | $870.00 | $630.00 | $552.34 | $500.00 |
| 86 | Removal of existing cobra head luminaire (714-08.33) | EACH | 57 | $134.00 | $189.00 | $165.70 | $160.00 |
| 87 | Luminaires (72W LED) (714-09.09) | EACH | 6 | $820.00 | $1,890.00 | $1,657.02 | $1,600.00 |
| 88 | Luminaires (175W LED) (714-09.10) | EACH | 72 | $860.00 | $756.00 | $662.81 | $630.00 |
| 89 | Modify exist control center(CC1 and CC2) (714-12.11) | EACH | 2 | $1,650.00 | $1,260.00 | $1,104.68 | $1,050.00 |
| 90 | Electrical connection (see footnote on plans) (714-25.01) | LS | 1 | $2,065.00 | $1,890.00 | $1,657.02 | $1,640.00 |
| 91 | Electrical connection (and reconnection) (714-25.02) | LS | 1 | $6,055.00 | $1,890.00 | $1,657.02 | $1,630.00 |
| 92 | Locating utilities (714-40) | LS | 1 | $34,700 | $44,110 | $11,047 | $5,250.00 |
| 93 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 78 | $50.00 | $126.00 | $110.47 | $38.00 |
| 94 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 476 | $35.00 | $38.00 | $33.14 | $39.00 |
| 95 | Plastic pavement marking (stop line) (716-02.05) | LF | 84 | $30.00 | $25.20 | $22.09 | $20.00 |
| 96 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 26 | $225.00 | $252.00 | $220.94 | $169.00 |
| 97 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 62 | $3.00 | $5.00 | $4.42 | $2.25 |
| 98 | Plastic pavement marking (longitudinal cross-walk) (716-02.09) | LF | 108 | $35.00 | $50.50 | $44.19 | $45.00 |
| 99 | Painted pavement marking (4" line) (716-05.01) | LM | 3 | $1,100.00 | $3,150.00 | $2,761.70 | $1,015.00 |
| 100 | Removal of pavement marking (stop line) (716-08.05) | LF | 150 | $12.00 | $12.60 | $11.05 | $9.00 |
| 101 | Removal of pavement marking (turn lane arrow) (716-08.06) | EACH | 31 | $75.00 | $126.00 | $110.47 | $112.50 |
| 102 | Removal of pavement marking (line) (716-08.20) | LM | 3 | $5,500.00 | $7,560.00 | $6,628.07 | $5,600.00 |
| 103 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 2 | $10,000 | $11,340 | $9,942.11 | $7,800.00 |
| 104 | Enhanced flatline thermo PVMT MRKNG (8IN barrier line) (716-12.03) | LF | 902 | $2.50 | $3.15 | $2.76 | $2.20 |
| 105 | Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05) | LF | 882 | $2.00 | $3.80 | $3.31 | $1.50 |
| 106 | Mobilization (717-01) | LS | 1 | $324,984 | $306,200 | $529,239 | $718,000 |
| 107 | Pull box (type D) (725-20.44) | EACH | 1 | $5,890.00 | $5,670.00 | $4,971.06 | $4,900.00 |
| 108 | Pull box (type E) (725-20.45) | EACH | 3 | $6,970.00 | $6,300.00 | $5,523.40 | $5,250.00 |
| 109 | Conduit bank (type 4) (725-22.24) | LF | 1,790 | $40.00 | $27.50 | $24.06 | $23.00 |
| 110 | Conduit bank bored (type 4) (725-22.34) | LF | 400 | $78.00 | $49.50 | $43.22 | $43.00 |
| 111 | ITS cable marker (725-23.01) | EACH | 4 | $240.00 | $315.00 | $276.17 | $270.00 |
| 112 | Fiber optic cable (72 F) (725-23.10) | LF | 2,240 | $4.90 | $3.15 | $2.76 | $2.60 |
| 113 | Fiber optic cable (144F) (725-23.16) | LF | 2,240 | $5.70 | $3.80 | $3.31 | $3.20 |
| 114 | Fiber optic closure (72 F ) (725-23.25) | EACH | 2 | $1,155.00 | $3,150.00 | $2,761.70 | $2,700.00 |
| 115 | Fiber optic closure (description) (725-23.27) | EACH | 2 | $1,155.00 | $3,150.00 | $2,761.70 | $2,700.00 |
| 116 | Fiber optic splice fusion (725-23.28) | EACH | 432 | $108.00 | $1.25 | $1.10 | $1.00 |
| 117 | As-built plans (725-24.55) | LS | 1 | $9,740.00 | $12,600 | $5,523.40 | $2,700.00 |
| 118 | Remove & relocate existing traffic signal equipment (730-01.01) | EACH | 2 | $1,920.00 | $3,150.00 | $2,761.70 | $10,400 |
| 119 | Removal of signal equipment (730-01.02) | EACH | 2 | $3,845.00 | $11,970 | $10,494 | $1,200.00 |
| 120 | Signal head assembly (130 with backplate) (730-02.09) | EACH | 11 | $1,510.00 | $1,390.00 | $1,215.15 | $1,400.00 |
| 121 | Signal head assembly (150 A2H with backplate) (730-02.17) | EACH | 1 | $1,895.00 | $1,640.00 | $1,436.08 | $1,100.00 |
| 122 | Signal head assembly (130 A3L with backplate) (730-02.30) | EACH | 6 | $1,780.00 | $1,390.00 | $1,215.15 | $1,100.00 |
| 123 | Signal head assembly (130 A3L pole mounted) (730-02.31) | EACH | 3 | $1,555.00 | $1,390.00 | $1,215.15 | $1,100.00 |
| 124 | Signal head assembly (130 A3R with backplate) (730-02.32) | EACH | 4 | $1,575.00 | $1,390.00 | $1,215.15 | $1,100.00 |
| 125 | Signal head assembly (130 A3R pole mounted) (730-02.33) | EACH | 2 | $1,555.00 | $1,390.00 | $1,215.15 | $1,100.00 |
| 126 | Install pull box (type B) (730-03.21) | EACH | 20 | $1,255.00 | $2,270.00 | $1,988.42 | $1,980.00 |
| 127 | Signal cable - 5 conductor (730-08.02) | LF | 10,830 | $2.40 | $2.10 | $1.83 | $1.85 |
| 128 | Signal cable - 7 conductor (730-08.03) | LF | 2,855 | $2.70 | $2.55 | $2.23 | $2.25 |
| 129 | Conduit 2" diameter (PVC schedule 40) (730-12.02) | LF | 1,160 | $25.00 | $20.10 | $17.61 | $17.50 |
| 130 | Conduit 3" diameter (directional bore) (730-12.24) | LF | 2,310 | $27.00 | $12.80 | $11.25 | $11.20 |
| 131 | Vehicle detector (stop line radar) (730-13.09) | EACH | 6 | $10,550 | $8,820.00 | $7,732.75 | $7,600.00 |
| 132 | Vehicle detector (radar - advance) (730-13.13) | EACH | 2 | $11,700 | $8,820.00 | $7,732.76 | $7,500.00 |
| 133 | Modify cabinet (integrate APS, signal & radar equipment) (730-15.11) | EACH | 2 | $2,535.00 | $3,150.00 | $2,761.70 | $2,700.00 |
| 134 | Pedestal pole (type A) (730-23.28) | EACH | 9 | $3,095.00 | $5,040.00 | $4,418.72 | $4,200.00 |
| 135 | Pedestal pole (type B) (730-23.29) | EACH | 5 | $2,635.00 | $5,670.00 | $4,971.06 | $4,900.00 |
| 136 | Cantilever signal support (2 @ 20' & 45') (730-23.55) | EACH | 1 | $33,900 | $28,040 | $23,209 | $26,000 |
| 137 | Cantilever signal support (1 arm @ 30') (730-23.64) | EACH | 1 | $24,500 | $20,170 | $16,875 | $20,000 |
| 138 | Cantilever signal support (1 arm @ 35') (730-23.72) | EACH | 1 | $22,050 | $23,320 | $19,512 | $25,000 |
| 139 | Cantilever signal support (1 arm @ 50') (730-25.01) | EACH | 1 | $28,650 | $30,250 | $25,312 | $30,000 |
| 140 | Cantilever signal support (2 @ 50' & 60') (730-25.04) | EACH | 1 | $46,950 | $38,440 | $32,688 | $35,000 |
| 141 | Cantilever signal support (1 arm @ 70') (730-25.14) | EACH | 1 | $46,050 | $32,140 | $28,231 | $40,000 |
| 142 | Countdown pedestrian signal (730-26.05) | EACH | 2 | $1,765.00 | $945.00 | $828.51 | $800.00 |
| 143 | Pedestrian pushbutton post (730-26.06) | EACH | 1 | $2,515.00 | $3,150.00 | $2,761.70 | $2,600.00 |
| 144 | Pedestrian pushbutton with 15IN sign (730-26.09) | EACH | 2 | $675.00 | $1,580.00 | $1,380.85 | $1,300.00 |
| 145 | Countdown ped SGNL head W/audible pushbutton & 15IN sign (730-26.11) | EACH | 10 | $1,765.00 | $2,520.00 | $2,209.36 | $2,100.00 |
| 146 | Road side unit (rsu) (730-35.50) | EACH | 2 | $12,200 | $11,970 | $10,494 | $10,300 |
| 147 | Geotextile (type III)(erosion control) (740-10.03) | SY | 223 | $3.26 | $7.50 | $13.11 | $7.00 |
| 148 | Temporary sediment tube 12IN (740-11.02) | LF | 4,983 | $3.70 | $3.15 | $3.76 | $4.00 |
| 149 | Temporary sediment tube 20IN (740-11.04) | LF | 1,389 | $4.50 | $3.80 | $4.31 | $4.20 |
| 150 | Seeding (with mulch) (801-01) | UNIT | 123 | $58.00 | $58.50 | $51.06 | $51.00 |
| 151 | Water (seeding & sodding) (801-03) | MG | 902 | $175.00 | $63.00 | $55.23 | $50.00 |
| 152 | Sodding (new sod) (803-01) | SY | 901 | $6.00 | $8.69 | $7.62 | $7.50 |
| 153 | Erosion control blanket (type I) (805-12.01) | SY | 9,800 | $1.40 | $1.25 | $1.10 | $1.10 |
| 154 | Project mowing (806-02.03) | CYCL | 4 | $3,000.00 | $6,300.00 | $3,001.85 | $3,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of June 27, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.