TDOT contract CN263052 bid tabulation

The grading, drainage, and paving on a s.i.a. route (including u.s. 43/s.r. 6) serving project leeward. Let by Tennessee DOT on June 26, 2026, Maury County. 8 bids received; low bid $2,156,542 by Eubank Asphalt Paving & Sealing, LLC.

Owner
Tennessee DOT
Letting
26 JUN 2026
Pay items
131
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Eubank Asphalt Paving & Sealing, LLC$2,156,542Low
2Capital City Construction Services, LLC$3,040,565+41%
3Kenneth Rich Construction Company, Inc.$3,066,779+42%
4Civil Constructors, LLC$3,131,531+45%
5Rogers Group, Inc.$3,173,876+47%
6Dement Construction Group, LLC$3,243,819+50%
7Jones Bros. Contractors, LLC$3,367,776+56%
8Adams Contracting, LLC$3,847,672+78%
TDOT contract CN263052: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Eubank Asphalt Paving & Sealing, LLC2. Capital City Construction Services, LLC3. Kenneth Rich Construction Company, Inc.4. Civil Constructors, LLC5. Rogers Group, Inc.6. Dement Construction Group, LLC
1Construction stakes, lines and grades (105-01)LS1$25,000$15,000$60,000$28,470$20,500$42,150
2Clearing and grubbing (201-01)LS1$28,500$20,000$104,513$32,995$32,000$396,000
3Road & drainage excavation (unclassified) (203-01)CY16,779$12.00$25.34$20.22$30.65$27.00$15.00
4Borrow excavation (graded solid rock) (203-02.01)TON1,098$30.00$56.23$42.00$41.05$36.00$45.00
5Placing and spreading topsoil (203-04)CY2,937.65$12.00$37.72$14.00$24.70$50.00$21.00
6Undercutting (203-05)CY623$16.00$45.60$33.00$37.95$32.00$25.00
7Water (203-06)MG88$20.00$14.29$20.00$10.00$19.00$5.00
8Backfill material (flowable fill) (204-08.01)CY5$400.00$357.14$194.00$457.00$700.00$500.00
918" temporary slope drain (209-02.07)LF22$50.00$35.71$44.00$55.00$91.00$75.00
10Sediment removal (209-05)CY670$10.00$33.08$32.00$34.50$49.00$30.00
11Temporary silt fence (with backing) (209-08.02)LF464$6.00$5.89$7.00$6.55$4.80$5.25
12Temporary silt fence (without backing) (209-08.03)LF3,683$3.00$2.42$3.00$2.70$1.70$2.00
13Rock check dam (209-08.07)EACH9$500.00$747.37$400.00$828.00$984.00$750.00
14Enhanced rock check dam (209-08.08)EACH11$900.00$747.37$600.00$828.00$1,917.00$750.00
15Catch basin protection (type A) (209-40.30)EACH3$100.00$436.84$850.00$484.00$637.00$750.00
16Mineral aggregate, type A base, grading D (303-01)TON5,791$30.00$45.17$41.00$36.65$30.00$30.00
17Mineral aggregate (size 57) (303-10.01)TON17.00$50.00$53.70$48.00$68.15$74.00$50.00
18Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01)TON620$120.00$170.43$163.17$186.00$164.00$164.00
19Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON658$125.00$176.48$163.17$186.00$165.00$165.00
20Asp. conc. mix(PG70-22) (BPMB-HM) GR. A-S (307-01.21)TON251$110.00$206.19$181.33$192.00$155.00$155.00
21Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01)TON368$122.00$215.52$181.33$204.00$174.00$174.00
22Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08)TON413$127.00$208.31$176.29$204.00$175.00$175.00
23Bituminous material for prime coat (PC) (402-01)TON14$200.00$1,263.16$1,517.25$1,170.00$1,200.00$1,200.00
24Aggregate for cover material (PC) (402-02)TON32$20.00$96.84$72.45$46.60$75.00$75.00
25Bituminous material for tack coat (TC) (403-01)TON20$200.00$1,065.26$1,517.25$1,170.00$835.00$835.00
26Acs mix(PG64-22) grading D (411-01.10)TON498$150.00$227.11$212.31$186.00$175.00$175.00
27Acs mix(PG70-22) grading D (411-02.10)TON792$150.00$190.07$212.10$196.00$178.00$178.00
28Scoring shoulders (non-continuous) (16IN width) (411-12.02)LM0.06$20,000$1,000.00$54,863$6,990.00$7,306.00$47,500
29Scoring for rumble stripe (non-continuous) (8IN width) (411-12.03)LM0.17$10,000$1,000.00$54,863$6,990.00$7,306.00$47,500
30Cold planing bituminous pavement (415-01.01)TON839$30.00$46.45$61.56$52.45$45.00$45.00
3118" pipe culvert (607-03.30)LF25$90.00$171.43$72.00$614.00$128.00$415.00
3230" pipe culvert (607-06.30)LF44$150.00$457.14$118.00$209.00$134.00$185.00
3348" pipe culvert (607-09.30)LF15$210.00$685.71$286.91$1,150.00$330.00$600.00
34Class A concrete (pipe endwalls) (611-07.01)CY10$2,000.00$2,000.00$1,200.00$2,150.00$1,766.00$1,250.00
35Steel bar reinforcement (pipe endwalls) (611-07.02)LB372$2.00$2.50$10.00$8.65$3.10$5.00
3618IN endwall (cross drain) 4:1 (611-07.55)EACH2$3,500.00$7,142.86$3,000.00$3,150.00$3,200.00$2,500.00
3730IN endwall (cross drain) 4:1 (611-07.61)EACH2$5,000.00$10,714$5,000.00$6,050.00$7,000.00$4,500.00
38Catch basins, type 42, > 4' - 8' depth (611-42.02)EACH1$8,500.00$16,622$16,000$16,000$14,000$20,000
3918" temporary drainage pipe (621-03.02)LF60$50.00$71.43$50.00$67.90$62.00$100.00
40Extruded sloping curb (702-01.01)LF156$30.00$35.71$38.58$29.15$26.00$28.72
41Earth pad for type 38 GR end treatment (705-04.09)EACH5$500.00$1,052.63$900.00$1,170.00$831.00$800.00
42W beam GR (type 2) MASH TL-3 (705-06.01)LF300$32.91$31.58$40.43$34.95$30.60$29.50
43GR terminaltrailing end (type 13) MASH TL-3 (705-06.10)EACH2$1,625.00$1,578.95$1,600.00$1,750.00$2,077.00$2,000.00
44GR terminal (in-inline) MASH TL-3 (705-06.11)EACH2$1,125.00$1,421.05$1,500.00$1,570.00$1,506.00$1,750.00
45Tangent energy absorbing term MASH TL-3 (705-06.20)EACH2$3,488.00$3,631.58$3,700.00$4,020.00$3,064.00$2,950.00
46Portable impact attenuator NCHRP350 TL-3 (705-08.51)EACH5$7,000.00$5,500.00$11,000$6,220.00$5,603.00$5,340.00
47Guardrail removed (706-01)LF746$3.00$1.05$2.30$1.15$1.10$1.00
48Radius rail (706-06.03)LF214$41.84$46.32$48.00$51.30$36.30$35.00
49High-visibility construction fence (707-08.11)LF442$4.00$2.84$2.89$3.15$2.30$2.20
50Markers (concrete R.O.W. posts) (708-02.01)EACH4$500.00$2,142.86$800.00$588.00$500.00$500.00
51Machined rip-rap (class A-3) (709-05.05)TON102$70.00$82.04$60.00$82.75$57.00$50.00
52Machined rip-rap (class A-1) (709-05.06)TON16$100.00$89.50$60.00$179.00$67.00$50.00
53Machined rip-rap (class C) (709-05.09)TON1,038$50.00$65.55$69.00$81.15$63.00$50.00
54Aggregate underdrains (with pipe) (710-02)LF1,580$14.00$12.11$13.00$13.40$12.30$15.00
55Lateral underdrain (710-05)LF64$14.00$12.63$13.00$14.00$12.90$15.00
56Lateral underdrain endwall (6:1) (710-06.15)EACH3$1,400.00$2,941.43$577.00$1,080.00$992.00$2,500.00
57Traffic control (712-01)LS1$30,000$40,684$175,000$38,390$310,000$183,415
58Interconnected portable barrier rail (712-02.02)LF2,100$32.00$57.50$51.00$49.75$32.00$35.00
59Flexible drums (channelizing) (712-04.01)EACH30$50.00$30.53$38.00$33.80$31.00$29.00
60Barrier rail delineator (712-04.50)EACH98$8.00$15.46$16.00$17.50$16.00$15.00
61Warning lights (type A) (712-05.01)EACH2$20.00$20.00$46.00$23.30$21.00$20.00
62Signs (construction) (712-06)SF779$9.00$6.85$9.24$8.00$7.20$6.85
63Temporary barricades (type III) (712-07.03)LF12$20.00$24.00$23.00$27.95$25.20$24.00
64Arrow board (type C) (712-08.03)EACH2$1,250.00$1,122.45$2,500.00$1,280.00$1,155.00$1,100.00
65Removable pavement marking (8" barrier line) (712-09.02)LF2,215$1.00$4.74$5.20$4.65$4.70$4.50
66Removable pavement marking (6" line) (712-09.08)LF15,262$0.25$3.68$4.00$3.50$3.60$3.50
67Flexible delineator (white) (713-02.14)EACH10$76.00$58.76$63.00$66.45$59.00$57.00
68Perforated/knockout square tube post (713-11.02)LB854$10.36$4.16$4.80$4.70$4.30$4.04
69P post slip base (713-11.21)EACH23$694.00$260.52$600.00$295.00$265.00$252.70
70Street name sign (rigid 0.100IN thick (713-14.21)SF56$10.00$35.71$135.00$28.65$95.60$50.18
71Removal of signs, posts and footings (713-15)LS1$626.00$128.87$1,155.00$146.00$132.00$125.00
72Changeable message sign unit (713-16.01)EACH4$4,000.00$5,051.55$9,600.00$5,710.00$5,145.00$4,900.00
73Signs (R10-12A) (713-16.20)EACH2$300.00$180.41$130.00$204.00$183.00$175.00
74Signs (W3-4, 48"X48") (713-16.21)EACH2$389.00$314.43$320.00$659.00$593.00$553.54
75Signs (W16-13P, 24"X18") (713-16.22)EACH2$232.00$57.73$59.00$370.00$333.00$323.86
76Signs (R2-1, 24"X30") (713-16.23)EACH1$289.00$130.93$133.00$148.00$133.00$127.00
77Signs (W1-8R, 18"X24") (713-16.24)EACH4$232.00$118.56$99.00$134.00$120.00$115.00
78Signs (R5-1, 36"X36") (713-16.25)EACH2$326.00$212.37$200.00$240.00$216.00$206.00
79Signs (R5-1A, 42"X30") (713-16.26)EACH2$339.00$212.37$196.00$240.00$216.00$206.00
80Signs (W13-13, 36"X60") (713-16.27)EACH1$389.00$455.67$326.00$515.00$464.00$442.00
81Signs (W13-1P, 24"X24") (713-16.28)EACH1$289.00$114.43$75.00$129.00$116.00$111.00
82Signs (W13-10, 36"X60") (713-16.29)EACH1$389.00$374.23$252.00$423.00$381.00$363.00
83Signs (W13-11, 36"X60") (713-16.30)EACH1$389.00$374.23$252.00$423.00$381.00$363.00
84Signs (W1-2R, 36"X36") (713-16.31)EACH1$326.00$248.45$152.00$281.00$253.00$241.00
85Signs (W3-8A, 48"X30") (713-16.32)EACH1$389.00$212.37$168.00$240.00$216.00$206.00
86Signs (W1-2R, 30"X30") (713-16.33)EACH1$295.00$189.69$154.00$214.00$193.00$184.00
87Signs (W3-3, 36"X36") (713-16.34)EACH4$326.00$248.45$200.00$281.00$253.00$241.00
88Luminaires (signal pole mounted) (714-09.09)EACH4$1,420.00$1,463.92$1,491.00$2,000.00$1,806.00$1,420.00
89Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH10.64$50.00$47.37$47.25$46.60$46.00$45.00
90Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23)EACH98.75$50.00$47.37$47.25$46.60$46.00$45.00
91Plastic pavement marking(channelization striping) (716-02.04)SY964$35.00$5.26$5.25$40.80$5.20$5.00
92Plastic pavement marking (stop line) (716-02.05)LF334.46$25.00$21.05$21.00$23.30$20.80$20.00
93Plastic pavement marking (turn lane arrow) (716-02.06)EACH26$250.00$263.16$262.00$192.00$259.00$250.00
94Plastic pavement marking (8" dotted line) (716-02.08)LF83$4.00$3.16$3.15$2.35$3.10$3.00
95Plastic word pavement marking (only) (716-03.01)EACH4$650.00$473.68$472.00$478.00$467.00$450.00
96Plastic pavement marking (straight-turn arrow) (716-04.01)EACH3$500.00$368.42$367.00$350.00$363.00$350.00
97Plastic pavement marking (wrong way arrow) (716-04.06)EACH1$1,200.00$421.05$420.00$699.00$415.00$4.00
98Painted pavement marking (4" line) (716-05.01)LM1.01$2,500.00$2,105.26$2,100.00$1,160.00$2,067.00$2,000.00
99Painted pavement marking (8" barrier line) (716-05.02)LF2,215$1.00$0.53$0.55$1.35$0.55$0.50
100Painted pavement marking (6" line) (716-05.20)LM0.81$3,500.00$2,631.58$2,625.00$1,520.00$2,597.00$2,500.00
101Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM0.81$10,000$8,947.37$8,925.00$8,970.00$8,830.00$8,500.00
102Enhanced flat line thermo (8IN line) (716-12.06)LF1,299.99$4.00$2.11$2.10$2.35$2.10$2.00
103Mobilization (717-01)LS1$110,000$132,477$175,000$158,500$260,000$342,944
104CCTV camera system (pan tilt & zoom) (725-20.91)EACH1$8,260.00$8,428.57$8,673.00$14,280$12,864$8,260.00
105Removal of signal equipment (730-01.02)EACH1$2,500.00$2,551.02$2,625.00$5,620.00$5,061.00$2,500.00
106Signal head assembly (130 A3 with backplate) (730-02.03)EACH3$1,514.00$1,544.90$1,589.00$1,680.00$1,517.00$1,514.00
107Signal head assembly (130 with backplate) (730-02.09)EACH7$1,514.00$1,544.90$1,589.00$1,640.00$1,475.00$1,514.00
108Signal head assembly (150 A2H with backplate) (730-02.17)EACH1$2,642.00$2,695.92$2,774.00$2,700.00$2,431.00$2,642.00
109Signal head assembly (130 A3F with backplate) (730-02.51)EACH2$1,517.00$1,547.96$1,592.00$1,690.00$1,522.00$1,517.00
110Install pull box (type B) (730-03.21)EACH10$1,200.00$1,224.49$1,260.00$1,390.00$1,249.00$1,200.00
111Electrical service connection (730-05.01)EACH1$8,000.00$8,163.27$8,400.00$5,150.00$4,636.00$8,000.00
112Signal cable - 5 conductor (730-08.02)LF1,815$2.50$2.55$2.25$2.35$2.10$2.50
113Signal cable - 7 conductor (730-08.03)LF1,370$2.75$2.81$2.88$2.90$2.60$2.75
114Conduit 2" diameter (PVC schedule 40) (730-12.02)LF1,375$22.00$22.45$23.00$19.80$17.80$22.00
115Conduit 2" diameter (directional bore) (730-12.23)LF790$80.00$81.63$84.00$33.80$30.50$80.00
116Vehicle detector (radar - stop line) (730-13.12)EACH4$11,160$11,388$11,718$12,240$11,026$11,160
117Vehicle detector (radar - advance) (730-13.13)EACH2$11,656$11,894$12,238$13,350$12,024$11,656
118Cabinet (eight phase base mounted) (730-15.32)EACH1$28,828$29,416$30,269$31,000$27,934$28,828
119Controller (atc) (730-16.04)EACH1$6,455.00$6,586.73$6,777.00$7,460.00$6,721.00$6,455.00
120Pedestal pole (advanced flashing beacon) (730-23.30)EACH2$4,391.00$4,480.61$4,610.00$5,030.00$4,531.00$4,391.00
121Cantilever signal support (1 arm @ 65') (730-25.13)EACH2$46,136$47,072$4,844.00$54,840$49,411$46,136
122Cantilever signal support (1 arm @ 70') (730-25.14)EACH2$46,036$46,976$48,337$56,950$51,312$46,036
123Flashing warning beacon (advanced warning to stop) (730-26.07)EACH2$1,832.00$1,869.39$1,923.00$1,960.00$1,769.00$1,832.00
124Geotextile (type III)(erosion control) (740-10.03)SY825$3.50$3.27$4.85$3.75$2.30$5.00
125Geotextile (type IV)(stabilization) (740-10.04)SY1,369$4.00$3.57$7.31$9.50$2.30$4.74
126Temporary sediment tube 18IN (740-11.03)LF59$40.00$4.69$4.42$5.35$3.40$4.50
127Temporary seeding (with mulch) (801-01.07)UNIT170$50.00$48.98$47.25$55.95$46.70$45.00
128Water (seeding & sodding) (801-03)MG17$50.00$163.27$42.00$186.00$41.50$40.00
129Seed (supplemental application) (801-07)LB56$10.00$4.69$5.25$5.35$5.20$5.00
130Fertilizer (supplemental application) (801-08)TON1$2,000.00$2,653.06$1,050.00$3,030.00$1,038.00$1,000.00
131Sodding (new sod) (803-01)SY6,240$5.00$5.82$5.00$6.65$5.00$4.80
TDOT contract CN263052: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of June 26, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy