TDOT contract CNZ076 bid tabulation
The grading, drainage, and paving on a s.i.a. route serving integrity mold and murco wall products in pulaski. Let by Tennessee DOT on May 9, 2025, Giles County. 3 bids received; low bid $2,815,944 by Eubank Asphalt Paving & Sealing, LLC.
- Owner
- Tennessee DOT
- Letting
- 09 MAY 2025
- Pay items
- 94
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Eubank Asphalt Paving & Sealing, LLC | $2,815,944 | Low |
| 2 | Civil Constructors, LLC | $3,198,675 | +14% |
| 3 | Adams Contracting, LLC | $3,990,163 | +42% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Eubank Asphalt Paving & Sealing, LLC | 2. Civil Constructors, LLC | 3. Adams Contracting, LLC |
|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $50,000 | $28,220 | $40,000 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $70,000 | $28,210 | $75,000 |
| 3 | Removal of structures and obstructions (202-01) | LS | 1 | $8,000.00 | $16,830 | $15,000 |
| 4 | Removal of pipe (18" RCP ,sta. 83+25 LT.) (202-02.01) | LF | 22 | $20.00 | $25.90 | $60.00 |
| 5 | Removal of pipe (12" CMP ,sta. 87+26 RT.) (202-02.02) | LF | 20 | $20.00 | $28.50 | $50.00 |
| 6 | Removal of pipe (24" CMP ,sta. 87+74 LT.) (202-02.03) | LF | 24 | $25.00 | $35.50 | $50.00 |
| 7 | Removal of pipe (24" CMP ,sta. 99+56) (202-02.04) | LF | 47 | $25.00 | $36.50 | $50.00 |
| 8 | Removal of pipe (18" CMP ,sta. 99+73 LT.) (202-02.05) | LF | 25 | $25.00 | $22.80 | $50.00 |
| 9 | Removal of pipe (24" CMP ,sta.101+34 RT.) (202-02.06) | LF | 24 | $25.00 | $35.50 | $50.00 |
| 10 | Removal of pipe (24" CMP ,sta. 103+87 RT.) (202-02.07) | LF | 20 | $25.00 | $35.50 | $50.00 |
| 11 | Removal of pipe (2-30"X18" RCP ,sta. 114+03 LT.) (202-02.08) | LF | 35 | $50.00 | $38.00 | $90.00 |
| 12 | Removal of pipe (36" CMP ,sta. 116+69) (202-02.09) | LF | 38 | $50.00 | $36.50 | $50.00 |
| 13 | Removal of pipe (15" CMP ,sta. 117+37 LT.) (202-02.10) | LF | 20 | $20.00 | $28.50 | $50.00 |
| 14 | Removal of pipe (18" RCP ,sta. 83+25 LT.) (202-02.11) | LF | 29 | $20.00 | $27.00 | $75.00 |
| 15 | Road & drainage excavation (unclassified) (203-01) | CY | 8,314 | $40.00 | $60.20 | $60.00 |
| 16 | Borrow excavation (graded solid rock) (203-02.01) | TON | 1,160 | $50.00 | $60.00 | $70.00 |
| 17 | Placing and spreading topsoil (203-04) | CY | 1,513 | $15.00 | $31.50 | $25.00 |
| 18 | Water (203-06) | MG | 46 | $50.00 | $12.00 | $100.00 |
| 19 | Foundation fill material (204-08) | CY | 10 | $220.00 | $229.00 | $200.00 |
| 20 | 18" temporary slope drain (209-02.07) | LF | 110 | $25.00 | $46.00 | $75.00 |
| 21 | Sediment removal (209-05) | CY | 100 | $20.00 | $28.40 | $15.00 |
| 22 | Temporary silt fence (with backing) (209-08.02) | LF | 2,300 | $6.10 | $4.85 | $5.75 |
| 23 | Temporary silt fence (without backing) (209-08.03) | LF | 1,550 | $3.25 | $2.30 | $3.25 |
| 24 | Enhanced rock check dam (209-08.08) | EACH | 25 | $900.00 | $985.00 | $1,100.00 |
| 25 | Sandbags (209-09.01) | BAG | 950 | $5.00 | $11.40 | $6.00 |
| 26 | Sediment filter bag (15' X 15') (209-09.03) | EACH | 3 | $800.00 | $603.00 | $500.00 |
| 27 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 38 | $10.00 | $10.50 | $20.00 |
| 28 | Mineral aggregate, type A base, grading D (303-01) | TON | 5,592 | $36.00 | $37.00 | $45.00 |
| 29 | Granular backfill (roadway) (303-01.01) | TON | 147 | $60.00 | $69.00 | $60.00 |
| 30 | Mineral aggregate (size 57) (303-10.01) | TON | 100 | $50.00 | $50.50 | $80.00 |
| 31 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 2,360 | $110.00 | $126.00 | $190.00 |
| 32 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 1,650 | $124.00 | $142.00 | $190.00 |
| 33 | Bituminous material for prime coat (PC) (402-01) | TON | 21 | $1,080.00 | $1,240.00 | $1,800.00 |
| 34 | Aggregate for cover material (PC) (402-02) | TON | 70 | $125.00 | $143.00 | $82.00 |
| 35 | Bituminous material for tack coat (TC) (403-01) | TON | 13 | $810.00 | $928.00 | $1,800.00 |
| 36 | Acs mix(PG64-22) grading D (411-01.10) | TON | 968 | $178.00 | $204.00 | $230.00 |
| 37 | Cold planing bituminous pavement (415-01.02) | SY | 8,792 | $2.00 | $9.70 | $7.00 |
| 38 | Class A concrete (roadway) (604-01.01) | CY | 15 | $4,000.00 | $4,580.00 | $5,000.00 |
| 39 | Steel bar reinforcement (roadway) (604-01.02) | LB | 4,212 | $2.00 | $2.30 | $3.00 |
| 40 | 24" concrete pipe culvert (class III) (607-05.02) | LF | 67 | $135.00 | $394.00 | $380.00 |
| 41 | 54" concrete pipe culvert (class III) (607-10.02) | LF | 48 | $600.00 | $719.00 | $490.00 |
| 42 | 30"X 19" horizontal oval concrete pipe culvert (607-16.02) | LF | 200 | $200.00 | $273.00 | $280.00 |
| 43 | 18" pipe culvert (side drain) (607-39.02) | LF | 178 | $90.00 | $144.00 | $120.00 |
| 44 | 24" pipe culvert (side drain) (607-39.03) | LF | 64 | $125.00 | $214.00 | $140.00 |
| 45 | Adjustment of existing manhole (611-01.20) | EACH | 1 | $1,000.00 | $1,860.00 | $2,800.00 |
| 46 | Class A concrete (pipe endwalls) (611-07.01) | CY | 23 | $3,000.00 | $2,290.00 | $1,900.00 |
| 47 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 1,685 | $2.00 | $2.30 | $3.50 |
| 48 | 18IN endwall (side drain) (611-07.31) | EACH | 10 | $3,500.00 | $5,050.00 | $4,400.00 |
| 49 | 24IN endwall (side drain) (611-07.32) | EACH | 4 | $4,200.00 | $4,130.00 | $6,300.00 |
| 50 | 18" temporary drainage pipe (621-03.02) | LF | 84 | $50.00 | $73.50 | $125.00 |
| 51 | 48" temporary drainage pipe (621-03.07) | LF | 120 | $85.00 | $199.00 | $200.00 |
| 52 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 1,998 | $32.00 | $29.80 | $29.00 |
| 53 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 4 | $1,100.00 | $1,600.00 | $1,600.00 |
| 54 | GR terminal (energy absorbing) MASH TL-2 (705-06.30) | EACH | 7 | $3,000.00 | $3,550.00 | $3,400.00 |
| 55 | Rounded end element (706-10.26) | EACH | 3 | $125.00 | $401.00 | $390.00 |
| 56 | High-visibility construction fence (707-08.11) | LF | 1,700 | $3.00 | $2.00 | $3.50 |
| 57 | Machined rip-rap (class A-3) (709-05.05) | TON | 150 | $75.00 | $54.50 | $66.00 |
| 58 | Machined rip-rap (class A-1) (709-05.06) | TON | 495 | $70.00 | $55.50 | $65.00 |
| 59 | Machined rip-rap (class B) (709-05.08) | TON | 20 | $100.00 | $102.00 | $69.00 |
| 60 | Traffic control (712-01) | LS | 1 | $51,000 | $74,633 | $250,000 |
| 61 | Portable barrier rail (MASH TL-3) (712-02.10) | LF | 250 | $50.00 | $89.00 | $80.00 |
| 62 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 2 | $5,000.00 | $7,450.00 | $9,000.00 |
| 63 | Flexible drums (channelizing) (712-04.01) | EACH | 40 | $35.00 | $38.00 | $35.00 |
| 64 | Signs (construction) (712-06) | SF | 226 | $9.00 | $8.70 | $8.50 |
| 65 | "U" section steel posts (713-11.01) | LB | 99 | $5.00 | $5.70 | $9.25 |
| 66 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 19 | $16.00 | $17.80 | $29.00 |
| 67 | Removal & relocation of sign & support (713-15.02) | EACH | 2 | $300.00 | $338.00 | $110.00 |
| 68 | Changeable message sign unit (descript) (713-16.04) | EACH | 4 | $7,500.00 | $6,760.00 | $9,400.00 |
| 69 | Plastic pavement marking (stop line) (716-02.05) | LF | 40 | $25.00 | $22.90 | $22.00 |
| 70 | Painted pavement marking (4" line) (716-05.01) | LM | 0.80 | $2,500.00 | $1,720.00 | $1,700.00 |
| 71 | Spray thermo PVMT MRKNG (60 mil) (6IN line) (716-13.02) | LM | 3 | $8,000.00 | $5,730.00 | $5,500.00 |
| 72 | Mobilization (717-01) | LS | 1 | $250,000 | $153,470 | $390,000 |
| 73 | Geotextile (type III)(erosion control) (740-10.03) | SY | 1,638 | $3.00 | $2.30 | $3.00 |
| 74 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 1,507 | $3.50 | $4.55 | $3.00 |
| 75 | Temporary sediment tube 12IN (740-11.02) | LF | 1,650 | $6.00 | $2.85 | $4.00 |
| 76 | Seeding (with mulch) (801-01) | UNIT | 10 | $120.00 | $35.00 | $190.00 |
| 77 | Grass seed mix (ripzn/FLPL) W/mulch (801-01.35) | UNIT | 1.50 | $500.00 | $246.00 | $400.00 |
| 78 | Special wetland seed mixture (801-01.36) | UNIT | 1 | $500.00 | $221.00 | $550.00 |
| 79 | Seeding (without mulch) (801-02) | UNIT | 20 | $100.00 | $14.90 | $66.00 |
| 80 | Temporary seeding (without mulch) (801-02.08) | UNIT | 20 | $100.00 | $46.00 | $55.00 |
| 81 | Water (seeding & sodding) (801-03) | MG | 90 | $50.00 | $115.00 | $110.00 |
| 82 | Sodding (new sod) (803-01) | SY | 7,850 | $5.50 | $6.10 | $7.75 |
| 83 | Turf reinforcement mat (class I) (805-01.01) | SY | 2,215 | $5.00 | $3.45 | $4.50 |
| 84 | Pole 45FT class 3 wood (793-01.17) | EACH | 1 | $3,500.00 | $4,010.00 | $3,900.00 |
| 85 | Anchor 1IN (793-01.41) | EACH | 1 | $1,500.00 | $1,720.00 | $1,700.00 |
| 86 | Composite handhole 5FTX3FTX3FT (793-11.17) | EACH | 3 | $5,000.00 | $5,730.00 | $5,500.00 |
| 87 | 4IN schedule 40 PVC (793-13.07) | LF | 7,046 | $12.00 | $13.80 | $14.00 |
| 88 | 1 duct formation @ 36IN depth (793-13.12) | LF | 30 | $65.00 | $74.50 | $71.00 |
| 89 | 2 duct formation @ 36IN depth (793-13.17) | LF | 2,931 | $68.00 | $78.00 | $74.00 |
| 90 | 2 duct formation @ 48IN depth (793-13.18) | LF | 493 | $85.00 | $97.50 | $93.00 |
| 91 | 4 duct formation @ 36IN depth (793-13.27) | LF | 42 | $80.00 | $91.50 | $87.00 |
| 92 | 4IN SCH 80 orange flexpipe (793-14.19) | LF | 111 | $15.00 | $17.20 | $17.00 |
| 93 | Directional bore 4IN/flex sleeve (793-16.04) | LF | 111 | $160.00 | $183.00 | $180.00 |
| 94 | Remove poles all sizes (793-98.04) | EACH | 5 | $500.00 | $573.00 | $550.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of May 9, 2025. Compiled by Mirage Metrics.