TDOT contract CNZ153 bid tabulation
The grading, drainage, signals, and paving on u.s. 70 (s.r. 24) from terrace hill road (l.m. 5.90) to adeles garden road (l.m. 6.49). Let by Tennessee DOT on May 9, 2025, Wilson County. 5 bids received; low bid $1,641,155 by Sessions Paving Company.
- Owner
- Tennessee DOT
- Letting
- 09 MAY 2025
- Pay items
- 90
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sessions Paving Company | $1,641,155 | Low |
| 2 | Civil Constructors, LLC | $1,848,358 | +13% |
| 3 | Cleary Construction, Inc. | $2,165,942 | +32% |
| 4 | Adams Contracting, LLC | $2,564,819 | +56% |
| 5 | Vulcan Construction Materials, LLC | $2,597,440 | +58% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sessions Paving Company | 2. Civil Constructors, LLC | 3. Cleary Construction, Inc. | 4. Adams Contracting, LLC | 5. Vulcan Construction Materials, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $30,000 | $27,190 | $75,000 | $40,000 | $120,000 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $20,000 | $7,790.00 | $50,000 | $50,000 | $60,000 |
| 3 | Removal of structures and obstructions (202-01) | LS | 1 | $28,000 | $20,550 | $50,000 | $75,000 | $40,000 |
| 4 | Road & drainage excavation (unclassified) (203-01) | CY | 3,554 | $45.00 | $53.50 | $71.00 | $70.00 | $85.00 |
| 5 | Placing and spreading topsoil (203-04) | CY | 441 | $35.00 | $44.00 | $75.00 | $67.00 | $55.00 |
| 6 | Sediment removal (209-05) | CY | 68 | $28.00 | $46.00 | $86.00 | $23.00 | $85.00 |
| 7 | Enhanced rock check dam (209-08.08) | EACH | 10 | $550.00 | $707.00 | $970.00 | $660.00 | $630.00 |
| 8 | Filter sock check dam (209-08.09) | EACH | 26 | $330.00 | $324.00 | $350.00 | $300.00 | $287.00 |
| 9 | Catch basin filter assembly(type 1) (209-40.41) | EACH | 3 | $1,100.00 | $619.00 | $660.00 | $580.00 | $547.00 |
| 10 | Mineral aggregate, type A base, grading D (303-01) | TON | 2,706 | $52.00 | $46.50 | $45.00 | $57.00 | $60.00 |
| 11 | Mineral aggregate (size 57) (303-10.01) | TON | 80 | $75.00 | $66.00 | $68.00 | $87.00 | $70.00 |
| 12 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 212 | $179.00 | $191.00 | $225.00 | $200.00 | $175.00 |
| 13 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01) | TON | 456 | $187.00 | $162.00 | $235.00 | $210.00 | $175.00 |
| 14 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08) | TON | 224 | $187.00 | $199.00 | $235.00 | $210.00 | $175.00 |
| 15 | Bituminous material for prime coat (PC) (402-01) | TON | 3 | $1,400.00 | $1,310.00 | $1,765.00 | $1,600.00 | $1,000.00 |
| 16 | Aggregate for cover material (PC) (402-02) | TON | 13 | $75.00 | $76.00 | $95.00 | $82.00 | $145.00 |
| 17 | Bituminous material for tack coat (TC) (403-01) | TON | 2 | $1,400.00 | $1,750.00 | $1,765.00 | $1,600.00 | $1,000.00 |
| 18 | Saw cutting asphalt pavement (407-20.05) | LF | 1,750 | $11.00 | $7.60 | $3.40 | $7.25 | $5.20 |
| 19 | Acs mix (PG64-22) grading E shoulder (411-01.07) | TON | 102 | $215.00 | $255.00 | $271.00 | $240.00 | $300.00 |
| 20 | Acs mix(PG64-22) grading D (411-01.10) | TON | 173 | $215.00 | $234.00 | $271.00 | $240.00 | $300.00 |
| 21 | Acs mix(PG70-22) grading D (411-02.10) | TON | 352 | $220.00 | $220.00 | $278.00 | $245.00 | $300.00 |
| 22 | Scoring for rumble stripe (non-continuous) (4IN width) (411-12.04) | LM | 0.40 | $24,000 | $24,310 | $26,500 | $26,100 | $21,500 |
| 23 | Cold planing bituminous pavement (415-01.01) | TON | 244 | $85.00 | $95.00 | $70.00 | $90.00 | $70.00 |
| 24 | 15IN pipe culvert (607-02.30) | LF | 14 | $195.00 | $596.00 | $134.00 | $180.00 | $500.00 |
| 25 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 98 | $195.00 | $307.00 | $140.00 | $240.00 | $550.00 |
| 26 | 18" pipe culvert (side drain) (607-39.02) | LF | 295 | $140.00 | $164.00 | $131.00 | $130.00 | $150.00 |
| 27 | Junction box, type 1 (611-02.10) | EACH | 1 | $6,600.00 | $9,050.00 | $8,800.00 | $5,100.00 | $5,000.00 |
| 28 | Trench drains (611-05.01) | LF | 45 | $330.00 | $505.00 | $550.00 | $475.00 | $500.00 |
| 29 | 12IN PVC pipe for trench drains (611-05.02) | LF | 32 | $110.00 | $242.00 | $96.00 | $110.00 | $250.00 |
| 30 | Class A concrete (pipe endwalls) (611-07.01) | CY | 1 | $3,850.00 | $2,270.00 | $2,000.00 | $4,000.00 | $2,000.00 |
| 31 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 45 | $6.00 | $19.20 | $46.00 | $3.00 | $3.00 |
| 32 | 18IN endwall (side drain) (611-07.31) | EACH | 26 | $2,750.00 | $4,240.00 | $4,225.00 | $4,500.00 | $5,000.00 |
| 33 | Catch basins, type 12, 0' - 4' depth (611-12.01) | EACH | 1 | $7,150.00 | $8,720.00 | $6,500.00 | $7,500.00 | $5,500.00 |
| 34 | Catch basins, type 12, > 4' - 8' depth (611-12.02) | EACH | 1 | $7,150.00 | $9,370.00 | $6,830.00 | $10,000 | $7,500.00 |
| 35 | Catch basins, type 42, 0' - 4' depth (611-42.01) | EACH | 1 | $7,150.00 | $7,362.11 | $5,600.00 | $7,500.00 | $5,500.00 |
| 36 | Concrete combined curb & gutter (702-03) | CY | 77 | $575.00 | $555.00 | $595.00 | $590.00 | $490.00 |
| 37 | Markers (concrete R.O.W. posts) (708-02.01) | EACH | 12 | $825.00 | $558.00 | $630.00 | $650.00 | $849.00 |
| 38 | Machined rip-rap (class A-3) (709-05.05) | TON | 150 | $85.00 | $73.50 | $85.00 | $85.00 | $70.00 |
| 39 | Machined rip-rap (class A-1) (709-05.06) | TON | 368 | $85.00 | $64.50 | $85.00 | $85.00 | $70.00 |
| 40 | Traffic control (712-01) | LS | 1 | $40,000 | $41,190 | $200,000 | $400,000 | $130,000 |
| 41 | Interconnected portable barrier rail (712-02.02) | LF | 2,248 | $55.00 | $89.00 | $56.00 | $70.00 | $150.00 |
| 42 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 6 | $11,000 | $7,660.00 | $8,200.00 | $10,000 | $20,000 |
| 43 | Flexible drums (channelizing) (712-04.01) | EACH | 25 | $50.00 | $39.00 | $53.00 | $46.00 | $38.00 |
| 44 | Barrier rail delineator (712-04.50) | EACH | 100 | $15.00 | $11.80 | $14.00 | $14.00 | $7.25 |
| 45 | Warning lights (type A) (712-05.01) | EACH | 4 | $40.00 | $23.60 | $44.00 | $36.00 | $10.00 |
| 46 | Signs (construction) (712-06) | SF | 328 | $9.00 | $9.00 | $9.50 | $8.25 | $9.75 |
| 47 | Temporary barricades (type III) (712-07.03) | LF | 12 | $16.00 | $37.50 | $15.00 | $16.00 | $28.00 |
| 48 | Arrow board (type C) (712-08.03) | EACH | 1 | $1,500.00 | $1,470.00 | $2,775.00 | $1,200.00 | $950.00 |
| 49 | "U" section steel posts (713-11.01) | LB | 654 | $7.00 | $3.55 | $3.80 | $6.25 | $4.05 |
| 50 | U post slip base (713-11.22) | EACH | 20 | $550.00 | $118.00 | $126.00 | $550.00 | $225.00 |
| 51 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 120 | $21.00 | $15.60 | $16.70 | $20.00 | $16.00 |
| 52 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 9 | $25.00 | $15.60 | $16.70 | $23.00 | $16.75 |
| 53 | Removal of signs, posts and footings (713-15) | LS | 1 | $600.00 | $1,770.00 | $630.00 | $550.00 | $1,500.00 |
| 54 | Changeable message sign unit (713-16.01) | EACH | 2 | $8,600.00 | $6,950.00 | $10,500 | $8,500.00 | $5,500.00 |
| 55 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 56 | $100.00 | $118.00 | $44.00 | $39.00 | $104.00 |
| 56 | Removal of snowplowable reflective marker (716-01.30) | EACH | 20 | $100.00 | $118.00 | $23.00 | $20.00 | $104.00 |
| 57 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 32 | $50.00 | $59.00 | $50.00 | $44.00 | $52.10 |
| 58 | Plastic pavement marking (stop line) (716-02.05) | LF | 65 | $30.00 | $35.50 | $25.00 | $22.00 | $31.30 |
| 59 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 10 | $250.00 | $295.00 | $250.00 | $220.00 | $260.00 |
| 60 | Plastic pavement marking (8IN line) (716-02.12) | LM | 0.10 | $20,000 | $23,570 | $13,870 | $12,000 | $20,800 |
| 61 | Plastic pavement marking(double turning arrow) (716-04.02) | EACH | 1 | $550.00 | $648.00 | $440.00 | $390.00 | $573.00 |
| 62 | Plastic pavement marking (transverse shoulder) (716-04.04) | LF | 380 | $8.00 | $9.40 | $19.00 | $17.00 | $8.35 |
| 63 | Plastic pavement marking (straight arrow) (716-04.05) | EACH | 6 | $250.00 | $295.00 | $250.00 | $220.00 | $260.00 |
| 64 | Plastic pavement marking (bikelane symbol & arrow) (716-04.13) | EACH | 9 | $650.00 | $766.00 | $630.00 | $550.00 | $677.00 |
| 65 | Painted pavement marking (8" barrier line) (716-05.02) | LF | 1,260 | $1.00 | $1.20 | $1.90 | $1.75 | $1.05 |
| 66 | Painted pavement marking (6" line) (716-05.20) | LM | 1.60 | $1,600.00 | $1,890.00 | $1,650.00 | $1,500.00 | $1,670.00 |
| 67 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 1.60 | $8,500.00 | $10,020 | $8,825.00 | $7,700.00 | $8,860.00 |
| 68 | Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05) | LF | 350 | $3.00 | $3.55 | $2.50 | $2.25 | $3.15 |
| 69 | Mobilization (717-01) | LS | 1 | $45,000 | $102,150 | $105,000 | $230,000 | $110,000 |
| 70 | Removal of signal equipment (730-01.02) | EACH | 2 | $1,500.00 | $1,180.00 | $1,000.00 | $1,000.00 | $625.00 |
| 71 | Pedestal pole (type B) (730-23.29) | EACH | 2 | $3,000.00 | $1,770.00 | $3,950.00 | $3,500.00 | $5,670.00 |
| 72 | School speed limit flashing assembly (solar powered) (730-50.30) | EACH | 2 | $12,500 | $6,130.00 | $4,300.00 | $4,000.00 | $7,590.00 |
| 73 | Geotextile (type III)(erosion control) (740-10.03) | SY | 312 | $8.25 | $4.05 | $3.85 | $3.00 | $5.15 |
| 74 | Temporary sediment tube 18IN (740-11.03) | LF | 3,900 | $13.20 | $4.40 | $4.75 | $4.25 | $3.90 |
| 75 | 1-1/4IN PVC force main (797-03.02) | LF | 300 | $33.00 | $71.00 | $97.00 | $90.00 | $70.60 |
| 76 | 1-1/2IN PVC force main (797-03.03) | LF | 240 | $40.00 | $71.50 | $97.50 | $95.00 | $78.50 |
| 77 | 2IN PVC force main (797-03.04) | LF | 80 | $40.00 | $84.00 | $104.00 | $100.00 | $94.20 |
| 78 | Bore/jack __in steel casing pipe-uncon. (797-06.71) | LF | 33 | $225.00 | $1,050.00 | $500.00 | $450.00 | $471.00 |
| 79 | Bore/jack 6IN steel casing pipe-rock. (797-06.72) | LF | 33 | $225.00 | $1,230.00 | $820.00 | $550.00 | $549.00 |
| 80 | DI fittings (797-08.01) | LB | 100 | $17.00 | $21.20 | $27.50 | $25.00 | $31.40 |
| 81 | Connect to <2IN force main (797-10.13) | EACH | 4 | $1,650.00 | $2,830.00 | $1,365.00 | $4,000.00 | $4,470.00 |
| 82 | Connect to 2IN force main (797-10.14) | EACH | 1 | $2,200.00 | $4,250.00 | $1,400.00 | $5,500.00 | $4,470.00 |
| 83 | Seeding (with mulch) (801-01) | UNIT | 25 | $100.00 | $46.00 | $50.00 | $100.00 | $40.60 |
| 84 | Temporary seeding (with mulch) (801-01.07) | UNIT | 20 | $90.00 | $41.50 | $44.00 | $50.00 | $36.50 |
| 85 | Water (seeding & sodding) (801-03) | MG | 5 | $100.00 | $118.00 | $125.00 | $110.00 | $104.00 |
| 86 | 4IN PVC force main (797-03.06) | LF | 680 | $88.00 | $85.00 | $102.00 | $150.00 | $165.00 |
| 87 | DI fittings (797-08.01) | LB | 300 | $17.00 | $20.70 | $27.50 | $25.00 | $31.40 |
| 88 | 2IN plug valve assembly (797-09.29) | EACH | 1 | $1,650.00 | $1,740.00 | $3,280.00 | $1,800.00 | $7,850.00 |
| 89 | Cut and cap 4IN force main (797-09.43) | EACH | 2 | $1,400.00 | $1,230.00 | $1,900.00 | $3,750.00 | $7,060.00 |
| 90 | Connect to 4IN force main (797-10.16) | EACH | 2 | $2,750.00 | $3,680.00 | $2,300.00 | $6,000.00 | $15,700 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of May 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.