TDOT contract CNZ307 bid tabulation

The construction of a concrete box beam bridge on salem street over roe creek (l.m. 0.68), including grading, drainage, and paving. Let by Tennessee DOT on December 5, 2025, Gibson County. 5 bids received; low bid $1,632,658 by Dement Construction Group, LLC.

Owner
Tennessee DOT
Letting
05 DEC 2025
Pay items
95
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Dement Construction Group, LLC$1,632,658Low
2Ford Construction Company$1,907,131+17%
3Volunteer Bridge Construction, Inc.$2,098,028+29%
4Thomson & Thomson, Inc.$2,154,487+32%
5Bell & Associates Construction, LLC$2,524,989+55%
TDOT contract CNZ307: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Dement Construction Group, LLC2. Ford Construction Company3. Volunteer Bridge Construction, Inc.4. Thomson & Thomson, Inc.5. Bell & Associates Construction, LLC
1Construction stakes, lines and grades (105-01)LS1$15,000$26,000$23,000$15,000$22,000
2Clearing and grubbing (201-01)LS1$15,000$65,000$75,000$36,000$115,000
3Removal of pipe (12" RCP ,36+08.61 off. -16.23') (202-02.01)LF22$8.00$26.00$60.00$8.00$40.00
4Removal of pipe (12" RCP,36+77.67 off. -16.26') (202-02.02)LF21$8.00$26.00$60.00$8.00$40.00
5Removal of pipe (12" RCP,from: 35+44.96 to: 35+92.50 off. -19.60') (202-02.03)LF43$8.00$26.00$60.00$8.00$30.00
6Removal of pipe (48" RCP, sta. 43+27.34 off. 24.99') (202-02.04)LF32$12.00$58.00$60.00$12.00$50.00
7Removal of rigid pavement, sidewalk, etc. (202-03)SY132$9.00$67.00$30.00$9.00$50.00
8Removal of asphalt pavement (202-03.01)SY2,540$5.50$17.00$12.00$5.50$14.00
9Road & drainage excavation (unclassified) (203-01)CY6,540$12.00$12.50$11.00$12.00$22.00
10Borrow excavation (unclassified) (203-03)CY8,700$14.00$14.50$13.50$14.00$30.00
11Placing and spreading topsoil (203-04)CY1,366$4.00$8.00$20.00$4.00$20.00
12Water (203-06)MG71$33.00$33.00$10.00$33.00$20.00
13Sediment removal (209-05)CY68$17.00$32.00$2.00$17.00$10.00
14Temporary silt fence (with backing) (209-08.02)LF1,573$3.45$3.45$7.00$6.00$5.50
15Temporary silt fence (without backing) (209-08.03)LF315$2.75$2.75$7.50$1.12$2.25
16Rock check dam (209-08.07)EACH7$900.00$850.00$1,500.00$800.00$650.00
17Enhanced rock check dam (209-08.08)EACH6$1,250.00$1,000.00$2,000.00$1,000.00$670.00
18Sandbags (209-09.01)BAG25$6.00$30.00$10.00$12.00$45.00
19Sediment filter bag (15' X 15') (209-09.03)EACH6$1.00$150.00$2,500.00$200.00$200.00
20Polyethylene sheeting (10 mil.) (209-20.04)SY200$5.64$5.00$8.00$3.00$2.00
21Catch basin protection (type D) (209-40.33)EACH1$450.00$450.00$1,500.00$400.00$250.00
22Temporary diversion channel (209-65.03)LF214$6.00$40.00$125.00$6.00$45.00
23Mineral aggregate, type A base, grading D (303-01)TON2,408$40.00$44.00$40.00$40.00$48.00
24Mineral aggregate (size 57) (303-10.01)TON51$57.00$55.00$70.00$57.00$75.00
25Mineral aggregate (size 57) (303-10.04)TON579$60.00$62.00$70.00$86.00$55.00
26Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON381$175.00$175.00$200.00$175.00$210.00
27Bituminous material for prime coat (PC) (402-01)TON5$1,940.00$1,940.00$2,000.00$1,940.00$2,300.00
28Aggregate for cover material (PC) (402-02)TON18$75.00$75.00$80.00$75.00$85.00
29Bituminous material for tack coat (TC) (403-01)TON2$1,940.00$1,940.00$2,000.00$1,940.00$2,300.00
30Saw cutting asphalt pavement (407-20.05)LF68$7.00$11.00$10.00$7.00$12.00
31Acs mix(PG64-22) grading D (411-01.10)TON226$230.00$230.00$250.00$230.00$260.00
32Sawing concrete pavement (full depth) (502-04.01)LF24$14.00$40.00$45.00$14.00$11.00
3318" concrete pipe culvert (class III) (607-03.02)LF45$103.00$120.00$60.00$103.00$100.00
3448" concrete pipe culvert (class III) (607-09.02)LF54$243.00$240.00$170.00$243.00$300.00
3518" pipe culvert (side drain) (607-39.02)LF47$36.00$120.00$60.00$36.00$100.00
36Class A concrete (pipe endwalls) (611-07.01)CY8$2,300.00$3,000.00$1,500.00$1,975.00$800.00
37Steel bar reinforcement (pipe endwalls) (611-07.02)LB288$8.00$10.00$8.00$6.85$1.85
3818IN endwall (side drain) (611-07.31)EACH2$4,300.00$4,000.00$7,500.00$4,300.00$6,000.00
3924IN endwall (side drain) (611-07.32)EACH2$6,000.00$5,500.00$7,500.00$6,000.00$6,400.00
4048IN endwall (cross drain) 4:1 (611-07.70)EACH1$16,000$15,500$10,000$12,960$11,000
41Catch basins, type 38, 0' - 4' depth (611-38.01)EACH1$6,600.00$12,000$6,500.00$6,600.00$6,000.00
4218" temporary drainage pipe (621-03.02)LF90$28.00$100.00$100.00$28.00$25.00
43Concrete driveway (701-02)SF552$11.00$35.00$20.00$18.00$12.25
44W beam GR (type 2) MASH TL-3 (705-06.01)LF25$30.00$30.00$65.00$54.00$30.00
45Thrie beam bridge transition MASH TL-2 (705-06.26)EACH4$2,000.00$2,000.00$3,500.00$2,950.00$2,200.00
46GR terminal (energy absorbing) MASH TL-2 (705-06.30)EACH4$3,300.00$3,300.00$3,600.00$3,200.00$3,600.00
47Guardrail removed (706-01)LF151$1.00$6.00$2.00$3.60$1.00
48High-visibility construction fence (707-08.11)LF1,119$2.00$2.00$4.50$4.00$2.00
49Machined rip-rap (class A-3) (709-05.05)TON251$60.00$56.00$60.00$60.00$65.00
50Machined rip-rap (class A-1) (709-05.06)TON258$60.00$56.00$60.00$60.00$80.00
51Machined rip-rap (class B) (709-05.08)TON664$55.00$56.00$65.00$60.00$85.00
52Traffic control (712-01)LS1$4,350.00$25,000$30,000$5,000.00$2,000.00
53Flexible drums (channelizing) (712-04.01)EACH16$30.00$30.00$35.00$30.00$50.00
54Warning lights (type A) (712-05.01)EACH16$10.00$10.00$15.00$10.00$10.00
55Warning lights (type C) (712-05.03)EACH58$10.00$10.00$15.00$10.00$10.00
56Signs (construction) (712-06)SF214$7.25$7.25$9.00$7.25$9.00
57Temporary barricades (type III) (712-07.03)LF204$15.00$15.00$15.00$15.00$17.00
58Sign post delineation enhancement (713-02.21)LF7$5.00$5.00$6.00$5.00$6.00
59P post slip base (713-11.21)EACH1$450.00$450.00$550.00$450.00$500.00
60Remove sign, support & footing (713-15.36)EACH8$25.00$25.00$30.00$25.00$30.00
61Changeable message sign unit (713-16.01)EACH2$5,500.00$5,500.00$6,500.00$5,500.00$7,000.00
62Signs (D3-1 L and N ST, D3-1 salem ST, R1-1 stop) (713-16.20)EACH1$350.00$350.00$400.00$350.00$400.00
63Signs (project information, I2-5) (713-16.21)EACH2$950.00$950.00$1,050.00$950.00$1,000.00
64Plastic pavement marking (stop line) (716-02.05)LF18$50.00$50.00$60.00$50.00$55.00
65Painted pavement marking (4" line) (716-05.01)LM0.92$5,000.00$5,000.00$6,000.00$5,000.00$5,300.00
66Mobilization (717-01)LS1$75,000$160,000$130,000$245,000$250,000
67Geogrid reinforcement type 2 (740-07.04)SY681$6.00$15.00$5.00$12.00$8.00
68Geotextile (type III)(erosion control) (740-10.03)SY1,059$2.75$5.00$8.00$5.00$5.00
69Geotextile (type IV)(stabilization) (740-10.04)SY327$5.00$5.00$5.00$5.00$6.00
70Temporary sediment tube 20IN (740-11.04)LF840$4.00$4.00$8.00$6.00$8.00
71Temporary seeding (with mulch) (801-01.07)UNIT74$35.00$35.00$100.00$75.00$40.00
72Water (seeding & sodding) (801-03)MG90$30.00$30.00$25.00$65.00$200.00
73Acer negundo (box elder 2-5FT CNTNR GRWN) (802-11.01)EACH9$90.00$90.00$75.00$40.00$42.00
74Betula nigra (river birch 2-5FT CNTNR GRWN) (802-11.07)EACH9$120.00$120.00$75.00$40.00$42.00
75Fraxinus pennsylvanica (green ash 2-5FT CNTNR GRWN) (802-11.16)EACH9$75.00$75.00$75.00$40.00$42.00
76Platanus occidentalis (sycamore 2-5FT CNTNR GRWN) (802-11.26)EACH9$90.00$90.00$75.00$40.00$42.00
77Sodding (new sod) (803-01)SY9,813$3.40$3.40$8.00$5.50$8.50
78Removal of asbestos (exist. BR. I.D. no. 27015850001) (202-01.05)LS1$10,000$5,000.00$20,000$34,000$32,000
79Removal of structures (exist. BR. I.D. no. 27015850001) (202-04.01)LS1$20,000$22,000$75,000$42,500$95,000
80Dry excavation (bridges) (204-02.01)CY134$29.00$20.00$15.00$35.00$25.00
81Granular backfill (bridges) (303-01.02)TON28$78.00$80.00$50.00$75.00$85.00
82Epoxy coated reinforcing steel (604-02.03)LB23,250$2.00$1.72$2.00$2.25$2.00
83Class A concrete (bridges) (604-03.01)CY91$1,100.00$1,070.00$1,500.00$1,295.00$1,350.00
84Steel bar reinforcement (bridges) (604-03.02)LB9,159$1.75$1.66$2.00$2.20$1.80
85Pavement @ bridge ends (604-03.04)SY198$375.00$335.00$350.00$485.00$480.00
86Class D concrete (bridge deck) (604-03.09)CY97$1,450.00$1,180.00$1,500.00$1,550.00$1,425.00
87Applied texture finish (new structures) (604-04.01)SY307$17.00$16.99$20.00$18.00$20.00
88Test piles (precast concrete, size 1) (606-09.01)LF125$120.00$120.00$130.00$186.00$250.00
89Loading test (precast concrete, size 1) (606-09.02)EACH1$6,000.00$8,000.00$7,500.00$14,000$10,500
90Precast concrete piles (size 1) (606-09.03)LF840$79.00$108.00$100.00$160.00$95.00
91Pile anchorage system (seismic) (606-12.01)EACH14$275.00$344.00$200.00$250.00$500.00
92Prestressed concrete box beam (36" X 36") (615-02.17)LF360$450.00$457.00$400.00$590.00$550.00
93Concrete parapet with structural tubing (620-05)LF204$325.00$392.00$400.00$495.00$300.00
946" perforated pipe with vertical drain system (710-09.01)LF120$40.00$26.00$38.00$9.00$80.00
956" pipe underdrain (710-09.02)LF60$10.00$15.00$50.00$15.00$36.00
TDOT contract CNZ307: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of December 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy