TDOT contract CNZ239 bid tabulation

The resurfacing on u.s. 70 (u.s. 79, s.r. 1) from near big muddy creek canal (l.m. 6.28) to s.r. 19 (l.m. 14.84), including thin epoxy overlay on bridges. Let by Tennessee DOT on July 25, 2025, Haywood County. 1 bid received; low bid $3,305,733 by Ford Construction Company.

Owner
Tennessee DOT
Letting
25 JUL 2025
Pay items
29
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Ford Construction Company$3,305,733Low
TDOT contract CNZ239: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Ford Construction Company
1Removal of asphalt pavement (202-03.01)SY5,494$18.50
2Water (203-06)MG17$1.00
3Brooming & degrassing shoulders (208-01.05)LM16.10$973.00
4Mineral aggregate, type B base, grading (C or D) (303-02)TON2,256$66.50
5Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01)TON92$255.40
6Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08)TON599$232.00
7Trackless tack coat (403-02.01)TON62$900.00
8Acs mix(PG64-22) grading D (411-01.10)TON9,569$152.00
9Longitudinal joint sealant (411-01.21)LM9$3,300.00
10Scoring for rumble stripe (non-continuous) (4IN width) (411-12.04)LM12.90$1,254.00
11Cold planing bituminous pavement (415-01.01)TON8,984$34.00
12Guardrail transition 27IN to 31IN (705-02.10)EACH7$165.00
13Tangent energy absorbing term MASH TL-3 (705-06.20)EACH7$3,850.00
14Guardrail removed (706-01)LF350$5.50
15Traffic control (712-01)LS1$58,000
16Flexible drums (channelizing) (712-04.01)EACH104$1.10
17Warning lights (type A) (712-05.01)EACH45$1.10
18Warning lights (type C) (712-05.03)EACH32$1.10
19Signs (construction) (712-06)SF1,290$7.00
20Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21)EACH565$52.80
21Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22)EACH50$52.80
22Removal of snowplowable reflective marker (716-01.30)EACH345$12.40
23Plastic pavement marking(channelization striping) (716-02.04)SY33$44.00
24Plastic pavement marking (transverse shoulder) (716-04.04)LF186$18.70
25Painted pavement marking (6" line) (716-05.20)LM25.30$2,750.00
26Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02)LM25.30$8,360.00
27Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05)LF150$4.40
28Mobilization (717-01)LS1$151,000
29Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01)SY9,836$45.00
TDOT contract CNZ239: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of July 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy