TDOT contract CNZ334 bid tabulation
The resurfacing on u.s. 70 (s.r. 1) from near s.r. 186 (l.m. 13.83) to near mobile street (l.m. 16.05) (includes s. church street and s.r. 1 wb), including bridge expansion joint repairs. Let by Tennessee DOT on December 5, 2025, Madison County. 3 bids received; low bid $3,088,739 by Delta Contracting Company, LLC.
- Owner
- Tennessee DOT
- Letting
- 05 DEC 2025
- Pay items
- 56
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Delta Contracting Company, LLC | $3,088,739 | Low |
| 2 | Ford Construction Company | $3,503,148 | +13% |
| 3 | Jones Bros. Contractors, LLC | $3,929,833 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Delta Contracting Company, LLC | 2. Ford Construction Company | 3. Jones Bros. Contractors, LLC |
|---|---|---|---|---|---|---|
| 1 | Removal of asphalt pavement (202-03.01) | SY | 8,965 | $11.00 | $14.15 | $11.70 |
| 2 | Water (203-06) | MG | 18 | $0.01 | $1.00 | $6.00 |
| 3 | Brooming & degrassing shoulders (208-01.05) | LM | 9.20 | $350.00 | $1,250.00 | $2,434.00 |
| 4 | Mineral aggregate, type B base, grading (C or D) (303-02) | TON | 1,899 | $9.50 | $50.00 | $61.00 |
| 5 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01) | TON | 586 | $145.00 | $135.00 | $178.00 |
| 6 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08) | TON | 870 | $110.00 | $158.00 | $169.00 |
| 7 | Trackless tack coat (403-02.01) | TON | 70 | $250.00 | $950.00 | $973.00 |
| 8 | Longitudinal joint sealant (411-01.21) | LM | 5.10 | $2,900.00 | $2,900.00 | $2,900.00 |
| 9 | Acs mix(PG70-22) grading D (411-02.10) | TON | 12,629 | $133.50 | $151.00 | $151.00 |
| 10 | Scoring shoulders (non-continuous) (16IN width) (411-12.02) | LM | 3.24 | $3,250.00 | $2,750.00 | $2,750.00 |
| 11 | Cold planing bituminous pavement (415-01.01) | TON | 12,313 | $18.50 | $25.00 | $29.20 |
| 12 | Gray iron castings (catchbasin) (611-03.04) | LB | 6,750 | $7.50 | $3.75 | $4.00 |
| 13 | Adjustment of existing catchbasin (611-09.01) | EACH | 27 | $2,200.00 | $2,355.00 | $3,410.00 |
| 14 | Guardrail transition 27IN to 31IN (705-02.10) | EACH | 2 | $188.00 | $200.00 | $200.00 |
| 15 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 2 | $3,923.00 | $3,400.00 | $3,400.00 |
| 16 | Guardrail removed (706-01) | LF | 100 | $2.00 | $2.00 | $2.00 |
| 17 | Traffic control (712-01) | LS | 1 | $52,000 | $30,000 | $130,000 |
| 18 | Flexible drums (channelizing) (712-04.01) | EACH | 385 | $25.00 | $28.00 | $28.00 |
| 19 | Warning lights (type A) (712-05.01) | EACH | 187 | $1.00 | $1.00 | $1.00 |
| 20 | Warning lights (type C) (712-05.03) | EACH | 193 | $1.00 | $1.00 | $1.00 |
| 21 | Signs (construction) (712-06) | SF | 1,654 | $6.25 | $6.80 | $6.80 |
| 22 | Arrow board (type C) (712-08.03) | EACH | 4 | $950.00 | $800.00 | $800.00 |
| 23 | Mobile message sign unit W/attenuator (712-08.10) | HR | 48 | $100.00 | $202.00 | $101.00 |
| 24 | Sign post delineation enhancement (713-02.21) | LF | 12 | $5.00 | $6.15 | $6.15 |
| 25 | Removal of signs, posts and footings (713-15) | LS | 1 | $50.00 | $100.00 | $100.00 |
| 26 | Railroad advance warning sign and support (713-16.09) | EACH | 2 | $250.00 | $500.00 | $500.00 |
| 27 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 100 | $45.00 | $45.00 | $45.00 |
| 28 | Snowplowable raised pavment markers (mono-dir)(1 color) (716-01.22) | EACH | 1,000 | $45.00 | $45.00 | $45.00 |
| 29 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 375 | $45.00 | $45.00 | $45.00 |
| 30 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 235 | $35.00 | $35.00 | $35.00 |
| 31 | Plastic pavement marking (stop line) (716-02.05) | LF | 1,012 | $25.00 | $25.00 | $25.00 |
| 32 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 52 | $220.00 | $220.00 | $220.00 |
| 33 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 350 | $4.00 | $4.00 | $4.00 |
| 34 | Plastic pavement marking (longitudinal cross-walk) (716-02.09) | LF | 1,356 | $51.00 | $51.00 | $51.00 |
| 35 | Plastic pavement marking (8IN line) (716-02.12) | LM | 0.91 | $21,120 | $21,120 | $21,120 |
| 36 | Plastic word pavement marking (only) (716-03.01) | EACH | 6 | $250.00 | $250.00 | $250.00 |
| 37 | Plastic word pavement marking (RXR) (716-03.02) | EACH | 4 | $1,000.00 | $1,000.00 | $1,000.00 |
| 38 | Plastic word pavement marking (signal ahead) (716-03.06) | EACH | 4 | $1,000.00 | $1,000.00 | $1,000.00 |
| 39 | Plastic pavement marking (straight-turn arrow) (716-04.01) | EACH | 13 | $440.00 | $440.00 | $440.00 |
| 40 | Plastic pavement marking(double turning arrow) (716-04.02) | EACH | 1 | $440.00 | $440.00 | $440.00 |
| 41 | Plastic pavement marking (transverse shoulder) (716-04.04) | LF | 1,050 | $17.00 | $17.00 | $17.00 |
| 42 | Plastic pavement marking (straight arrow) (716-04.05) | EACH | 13 | $220.00 | $220.00 | $220.00 |
| 43 | Plastic pavement marking (yield line) (716-04.12) | SF | 250 | $38.00 | $38.00 | $38.00 |
| 44 | Painted pavement marking (stop line) (716-05.05) | LF | 1,012 | $18.00 | $18.00 | $18.00 |
| 45 | Painted pavement marking (parking line) (716-05.08) | LF | 1,350 | $4.25 | $4.25 | $4.25 |
| 46 | Painted pavement marking (6" line) (716-05.20) | LM | 16.10 | $2,200.00 | $2,200.00 | $2,200.00 |
| 47 | Painted pavement marking(4"dotted line) (716-05.21) | LF | 1,130 | $2.00 | $2.00 | $2.00 |
| 48 | Painted pavement markings(8" line) (716-05.50) | LF | 290 | $2.00 | $2.00 | $2.00 |
| 49 | Prfrmed PLSTC PVMNT MRKNG (US SHLD) (716-10.52) | EACH | 8 | $2,500.00 | $2,500.00 | $2,500.00 |
| 50 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 16.10 | $7,800.00 | $7,800.00 | $7,800.00 |
| 51 | Mobilization (717-01) | LS | 1 | $92,000 | $30,000 | $250,000 |
| 52 | Conduit 1" diameter (PVC schedule 40) (730-12.01) | LF | 50 | $25.00 | $10.00 | $10.00 |
| 53 | Shielded detector cable (730-14.01) | LF | 50 | $3.50 | $3.00 | $3.00 |
| 54 | Saw slot (730-14.02) | LF | 5,304 | $6.00 | $6.00 | $6.00 |
| 55 | Loop wire (730-14.03) | LF | 10,608 | $1.00 | $1.00 | $1.00 |
| 56 | Expansion joint repairs (604-10.44) | LF | 104 | $394.00 | $554.00 | $394.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of December 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.