Delta Contracting Company, LLC: TDOT bid record
Delta Contracting Company, LLC submitted 80 bids on Tennessee DOT contracts in the data, from 09 FEB 2018 to 02 OCT 2026, and was the low bidder on 59 of them (74%). When it was not low, its total sat a median +5.0% above the low bid.
- Owner
- Tennessee DOT
- Low bid volume
- $216,643,530
- Latest bid
- 02 OCT 2026
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 8 | 7 | 88% |
| 2020 | 3 | 2 | 67% |
| 2023 | 2 | 0 | 0% |
| 2024 | 25 | 17 | 68% |
| 2025 | 22 | 18 | 82% |
| 2026 | 20 | 15 | 75% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Hardin County | 8 | 8 | 100% |
| Henderson County | 6 | 5 | 83% |
| Benton County | 5 | 4 | 80% |
| Madison County | 5 | 2 | 40% |
| Gibson County | 5 | 4 | 80% |
| Decatur County | 4 | 4 | 100% |
| Carroll County | 4 | 3 | 75% |
| Henry County | 4 | 4 | 100% |
| Wayne County | 3 | 2 | 67% |
| Haywood County | 3 | 2 | 67% |
| Henderson | 3 | 3 | 100% |
| Madison | 3 | 2 | 67% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Signs (construction) | 712-06 | SF | 69 | 60 (87%) | $7.00 | $8.00 |
| Enhanced flatline thermo PVMT MRKNG (6IN line) | 716-12.02 | LM | 64 | 55 (86%) | $7,400.00 | $7,425.00 |
| Plastic pavement marking (stop line) | 716-02.05 | LF | 59 | 52 (88%) | $22.00 | $17.30 |
| Painted pavement marking (6" line) | 716-05.20 | LM | 55 | 46 (84%) | $1,800.00 | $1,400.00 |
| Trackless tack coat | 403-02.01 | TON | 47 | 43 (91%) | $350.00 | $950.00 |
| Plastic pavement marking(channelization striping) | 716-02.04 | SY | 47 | 39 (83%) | $35.00 | $29.75 |
| Snowplowable raised pavement markers (BI-dir) (1 color) | 716-01.21 | EACH | 42 | 38 (90%) | $37.00 | $40.48 |
| Plastic pavement marking (turn lane arrow) | 716-02.06 | EACH | 41 | 38 (93%) | $210.00 | $200.68 |
| Cold planing bituminous pavement | 415-01.01 | TON | 53 | 37 (70%) | $30.00 | $34.00 |
| Tangent energy absorbing term MASH TL-3 | 705-06.20 | EACH | 43 | 36 (84%) | $3,400.00 | $3,468.00 |
| Brooming & degrassing shoulders | 208-01.05 | LM | 50 | 35 (70%) | $1,000.00 | $1,500.00 |
| Guardrail removed | 706-01 | LF | 39 | 32 (82%) | $4.00 | $2.12 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Jones Bros. Contractors, LLC | 45 | 4 of 45 |
| Ford Construction Company | 21 | 8 of 21 |
| Volunteer Paving, LLC | 15 | 2 of 15 |
| Eubank Asphalt Paving & Sealing, LLC | 4 | 3 of 4 |
| Volunteer Bridge Construction, Inc. | 4 | 0 of 4 |
| Murray Paving, Inc. | 4 | 1 of 4 |
| Hal Coffey Contracting LLC | 3 | 2 of 3 |
| VuCon, LLC | 3 | 0 of 3 |
| Vaughn Contractors, Inc. | 3 | 2 of 3 |
| Asphalt Paving Systems, Inc. | 3 | 0 of 3 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 02 OCT 2026 | CN264057 | Hardin County | The grading, drainage, and paving on a s.i.a. route serving packaging corporation of america, including construction of turn lanes on s.r. 5 | 1 of 5 | $2,998,959 | Low, 24% under the second |
| 02 OCT 2026 | CN264061 | Henry And Stewart Counties | The resurfacing on u.s. 79 (s.r. 76) from west antioch road (l.m. 25.45) in henry county to the east end of the tennessee river bridge (l.m. | 1 of 3 | $2,789,225 | Low, 23% under the second |
| 14 AUG 2026 | CN264052 | Tipton County | The miscellaneous safety improvements on u.s. 51 (s.r. 3) at the intersection of rialto/leighs chapel road (l.m. 20.97 - l.m. 21.50) | 1 of 2 | $2,806,436 | Low, 15% under the second |
| 26 JUN 2026 | CN264041 | Chester County | The construction of turn lanes on s.r. 100 at the intersection of s.r. 225 (l.m. 7.78), including grading, drainage, and paving | 1 of 2 | $1,049,728 | Low, 20% under the second |
| 26 JUN 2026 | CN264045 | Haywood County | The resurfacing on u.s. 70 (s.r. 1) from u.s. 70a (u.s. 79, s.r. 76) (l.m. 17.31) to the madison county line (l.m. 28.09), including thin ep | 1 of 2 | $6,469,488 | Low, 5.0% under the second |
| 26 JUN 2026 | CN264047 | Henderson County | The resurfacing on s.r. 22 from near taylor bailey road (l.m. 9.29) to jane lane (l.m. 12.70), including thin epoxy overlay on the bridge ov | 1 of 2 | $3,743,211 | Low, 32% under the second |
| 26 JUN 2026 | CN264050 | Henry County | The resurfacing on s.r. 54 from old town creek (l.m. 2.51) to near s.r. 218 (l.m. 8.93), including thin epoxy overlay on the bridge over old | 1 of 2 | $2,498,680 | Low, 13% under the second |
| 26 JUN 2026 | CN264042 | Tipton County | The grading, drainage, and paving on u.s. 51 (s.r. 3) from north of myron creek (l.m. 7.00) to south of old hwy 51 south (l.m. 8.00) | 2 of 3 | $2,107,179 | +4.0% |
| 26 JUN 2026 | CN264904 | Gibson County | The resurfacing on s.r. 43 from near cades atwood road (l.m. 14.18) to the weakley county line (l.m. 24.26) | 1 of 2 | $3,986,909 | Low, 31% under the second |
| 08 MAY 2026 | CN264033 | Gibson County | The miscellaneous safety improvements on u.s. 45w (s.r. 5) at the intersection of broad street (l.m. 22.85) in dyer, including grading, drai | 1 of 2 | $1,547,873 | Low, 48% under the second |
| 08 MAY 2026 | CN264039 | Henderson County | The ramp improvements on i-40 (exit 101) at the s.r. 104 interchange (l.m. 5.73), including grading, drainage, lighting, and paving | 2 of 3 | $7,311,285 | 0.0% |
| 08 MAY 2026 | CN264036 | Henry County | The grading, drainage, construction of bridges, and paving on s.r. 54 from near howard road (l.m. 22.07) to the kentucky state line (l.m. 24 | 1 of 4 | $38,326,692 | Low, 10% under the second |
| 20 MAR 2026 | CN264016 | Hardin County | The miscellaneous safety improvements including resurfacing on s.r. 69 from near bingham creek (l.m. 5.00) to the decatur county line (l.m. | 1 of 2 | $917,814 | Low, 35% under the second |
| 20 MAR 2026 | CN264028 | Hardin County | The resurfacing on s.r. 142 from the mcnairy county line (l.m. 0.00) to s.r. 57 (l.m. 6.35) and on s.r. 69 from u.s. 64 (s.r. 15) (l.m. 22.6 | 1 of 3 | $4,629,599 | Low, 47% under the second |
| 20 MAR 2026 | CN264018 | Hardin County | The resurfacing on s.r. 203 from burnt church road (l.m. 7.50) to near lonesome pine road (l.m. 11.85) | 1 of 1 | $1,419,511 | Low |
| 20 MAR 2026 | CN264024 | Haywood County | The resurfacing on s.r. 76 from north washington avenue (l.m. 13.90) to alsey williams road (l.m. 18.39), including bridge expansion joint r | 1 of 2 | $1,946,837 | Low, 23% under the second |
| 20 MAR 2026 | CN263035 | Wayne County | The resurfacing on s.r. 114 from u.s. 64 (s.r. 15) (l.m. 0.00) to near the hardin county line (l.m. 7.89) | 1 of 1 | $2,789,597 | Low |
| 06 FEB 2026 | CN264007 | Gibson County | The resurfacing on s.r. 105 from shiloh road (l.m. 23.65) to near wayne lloyd road (l.m. 28.51), including thin epoxy overlay on bridges | 2 of 2 | $1,314,520 | +2.0% |
| 06 FEB 2026 | CN264013 | Haywood County | The resurfacing (microsurface or thin mix overlay) on s.r. 54 from near thomas street (l.m. 13.62) to the crockett county line (l.m. 24.63), | 2 of 3 | $2,559,296 | +6.0% |
| 06 FEB 2026 | CN263018 | Perry County | The resurfacing on s.r. 128 from holder cemetery road (l.m. 6.05) to s.r. 13 (l.m. 12.12), including thin epoxy overlay on the bridge at l.m | 2 of 3 | $1,194,533 | +4.0% |
| 05 DEC 2025 | CNZ331 | Benton County | The resurfacing with cold in-place recycling on s.r. 69 from james walker road (l.m. 10.92) to near hospital drive (l.m. 14.80) | 1 of 1 | $1,738,811 | Low |
| 05 DEC 2025 | CNZ333 | Carroll County | 364(2),09s364-f3-002,09s364-f8-002,09s364-m3-002 the resurfacing with hot in-place recycling on s.r. 22 from near s.r. 77 (l.m. 14.58) to s. | 1 of 2 | $6,689,310 | Low, 18% under the second |
| 05 DEC 2025 | CNZ326 | Crockett And Gibson Counties | The miscellaneous safety improvements on various local roads | 1 of 1 | $1,179,651 | Low |
| 05 DEC 2025 | CNZ334 | Madison County | The resurfacing on u.s. 70 (s.r. 1) from near s.r. 186 (l.m. 13.83) to near mobile street (l.m. 16.05) (includes s. church street and s.r. 1 | 1 of 3 | $3,088,739 | Low, 13% under the second |
| 25 JUL 2025 | CNZ236 | Decatur County | The resurfacing (microsurface or thin mix overlay) on s.r. 100 from the henderson county line (l.m. 0.00) to near tillman road/shady hill ro | 1 of 2 | $984,627 | Low, 17% under the second |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.