TDOT contract CN264039 bid tabulation
The ramp improvements on i-40 (exit 101) at the s.r. 104 interchange (l.m. 5.73), including grading, drainage, lighting, and paving. Let by Tennessee DOT on May 8, 2026, Henderson County. 3 bids received; low bid $7,297,325 by Jones Bros. Contractors, LLC.
- Owner
- Tennessee DOT
- Letting
- 08 MAY 2026
- Pay items
- 145
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Jones Bros. Contractors, LLC | $7,297,325 | Low |
| 2 | Delta Contracting Company, LLC | $7,311,285 | 0.0% |
| 3 | Precise Concrete Works, LLC | $10,796,053 | +48% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Jones Bros. Contractors, LLC | 2. Delta Contracting Company, LLC | 3. Precise Concrete Works, LLC |
|---|---|---|---|---|---|---|
| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $50,000 | $95,000 | $103,307 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $18,000 | $160,000 | $211,005 |
| 3 | Removal of structures and obstructions (202-01) | LS | 1 | $7,000.00 | $10,000 | $111,722 |
| 4 | Removal of asphalt pavement (202-03.01) | SY | 1,851 | $9.00 | $15.00 | $18.50 |
| 5 | Road & drainage excavation (unclassified) (203-01) | CY | 28,622 | $19.00 | $19.00 | $22.87 |
| 6 | Borrow excavation (select material) (203-03.01) | CY | 3,472 | $43.00 | $15.00 | $37.78 |
| 7 | Placing and spreading topsoil (203-04) | CY | 4,943.59 | $3.00 | $18.50 | $26.75 |
| 8 | Undercutting (203-05) | CY | 3,472 | $19.00 | $22.50 | $29.00 |
| 9 | Water (203-06) | MG | 265 | $25.00 | $50.00 | $34.00 |
| 10 | Channel substrate (203-20.01) | CY | 19 | $52.50 | $24.00 | $180.00 |
| 11 | Backfill material (flowable fill) (204-08.01) | CY | 25 | $400.00 | $400.00 | $432.00 |
| 12 | Brooming & degrassing shoulders (208-01.05) | LM | 5 | $1,800.00 | $1,050.00 | $4,323.00 |
| 13 | Protected area marker (white with decal) (209-03.99) | EACH | 2 | $350.00 | $350.00 | $159.00 |
| 14 | Sediment removal (209-05) | CY | 1,565 | $17.00 | $14.50 | $18.00 |
| 15 | Temporary silt fence (with backing) (209-08.02) | LF | 2,511 | $5.50 | $3.85 | $5.98 |
| 16 | Temporary silt fence (without backing) (209-08.03) | LF | 4,518 | $2.00 | $1.95 | $4.43 |
| 17 | Rock check dam (209-08.07) | EACH | 45 | $900.00 | $650.00 | $890.00 |
| 18 | Enhanced rock check dam (209-08.08) | EACH | 5 | $1,400.00 | $1,600.00 | $1,450.00 |
| 19 | Sandbags (209-09.01) | BAG | 6,000 | $3.00 | $2.00 | $4.60 |
| 20 | Polyethylene sheeting (6 mil. minimum) (209-20.03) | SY | 32 | $35.00 | $0.85 | $6.00 |
| 21 | Catch basin protection (type A) (209-40.30) | EACH | 4 | $450.00 | $500.00 | $420.00 |
| 22 | Mineral aggregate, type A base, grading D (303-01) | TON | 20,453 | $35.00 | $47.50 | $46.00 |
| 23 | Mineral aggregate (size 57) (303-10.01) | TON | 13 | $55.00 | $100.00 | $57.00 |
| 24 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 86 | $163.00 | $165.00 | $162.02 |
| 25 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 53 | $125.00 | $124.00 | $164.70 |
| 26 | Asp. conc. mix(PG64-22) (BPMB-HM) GR. A-S (307-01.20) | TON | 85 | $157.25 | $130.00 | $171.39 |
| 27 | Asp. conc. mix(PG76-22) (BPMB-HM) GR. A-S (307-01.22) | TON | 851 | $157.25 | $130.00 | $190.14 |
| 28 | Asphalt concrete mix (PG76-22) (BPMB-HM) grading A (307-03.01) | TON | 885 | $163.00 | $165.00 | $198.17 |
| 29 | Asphalt concrete mix (PG76-22) (BPMB-HM) grading B-M2 (307-03.08) | TON | 3,070 | $125.00 | $124.00 | $214.00 |
| 30 | Asphalt concrete mix (PG76-22) grading CM (307-03.12) | TON | 3,595 | $124.00 | $123.00 | $223.00 |
| 31 | Bituminous material for prime coat (PC) (402-01) | TON | 32 | $1,000.00 | $200.00 | $1,274.00 |
| 32 | Aggregate for cover material (PC) (402-02) | TON | 1,043 | $20.00 | $5.00 | $70.20 |
| 33 | Bituminous material for tack coat (TC) (403-01) | TON | 23 | $775.00 | $200.00 | $1,430.00 |
| 34 | Saw cutting asphalt pavement (407-20.05) | LF | 1,805 | $4.00 | $6.00 | $6.50 |
| 35 | Acs mix(PG76-22) grading D (411-03.10) | TON | 1,582 | $142.00 | $168.00 | $206.21 |
| 36 | Acs mix (PG76-22) ogfc (411-03.23) | TON | 2,391 | $176.50 | $185.00 | $230.31 |
| 37 | Scoring shoulders (continuous) (16IN width) (411-12.01) | LM | 5 | $2,550.00 | $1,625.00 | $5,623.80 |
| 38 | Cold planing bituminous pavement (415-01.01) | TON | 5,563 | $36.00 | $29.25 | $25.35 |
| 39 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 73 | $147.00 | $73.00 | $120.80 |
| 40 | 24" concrete pipe culvert (class III) (607-05.02) | LF | 73 | $730.00 | $94.00 | $163.30 |
| 41 | 60" concrete pipe culvert (class II) (607-11.02) | LF | 40 | $936.00 | $325.00 | $442.80 |
| 42 | Sapl type 1 grout (pipe/culvert repair) (607-25.01) | CF | 283 | $150.00 | $150.00 | $193.20 |
| 43 | Spray applied pipe liner (sapl) (607-25.02) | CF | 212 | $250.00 | $250.00 | $315.60 |
| 44 | Junction box, type 1 (611-02.10) | EACH | 1 | $5,975.00 | $4,050.00 | $7,475.00 |
| 45 | Class A concrete (pipe endwalls) (611-07.01) | CY | 18 | $750.00 | $1,985.00 | $1,322.50 |
| 46 | Steel bar reinforcement (pipe endwalls) (611-07.02) | LB | 856 | $5.00 | $5.50 | $2.60 |
| 47 | 24IN endwall (cross drain) 3:1 (611-07.57) | EACH | 2 | $3,200.00 | $3,806.84 | $4,025.00 |
| 48 | 18IN endwall (median drain) (611-07.73) | EACH | 1 | $2,200.00 | $3,000.00 | $2,300.00 |
| 49 | 36" temporary drainage pipe (621-03.05) | LF | 140 | $80.00 | $80.00 | $230.00 |
| 50 | Guardrail transition 27IN to 31IN (705-02.10) | EACH | 2 | $500.00 | $500.00 | $1,897.50 |
| 51 | W beam GR (type 2) MASH TL-3 (705-06.01) | LF | 2,253 | $30.00 | $30.00 | $35.70 |
| 52 | GR terminaltrailing end (type 13) MASH TL-3 (705-06.10) | EACH | 2 | $2,000.00 | $2,000.00 | $2,127.50 |
| 53 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 6 | $3,500.00 | $3,500.00 | $4,830.00 |
| 54 | Thrie beam bridge transition MASH TL-3 (705-06.25) | EACH | 2 | $2,500.00 | $2,500.00 | $4,945.00 |
| 55 | Cable barrier (MASH TL-3) (705-06.40) | LF | 3,782.15 | $42.00 | $42.00 | $46.80 |
| 56 | Cable barrier anchor (MASH TL-3) (705-06.41) | EACH | 4 | $4,500.00 | $4,500.00 | $4,306.80 |
| 57 | Guardrail removed (706-01) | LF | 1,782 | $1.00 | $1.00 | $5.20 |
| 58 | Cable barrier terminal (removal) (706-80.18) | EACH | 4 | $500.00 | $500.00 | $799.80 |
| 59 | Cable barrier (removal) (706-80.19) | LF | 3,291 | $15.00 | $15.00 | $2.70 |
| 60 | Stock fence (707-03.01) | LF | 1,724 | $12.00 | $8.50 | $18.40 |
| 61 | Removal of fence (C.A.) (707-06.01) | LF | 1,647 | $1.75 | $6.00 | $5.80 |
| 62 | High-visibility construction fence (707-08.11) | LF | 2,961 | $3.00 | $1.75 | $6.30 |
| 63 | Markers (concrete R.O.W. posts) (708-02.01) | EACH | 16 | $425.00 | $343.00 | $373.80 |
| 64 | Machined rip-rap (class A-3) (709-05.05) | TON | 200 | $70.75 | $55.00 | $82.80 |
| 65 | Machined rip-rap (class A-1) (709-05.06) | TON | 68 | $69.00 | $56.00 | $78.20 |
| 66 | Machined rip-rap (class C) (709-05.09) | TON | 154 | $72.00 | $55.00 | $108.10 |
| 67 | Aggregate underdrains (with pipe) (710-02) | LF | 4,444.10 | $13.00 | $13.50 | $21.90 |
| 68 | Lateral underdrain (710-05) | LF | 1,472 | $12.50 | $12.50 | $18.40 |
| 69 | Lateral underdrain endwall (3:1) (710-06.12) | EACH | 7 | $1,200.00 | $1,200.00 | $1,380.00 |
| 70 | Lateral underdrain endwall (6:1) (710-06.15) | EACH | 19 | $1,200.00 | $1,200.00 | $1,782.50 |
| 71 | 51IN single slope concrete barrier wall (711-05.71) | LF | 110 | $400.00 | $400.00 | $676.80 |
| 72 | Traffic control (712-01) | LS | 1 | $50,000 | $137,000 | $430,675 |
| 73 | Interconnected portable barrier rail (712-02.02) | LF | 5,000 | $90.00 | $46.00 | $59.10 |
| 74 | Temporary work zone crash cushion (MASH TL-3) (712-02.60) | EACH | 9 | $6,226.00 | $4,065.00 | $5,906.40 |
| 75 | Flexible drums (channelizing) (712-04.01) | EACH | 290 | $29.00 | $45.00 | $67.70 |
| 76 | Warning lights (type A) (712-05.01) | EACH | 24 | $23.00 | $25.00 | $43.50 |
| 77 | Signs (construction) (712-06) | SF | 1,047.86 | $7.00 | $7.35 | $17.80 |
| 78 | Arrow board (type C) (712-08.03) | EACH | 2 | $1,100.00 | $1,250.00 | $2,276.40 |
| 79 | Digital speed limit sign assembly (712-08.09) | EACH | 2 | $4,500.00 | $4,500.00 | $9,597.90 |
| 80 | Queue protection truck (712-08.12) | DAY | 50 | $1,150.00 | $1,100.00 | $2,399.50 |
| 81 | Removable pavement marking (6" line) (712-09.08) | LF | 35,786 | $5.00 | $6.00 | $2.50 |
| 82 | Class A concrete (foundation for sign supports) (713-01.01) | CY | 4 | $670.00 | $670.00 | $2,415.00 |
| 83 | Steel bar reinforcement(foundation for sign supports) (713-01.02) | LB | 825 | $3.15 | $3.15 | $2.60 |
| 84 | Flexible delineator (white) (713-02.14) | EACH | 82 | $62.00 | $45.00 | $69.00 |
| 85 | Steel I-beams & WF-beams(breakaway) sign support (713-06) | LB | 6,204 | $7.98 | $7.98 | $8.10 |
| 86 | "U" section steel posts (713-11.01) | LB | 1,692 | $4.00 | $4.00 | $7.50 |
| 87 | Perforated/knockout square tube post (713-11.02) | LB | 595 | $4.10 | $4.10 | $9.50 |
| 88 | P post slip base (713-11.21) | EACH | 5 | $520.00 | $520.00 | $805.00 |
| 89 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 193 | $12.00 | $12.00 | $50.60 |
| 90 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 395 | $13.12 | $13.12 | $57.50 |
| 91 | Extruded aluminum panel signs (713-14) | SF | 737 | $30.75 | $30.75 | $89.70 |
| 92 | Removal of signs, posts and footings (713-15) | LS | 1 | $3,000.00 | $3,000.00 | $5,175.00 |
| 93 | Remove sign, support & footing (713-15.36) | EACH | 5 | $200.00 | $200.00 | $862.50 |
| 94 | Changeable message sign unit (713-16.01) | EACH | 2 | $5,100.00 | $5,900.00 | $8,280.00 |
| 95 | Jacked or bored conduit (714-03) | LF | 1,380 | $12.00 | $12.00 | $142.80 |
| 96 | Direct burial conduit (2" PVC, schedule 40) (714-03.01) | LF | 9,380 | $6.50 | $6.50 | $20.50 |
| 97 | Pull boxes (type C) (714-05.04) | EACH | 22 | $1,230.00 | $1,230.00 | $2,608.20 |
| 98 | Cable (1/C # 10 AWG) (714-06.03) | LF | 29,920 | $1.10 | $1.10 | $3.40 |
| 99 | Cable (1/C # 6 AWG) (714-06.05) | LF | 17,400 | $1.70 | $1.70 | $5.20 |
| 100 | Light standards (40' M.H.) (714-08.09) | EACH | 27 | $4,410.00 | $4,410.00 | $10,557 |
| 101 | Light standards (high mast - 100' M.H.) (714-08.11) | EACH | 6 | $46,760 | $46,760 | $89,424 |
| 102 | Foundation for light standards - high mast (high mast) (714-08.27) | EACH | 6 | $15,750 | $15,750 | $27,324 |
| 103 | Foundation for light standards - roadway (40' standard) (714-08.28) | EACH | 27 | $1,585.00 | $1,585.00 | $6,458.40 |
| 104 | LED luminaires (126 watt LED for offset poles) (714-09.47) | EACH | 27 | $1,310.00 | $1,310.00 | $1,614.60 |
| 105 | LED luminaires-high mast (4 luminaires @90 degrees, 199W) (714-09.64) | EACH | 2 | $5,000.00 | $5,000.00 | $5,713.20 |
| 106 | LED luminaires-high mast (4 luminaires @90 degrees, 295W) (714-09.65) | EACH | 4 | $5,235.00 | $5,235.00 | $8,073.00 |
| 107 | Control center (no. 1) (714-12.01) | LS | 1 | $12,300 | $12,300 | $52,164 |
| 108 | Control center (no. 2) (714-12.02) | LS | 1 | $12,300 | $12,300 | $52,164 |
| 109 | Electrical connection (control center no. 1) (714-25.01) | LS | 1 | $3,660.00 | $3,660.00 | $15,525 |
| 110 | Electrical connection (control center no. 2) (714-25.02) | LS | 1 | $3,695.00 | $3,695.00 | $15,525 |
| 111 | Raised PVMT markers (BI-directional) (1 color lens) (716-01.11) | EACH | 2,764 | $15.00 | $16.00 | $15.00 |
| 112 | Raised pavement marker removal (716-01.14) | EACH | 2,764 | $15.00 | $8.00 | $4.60 |
| 113 | Snowplowable raised pavement markers (BI-dir)(2 color) (716-01.23) | EACH | 352 | $45.00 | $50.00 | $63.30 |
| 114 | Removal of snowplowable reflective marker (716-01.30) | EACH | 228 | $20.00 | $10.00 | $13.80 |
| 115 | Plastic pavement marking (24" barrier line) (716-02.07) | LF | 343 | $20.00 | $25.00 | $12.90 |
| 116 | Painted pavement marking (6" line) (716-05.20) | LM | 8 | $1,500.00 | $2,800.00 | $1,840.00 |
| 117 | Painted pavement markings(8" line) (716-05.50) | LF | 1,366 | $1.50 | $2.80 | $2.80 |
| 118 | Removal of pavement marking (line) (716-08.20) | LM | 8 | $7,000.00 | $5,810.00 | $2,875.00 |
| 119 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 7 | $9,000.00 | $8,300.00 | $6,325.00 |
| 120 | Enhanced flatline thermo PVMT MRKNG (8IN barrier line) (716-12.03) | LF | 1,902 | $2.75 | $4.00 | $4.90 |
| 121 | Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05) | LF | 1,300 | $2.00 | $4.00 | $3.70 |
| 122 | Mobilization (717-01) | LS | 1 | $432,000 | $350,316 | $373,750 |
| 123 | Geotextile (type III)(erosion control) (740-10.03) | SY | 632 | $3.00 | $1.52 | $3.70 |
| 124 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 4,050 | $4.50 | $3.01 | $3.60 |
| 125 | Temporary sediment tube 12IN (740-11.02) | LF | 812 | $6.00 | $5.25 | $7.80 |
| 126 | Seeding (with mulch) (801-01) | UNIT | 302 | $55.00 | $35.00 | $89.70 |
| 127 | Temporary seeding (with mulch) (801-01.07) | UNIT | 441 | $50.00 | $25.00 | $48.30 |
| 128 | Grass seed mix (ripzn/FLPL) W/mulch (801-01.35) | UNIT | 8 | $150.00 | $100.00 | $105.80 |
| 129 | Seeding (without mulch) (801-02) | UNIT | 139 | $40.00 | $20.00 | $50.60 |
| 130 | Fertilizer (801-02.15) | TON | 9 | $400.00 | $1,250.00 | $977.50 |
| 131 | Water (seeding & sodding) (801-03) | MG | 88 | $20.00 | $40.00 | $34.50 |
| 132 | Cuttings: cornus amomum (18IN-24IN) (802-02.32) | EACH | 62 | $10.00 | $10.00 | $16.10 |
| 133 | Cuttings: cephalanthus occidentalis (18IN-24IN) (802-02.35) | EACH | 62 | $10.00 | $10.00 | $16.10 |
| 134 | Cuttings: platanus occidentalis (18IN-24IN) (802-02.38) | EACH | 63 | $10.00 | $10.00 | $16.10 |
| 135 | Cuttings: populus deltoides (18IN-24IN) (802-02.39) | EACH | 63 | $10.00 | $10.00 | $16.10 |
| 136 | Fagus grandifolia (beech seedlng B.R.) (802-12.15) | EACH | 10 | $10.00 | $20.00 | $32.20 |
| 137 | Liquidamber styraciflua (sweetgum seedlng B.R.) (802-12.18) | EACH | 10 | $10.00 | $20.00 | $27.60 |
| 138 | Liriodendron tulipifera (tulip poplar seedlng B.R.) (802-12.19) | EACH | 10 | $10.00 | $20.00 | $27.60 |
| 139 | Platanus occidentalis (sycamore seedlng B.R.) (802-12.26) | EACH | 10 | $10.00 | $20.00 | $27.60 |
| 140 | Sodding (new sod) (803-01) | SY | 30,574.67 | $4.50 | $3.35 | $6.60 |
| 141 | Turf reinforcement mat (class I) (805-01.01) | SY | 400.77 | $6.50 | $6.50 | $7.20 |
| 142 | Erosion control blanket (type I) (805-12.01) | SY | 244.71 | $2.00 | $1.50 | $2.70 |
| 143 | Erosion control blanket (type II) (805-12.02) | SY | 15,851.84 | $1.75 | $1.50 | $3.60 |
| 144 | Erosion control blanket (type III) (805-12.03) | SY | 230.67 | $2.00 | $2.00 | $4.90 |
| 145 | Trackless tack coat (403-02.01) | TON | 38 | $850.00 | $250.00 | $550.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of May 8, 2026. Compiled by Mirage Metrics.