| 1 | Construction stakes, lines and grades (105-01) | LS | 1 | $65,000 | $97,600 |
| 2 | Clearing and grubbing (201-01) | LS | 1 | $54,000 | $115,900 |
| 3 | Removal of structures and obstructions (202-01) | LS | 1 | $2,000.00 | $79,300 |
| 4 | Removal of asphalt pavement (202-03.01) | SY | 3,154 | $12.00 | $21.00 |
| 5 | Road & drainage excavation (unclassified) (203-01) | CY | 1,559 | $28.00 | $29.47 |
| 6 | Borrow excavation (unclassified) (203-03) | CY | 2,957 | $45.00 | $32.45 |
| 7 | Select granular material (203-03.10) | TON | 1,500 | $2.00 | $56.12 |
| 8 | Placing and spreading topsoil (203-04) | CY | 770 | $3.00 | $26.84 |
| 9 | Water (203-06) | MG | 40 | $100.00 | $79.30 |
| 10 | Furnishing & spreading topsoil (203-07) | CY | 151 | $5.00 | $46.36 |
| 11 | Backfill material (flowable fill) (204-08.01) | CY | 15 | $400.00 | $256.20 |
| 12 | Sediment removal (209-05) | CY | 94 | $30.00 | $43.92 |
| 13 | Temporary silt fence (without backing) (209-08.03) | LF | 1,146 | $2.00 | $5.12 |
| 14 | Enhanced rock check dam (209-08.08) | EACH | 3 | $2,100.00 | $1,525.00 |
| 15 | Catch basin protection (type A) (209-40.30) | EACH | 2 | $450.00 | $549.00 |
| 16 | Catch basin filter assembly(type 3) (209-40.43) | EACH | 1 | $850.00 | $1,159.00 |
| 17 | Mineral aggregate, type A base, grading D (303-01) | TON | 4,292 | $45.00 | $41.48 |
| 18 | Mineral aggregate (size 57) (303-10.01) | TON | 17 | $100.00 | $58.56 |
| 19 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading B-M2 (307-01.08) | TON | 140 | $180.00 | $156.16 |
| 20 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading A (307-02.01) | TON | 1,066 | $184.00 | $173.24 |
| 21 | Asphalt concrete mix (PG70-22) (BPMB-HM) grading B-M2 (307-02.08) | TON | 559 | $195.00 | $176.90 |
| 22 | Bituminous material for prime coat (PC) (402-01) | TON | 9 | $200.00 | $1,464.00 |
| 23 | Aggregate for cover material (PC) (402-02) | TON | 32 | $25.00 | $183.00 |
| 24 | Bituminous material for tack coat (TC) (403-01) | TON | 4 | $200.00 | $1,525.00 |
| 25 | Saw cutting asphalt pavement (407-20.05) | LF | 3,378 | $6.00 | $5.49 |
| 26 | Acs mix (PG64-22) grading E shoulder (411-01.07) | TON | 80 | $225.00 | $183.00 |
| 27 | Acs mix(PG70-22) grading D (411-02.10) | TON | 328 | $245.00 | $195.20 |
| 28 | 18" concrete pipe culvert (class III) (607-03.02) | LF | 188 | $60.00 | $134.20 |
| 29 | 18IN endwall (median drain) (611-07.73) | EACH | 4 | $5,000.00 | $2,196.00 |
| 30 | Catch basins, type 38, > 4' - 8' depth (611-38.02) | EACH | 1 | $5,500.00 | $6,344.00 |
| 31 | Junction structure, 60IN round,> 4FT-8FT depth (611-63.10) | EACH | 2 | $3,800.00 | $7,930.00 |
| 32 | Concrete median pavement (701-03) | CY | 300 | $225.00 | $634.40 |
| 33 | Concrete curb (702-01) | CY | 55 | $875.00 | $793.00 |
| 34 | Aggregate underdrains (with pipe) (710-02) | LF | 1,434 | $20.00 | $39.04 |
| 35 | Lateral underdrain (710-05) | LF | 70 | $18.00 | $34.16 |
| 36 | Lateral underdrain endwall (6:1) (710-06.15) | EACH | 14 | $1,300.00 | $1,464.00 |
| 37 | Traffic control (712-01) | LS | 1 | $77,500 | $164,700 |
| 38 | Flexible drums (channelizing) (712-04.01) | EACH | 277 | $35.00 | $91.50 |
| 39 | Warning lights (type C) (712-05.03) | EACH | 307 | $15.00 | $39.04 |
| 40 | Signs (construction) (712-06) | SF | 401 | $6.50 | $39.04 |
| 41 | Temporary barricades (type III) (712-07.03) | LF | 96 | $15.00 | $46.36 |
| 42 | Sign post delineation enhancement (713-02.21) | LF | 154 | $5.50 | $14.64 |
| 43 | "U" section steel posts (713-11.01) | LB | 1,989 | $4.50 | $6.41 |
| 44 | U post slip base (713-11.22) | EACH | 41 | $350.00 | $164.70 |
| 45 | Flat sheet aluminum signs (0.080" thick) (713-13.02) | SF | 54 | $14.00 | $51.24 |
| 46 | Flat sheet aluminum signs (0.100" thick) (713-13.03) | SF | 313 | $14.50 | $56.12 |
| 47 | Removal of signs, posts and footings (713-15) | LS | 1 | $300.00 | $6,100.00 |
| 48 | Plastic pavement marking(channelization striping) (716-02.04) | SY | 561 | $38.00 | $67.10 |
| 49 | Plastic pavement marking (stop line) (716-02.05) | LF | 93 | $25.00 | $26.84 |
| 50 | Plastic pavement marking (turn lane arrow) (716-02.06) | EACH | 7 | $250.00 | $335.50 |
| 51 | Plastic pavement marking (8" dotted line) (716-02.08) | LF | 826 | $4.00 | $10.37 |
| 52 | Plastic pavement marking (U turn arrow) (716-02.15) | EACH | 4 | $400.00 | $549.00 |
| 53 | Plastic pavement marking (yield line) (716-04.12) | SF | 24 | $31.00 | $54.90 |
| 54 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 1.58 | $11,600 | $10,004 |
| 55 | Enhanced flatline thermo PVMT MRKNG (8IN barrier line) (716-12.03) | LF | 2,097 | $4.00 | $9.15 |
| 56 | Enhanced flatline thermo PVMT MRKNG (6IN dotted line) (716-12.05) | LF | 515 | $4.00 | $7.93 |
| 57 | Mobilization (717-01) | LS | 1 | $98,000 | $213,500 |
| 58 | Geotextile (type III)(erosion control) (740-10.03) | SY | 106 | $10.00 | $6.71 |
| 59 | Geotextile (type IV)(stabilization) (740-10.04) | SY | 2,500 | $5.00 | $9.15 |
| 60 | Temporary sediment tube 18IN (740-11.03) | LF | 77 | $8.00 | $13.42 |
| 61 | Temporary seeding (with mulch) (801-01.07) | UNIT | 50 | $75.00 | $146.40 |
| 62 | Water (seeding & sodding) (801-03) | MG | 61 | $25.00 | $67.10 |
| 63 | Sodding (new sod) (803-01) | SY | 5,525 | $4.50 | $11.59 |