TDOT contract CN264013 bid tabulation
The resurfacing (microsurface or thin mix overlay) on s.r. 54 from near thomas street (l.m. 13.62) to the crockett county line (l.m. 24.63), including repair work on bridges. Let by Tennessee DOT on February 6, 2026, Haywood County. 3 bids received; low bid $2,415,468 by Ford Construction Company.
- Owner
- Tennessee DOT
- Letting
- 06 FEB 2026
- Pay items
- 31
- Data through
- 02 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ford Construction Company | $2,415,468 | Low |
| 2 | Delta Contracting Company, LLC | $2,559,296 | +6.0% |
| 3 | Asphalt Paving Systems, Inc. | $2,859,167 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ford Construction Company | 2. Delta Contracting Company, LLC | 3. Asphalt Paving Systems, Inc. |
|---|---|---|---|---|---|---|
| 1 | Removal of asphalt pavement (202-03.01) | SY | 228 | $64.40 | $20.00 | $59.33 |
| 2 | Water (203-06) | MG | 23 | $1.00 | $0.01 | $1.00 |
| 3 | Mineral aggregate, type B base, grading (C or D) (303-02) | TON | 3,006 | $30.00 | $35.00 | $55.15 |
| 4 | Asphalt concrete mix (PG64-22) (BPMB-HM) grading A (307-01.01) | TON | 105 | $195.00 | $225.00 | $395.00 |
| 5 | Asphalt emulsion (scrub seal) (414-04.03) | TON | 213 | $1,465.01 | $1,465.01 | $1,465.01 |
| 6 | Mineral aggregate (scrub seal) (414-04.04) | TON | 1,503 | $61.41 | $61.41 | $61.41 |
| 7 | Earth pad for type 38 GR end treatment (705-04.09) | EACH | 5 | $800.00 | $950.00 | $1,365.00 |
| 8 | GR terminal (in-inline) MASH TL-3 (705-06.11) | EACH | 1 | $1,950.00 | $1,000.00 | $1,155.00 |
| 9 | Tangent energy absorbing term MASH TL-3 (705-06.20) | EACH | 5 | $3,000.00 | $3,350.00 | $3,622.50 |
| 10 | Guardrail removed (706-01) | LF | 300 | $1.00 | $4.00 | $1.05 |
| 11 | Radius rail (706-06.03) | LF | 14 | $47.50 | $56.00 | $44.10 |
| 12 | Rounded end element (706-10.26) | EACH | 1 | $100.00 | $275.00 | $262.50 |
| 13 | Traffic control (712-01) | LS | 1 | $30,400 | $86,300 | $92,000 |
| 14 | Signs (construction) (712-06) | SF | 1,784 | $6.00 | $6.00 | $6.98 |
| 15 | Snowplowable raised pavement markers (BI-dir) (1 color) (716-01.21) | EACH | 755 | $50.00 | $50.00 | $52.50 |
| 16 | Removal of snowplowable reflective marker (716-01.30) | EACH | 450 | $12.00 | $15.00 | $10.00 |
| 17 | Painted pavement marking (6" line) (716-05.20) | LM | 83.20 | $2,100.00 | $2,100.00 | $2,205.00 |
| 18 | Removal of pavement marking (line) (716-08.20) | LM | 41.60 | $1,400.00 | $900.00 | $1,396.50 |
| 19 | Enhanced flatline thermo PVMT MRKNG (6IN line) (716-12.02) | LM | 41.60 | $7,900.00 | $7,900.00 | $8,295.00 |
| 20 | Mobilization (717-01) | LS | 1 | $40,000 | $104,000 | $64,000 |
| 21 | Flexible drums (channelizing) (712-04.01) | EACH | 170 | $1.00 | $1.00 | $21.00 |
| 22 | Bridge deck repairs (partial depth of slab) (604-10.50) | SY | 495 | $342.63 | $427.00 | $664.15 |
| 23 | Concrete repairs (604-10.53) | SY | 89 | $350.57 | $539.00 | $1,618.31 |
| 24 | Type 1 thin epoxy overlay (epoxy-urethane) (617-04.01) | SY | 5,722 | $37.50 | $38.32 | $42.90 |
| 25 | Bituminous material for tack coat (micro-surfacing) (403-01.01) | TON | 20 | $625.00 | ||
| 26 | Emulsified asphalt for micro-surfacing (414-03.01) | TON | 270 | $1,594.58 | ||
| 27 | Aggregate for micro surfacing (414-03.02) | TON | 2,237 | $94.80 | ||
| 28 | Cold planing bituminous pavement (415-01.01) | TON | 219 | $139.65 | ||
| 29 | Trackless tack coat (403-02.01) | TON | 32 | $1,000.00 | $500.00 | |
| 30 | Acs mix(PG64-22) thin lift asphalt (411-03.07) | TON | 4,814 | $144.00 | $142.00 | |
| 31 | Cold planing bituminous pavement (415-01.01) | TON | 357 | $104.00 | $90.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
Every contract let that day: TDOT letting of February 6, 2026. Compiled by Mirage Metrics.